Text

"VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 1,2002 U.S. Nuclear Regulatory Commission Serial No.02-056 Attention: Document Control Desk NAPS/MPW Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 Gentlemen:

NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS I AND 2 REVISION TO EMERGENCY PLAN IMPLEMENTING PROCEDURE Pursuant to 10 CFR 50.54(q), enclosed are recent revisions to a North Anna Power Station Emergency Plan Implementing Procedures. The revisions do not implement actions that decrease the effectiveness of our Emergency Plan. The Emergency Plan and Implementing Procedures continue to meet the standards of 10 CFR 50.47(b).

Please update your manual by performing the actions described in Attachment 1, Tabulation of Changes.

Very truly yours, D. A. Heacock Site Vice President Commitments Stated or Implied: None.

Enclosures cc:

U.S. Nuclear Regulatory Commission (2 copies)

Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station

ATTACHMENT I TABULATION OF CHANGES VIRGINIA ELECTRIC AND POWER COMPANY REVISION TO NORTH ANNA POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed is a recent revision to a North Anna Power Station Emergency Plan Implementing Procedure (EPIP). Please take the following actions in order to keep your manual updated.

Emerqency Plan Privacy and Proprietary Material has been removed. Reference Generic Letter No. 81-27.

DATE:

2002-01-28 PAGE:

1 I NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES CHECK DMIS FOR LATEST DOCUMENT INFORMATION DOCUMENT NUMBER EPIP-1.01 EPIP-1.02 EPIP-1.03 EPIP-1.04 EPIP-1.05 EPIP-1.06 EPIP-2.01 EPIP-2.02 EPIP-2.04 EPIP-3.02 EPIP-3.03 EPIP-3.04 EPIP-3.05 EPIP-4.01 EPIP-4.02 EPIP-4.03 EPIP-4.04 EPIP-4.05 EPIP-4.06 EPIP-4.07 EPIP-4.08 EPIP-4.09 EPIP-4.10 REV 034 011 014 014 016 004 024 014 003 018 012 015 001 017 012 011 009 009 009 014 013 012 010 APPROVAL

  • DATE*

07/26/01 09/07/99 09/07/99 09/07/99 09/07/99 09/05/01 09/24/01 01/04/99 08/07/92 12/17/97 12/20/93 07/14/98 09/07/99 10/09/01 07/25/00 12/20/93 11/21/94 01/28/00 12/21/95 09/29/00 07/26/01 07/26/01 04/23/98 EFFECT*

    • DATE*

09/13/01 10/01/99 10/01/99 10/01/99 10/01/99 09/05/01 09/26/01 01/29/99 08/07/92 01/07/98 01/01/94 07/20/98 10/01/99 10/17/01 08/02/00 01/01/94 11/28/94 02/04/00 12/28/95 10/06/00 09/13/01 09/13/01 04/28/98 DOCUMENT TITLE EMERGENCY MANAGER CONTROLLING PROCEDURE RESPONSE TO NOTIFICATION OF UNUSUAL EVENT RESPONSE TO ALERT RESPONSE TO SITE AREA EMERGENCY RESPONSE TO GENERAL EMERGENCY PROTECTIVE ACTION RECOMMENDATIONS NOTIFICATION OF STATE AND LOCAL GOVERNMENTS NOTIFICATION OF NRC TRANSMITTAL OF PLANT, RADIOLOGICAL AND EMERGENCY STATUS ACTIVATION OF TECHNICAL SUPPORT CENTER ACTIVATION OF OPERATIONAL SUPPORT CENTER ACTIVATION OF LOCAL EMERGENCY OPERATIONS FACILITY AUGMENTATION OF EMERGENCY RESPONSE ORGANIZATION RADIOLOGICAL ASSESSMENT DIRECTOR CONTROLLING PROCEDURE RADIATION PROTECTION SUPERVISOR CONTROLLING PROCEDURE DOSE ASSESSMENT TEAM CONTROLLING PROCEDURE EMERGENCY PERSONNEL RADIATION EXPOSURE RESPIRATORY PROTECTION AND KI ASSESSMENT PERSONNEL MONITORING AND DECONTAMINATION PROTECTIVE MEASURES INITIAL OFFSITE RELEASE ASSESSMENT SOURCE TERM ASSESSMENT DETERMINATION OF X/Q

DATE:

2002-01-28 PAGE:

2 NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES CHECK DMIS FOR LATEST DOCUMENT INFORMATION DOCUMENT NUMBER EPIP-4.13 EPIP-4.14 EPIP-4.15 EPIP-4.16 EPIP-4.17 EPIP-4.18 EPIP-4.21 EPIP-4.22 EPIP-4.23 EPIP-4.24 EPIP-4.25 EPIP-4.26 EPIP-4.28 EPIP-4.30 EPIP-4.31 EPIP-4.33 EPIP-4.34 EPIP-5.01 EPIP-5.03 EPIP-5.04 EPIP-5.05 EPIP-5.07 EPIP-5.08 REV 009 007 011 014 014 011 008 013 013 011 008 011 007 004 003 003 002 011 016 008 013 011 007 APPROVAL

%DATE**

09/29/00 12/20/93 02/18/00 02/18/00 08/12/98 08/12/98 12/20/93 04/02/93 03/13/96 01/25/02 07/23/93 07/26/01 01/09/97 01/04/99 06/20/94 11/28/00 02/18/00 12/11/96 02/18/00 07/20/99 06/25/96 07/25/00 11/28/00 EFFECT*

    • DATE*

10/06/00 01/01/94 02/28/00 02/28/00 08/14/98 08/14/98 01/01/94 04/02/93 03/18/96 01/28/02 07/23/93 09/13/01 01/14/97 01/08/99 06/20/94 11/30/00 02/28/00 12/17/96 02/28/00 07/22/99 07/02/96 08/02/00 11/30/00 DOCUMENT TITLE OFFSITE RELEASE ASSESSMENT WITH ENVIRONMENTAL DATA INPLANT MONITORING ONSITE MONITORING OFFSITE MONITORING MONITORING OF EMERGENCY RESPONSE FACILITIES MONITORING OF LEOF EVACUATION AND REMOTE ASSEMBLY AREA MONITORING POST ACCIDENT SAMPLING OF CONTAINMENT AIR POST ACCIDENT SAMPLING OF REACTOR COOLANT GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY LIQUID EFFLUENT SAMPLING DURING AN EMERGENCY HIGH LEVEL ACTIVITY SAMPLE ANALYSIS TSC/LEOF RADIATION MONITORING SYSTEM USE OF MIDAS CLASS A MODEL USE OF MIDAS CLASS B MODEL HEALTH PHYSICS NETWORK COMMUNICATIONS FIELD TEAM RADIO OPERATOR INSTRUCTIONS TRANSPORTATION OF CONTAMINATED INJURED PERSONNEL PERSONNEL ACCOUNTABILITY ACCESS CONTROL SITE EVACUATION ADMINISTRATION OF RADIOPROTECTIVE DRUGS DAMAGE CONTROL GUIDELINE

DATE:

2002-01-28 PAGE:

3 NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES CHECK DMIS FOR LATEST DOCUMENT INFORMATION DOCUMENT NUMBER EPIP-5.09 EPIP-6.01 APPROVAL REV

    • DATE*

003 03/26/99 007 05/12/99 EFFECT*

    • DATE**

03/31/99 DOCUMENT TITLE SECURITY TEAM LEADER CONTROLLING PROCEDURE 05/17/99 RE-ENTRY/RECOVERY GUIDELINE

VIRGINIA POWER NORTH ANNA POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 (With 4 Attachments)

PAGE 1 of 13 PURPOSE Provide guidance to personnel responsible for sampling high level radioactive gaseous effluents.

LEVJEL.'

And.Ann(o.-*U-*,", V0 ENTRY CONDITIONS Any one of the following:

1.

Direction by the Radiation Protection Supervisor.

2.

Direction by Dose Assessment Team Leader.

3.

Direction by the Radiation Assessment Director.

4.

Activation by another EPIP.

Approvals on File Effective Date

ACTION/EXPECTED RESPONSE F-1 INITIATE PROCEDURE:

  • By:

Date:

Time:

2 ASSEMBLE SAMPLING TEAM (Consider expertise and exposure when designating team members) 3 CONSIDER USE OF SHIELDING FOR SAMPLE TRANSPORT 4

CHECK IF EMERGENCY RADIATION EXPOSURE REQUIRED 5

ASK RAD TO INITIATE EPIP-4.04, EMERGENCY PERSONNEL RADIATION EXPOSURE RESPONSE NOT OBTAINED IF emergency radiation exposure NOT needed, THEN GO TO Step 6.

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 2 of 13 I-

ACTIONE*PECTE* RESPONSE RESPONSE NOT OBTAINED CAUTION:

During implementation of Design Change 99-006, Ventilation Radiation Monitoring System Replacement, the user needs to identify whether Kaman or MGPI monitor is being used (for GW-178, VG-179 and VG-180).

NOTE:

MGPI Normal Range Noble Gas monitors:

178-1, 179-1 and 180-1.

MGPI High Range Noble Gas monitors:

178-2. 179-2 and 180-2.

6 BRIEF SAMPLE TEAM:

  • Sampling location and monitor manufacturer
  • Sampling procedures
  • Sample type (e.g.,

Noble gas, Tritium, Iodine/Particulate)

  • Dose rates in sample location
  • Emergency dose authorization (if appropriate)
  • RWP requirements:

"* High and low range dosimetry or use of DADs

"* Wrist, head, and ankle TLDs

"* Protective clothing

"* Respiratory protection

  • "Buddy System" criteria
  • Ingress and egress routes considering:

"* Lowest dose fields

"* Hazards (i.e., high pressure steam, structural damage)

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 3 of 13

ACTION/EXPECTED RESPONSE F-F RESPONSE NOT OBTAINED 7

REVIEW SAMPLE LOCATIONS:

8 GET SAMPLE EQUIPMENT:

  • Poly bag

"* System

"* Date

"* Time

"* Volume labelled with:

to be sampled

  • 100 cc gas bomb
  • Silver zeolite cartridge and particulate patch
  • Tritium bubbler with 20 mls demineralized water
  • Tygon tubing and flow meter
  • Maps and sampling procedures
  • Portable monitoring equipment
  • 4 ft tongs and 3 ft extension lever from Count Room (for Kaman samples only)
  • MGPI grip tongs (for MGPI samples only)

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 4 of 13 I-MONITOR PRIMARY BACKUP Process Vent 274' Aux. Bldg. near 307' Service Bldg.

charcoal filter banks MGPI monitors Vent Vents Aux. Bldg. roof near 310' Turbine Bldg.

A and B elevator shaft Kaman High Range Vent Vent and MGPI monitors behind elevator shaft Unit 1 Air 303' Turbine Bldg. near None Ejector Powdex Resin Control Panel Unit 2 Air 279' Turbine Bldg. at the None Ejector Condenser Air Ejectors I

I I

ACTION/EXPECTED RESPONSE I-A RESPONSE NOT OBTAINED NOTE:

A portable transfer housing for Kaman samples, located at the High Range Calibration facility, will be used for personnel protection during the transfer of the filters as appropriate to maintain occupational ALARA.

A separate shield cart is available for MGPI samples.

9 EVALUATE METHODS AND MATERIALS FOR TRANSPORTATION OF HIGH ACTIVITY SAMPLES 10 NOTIFY RPS THAT TEAM IS BEING DISPATCHED 11 GO TO SAMPLE LOCATION:

a)

Use pre-planned route b) Verify dose rates within expected levels during transit b)

IF unexpected radiological conditions are encountered along the route, THEN do the following:

1) Use route of lowest dose field.
2) Notify RPS of radiological conditions.

c) Maintain ALARA NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 5 of 13 F-l I

-LIiEI-C ACTION/EXPECTED RESPONSE lI-F RESPONSE NOT OBTAINED 12 GET IODINE/PARTICULATE SAMPLE:

a) Maintain continuous exposure surveillance b) Check if normal gaseous effluent sampling systems to be used b) IF using Kaman Science System, THEN GO TO Step 13.

IF using MGPI, THEN do the following:

1) Use Attachment Sampling Using sample.
2)

GO TO Step 17.

c) Remove iodine/particulate sample assembly d)

Determine sample volume on first iodine/particulate sample (assume sample started at beginning of accidental release) e)

GO TO Step 17 NOTE:

  • The following steps are applicable Vents.

4, High-Range

MGPI, to take to the Process Vent and Vent
  • Kaman high range monitors contain three shielded Iodine/

Particulate sample containers (see Attachment 1).

Normal collection begins with sample container #1.

13 IDENTIFY SAMPLE CONTAINER THAT HAS COMPLETED COLLECTION (RED LIGHT ON)

IF collection NOT completed, THEN GO TO Step 15.

14 GO TO STEP 16 NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 6 of 13 H-sample m

l

ACTION/EXPECTED RESPONSE NOTE:

Sample collection time may take completion of Step 15.c.

15 TAKE ACTIONS FOR INCOMPLETE SAMPLE COLLECTION:

a) Get Kaman display panel key from HP Shift Supervisor AND go to the Control Room b) Insert key into Kaman display panel at Control Room (see )

c) Turn switch to "ENABLE" d) Press the following keys to switch from one container to another:

1) "FTN"
2) Select container:

RESPONSE NOT OBTAINED up to 15 minutes following a)

IF Kaman display panel key NOT available from HP Shift Supervisor, THEN get key from Control Room Shift Supervisor.

  • "3" for container #1 OR
  • "4" for container #2 OR
  • "5" for container #3
3)

"04"

4) "ENT" e) Verify sample collection light at local skid - ON e) IF sample collection light at local skid -
OFF, THEN do the following:
1) Wait in low dose area for 15 minute collection time to elapse
2) IF light NOT on after 15 minute collection time, THEN RETURN TO Step 15.b.

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 7 of 13 I-I

-LIii-t ACTION/EXPECTED RESPONSE F-A RESPONSE NOT OBTAINED 16 REMOVE SAMPLE:

a)

Open shield door on sample container (see Attachment 2) b) Slide extension lever over short metal rod located below collector assembly c) Unlock Iodine/Particulate collector assembly with 3 ft extension lever by turning lever to the right d)

Remove collector assembly with 4 ft long pair of tongs e) Place sample in designated container:

"* Labelled poly bag OR

"* Portable transfer housing f) Insert new silver zeolite and particulate filter g)

Lock collector assembly in place by turning short metal rod to the left with the extension lever g)

IF unable to remove sample, THEN REPEAT Steps 15.b through 16.d.

h) Close shield door NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 8 of 13 F-I I

ACTION/EXPECTED RESPONSE f-I 1STEP

____17 RESPONSE NOT OBTAINED IF noble gas sample NOT required, THEN do the following:

1) Assure iodine/particulate sample assembly is installed with a silver zeolite cartridge and particulate patch in place.
2)

GO TO Step 18.

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 9 of 13 GET NOBLE GAS SAMPLE (IF REQUIRED):

a) Assure charcoal cartridge (located in assembly upstream of noble gas chamber) is removed b) Assure particulate patch is in place c) Attach 100 cc sample chamber to the two sample valves at grab sample skid with flexible hose d) Establish flow through gas chamber:

1) Open both sample valves
2) Open petcocks on gas chamber
3) Slowly close bypass valve
4) Maintain flow to purge chamber e) Isolate gas chamber:
1) Open bypass valve
2) Close sample valves and petcocks f)

Remove gas chamber H-m

-LEJ-t ACTION/EXPECTED RESPONSE H-]

RESPONSE NOT OBTAINED CAUTION:

Make sure to open the flowmeter side (supply) before opening the bubbler (discharge).

Opening the discharge first may cause air pressure to push water from the bubbler into the flowmeter.

18 GET TRITIUM SAMPLE (IF REQUIRED):

a) Assure both particulate patch and charcoal filter are in place b) Attach tritium sampler:

1) Facing sample station, connect flowmeter hose to supply valve
2) Open flowmeter needle valve 3 turns
3) Connect bubble hose/bubbler assembly to discharge valve c) Establish flow through tritium sampler:
1) Open both sample valves at about the same time
2)

Slowly close bypass valve to establish a flowrate of about 2 Ipm

3) Adjust ratemeter, as necessary, to obtain 2 1pm
4) Allow flow for about 5 minutes:

"* Collect at least 500 mls (to meet LLD)

"* Note actual sample duration d) Isolate tritium sampler:

"* Open bypass valve

"* Close both sample valves at about the same time e) Remove tritium sampler apparatus GO TO Step 19.

NUMBER PROCEDURE TITLE.

REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 10 of 13 H-l I

I

-LSTEP ACTIONIEXPECTED RESPONSE F-]

RESPONSE NOT OBTAINED 19 CHECK SAMPLE READS GREATER THAN OR EQUAL TO 10 mR/hr 20 PREPARE SAMPLE FOR HOT LAB 21 DELIVER SAMPLE:

a) Place sample in clean poly bag b) Quickly leave area by preplanned route c) Record the following on sample:

"* Date

"* Time

"* Sample type

"* Volume (if normal gaseous effluent system used) d) Deposit sample in Count Room or Hot Lab IAW Step 19 e) Check sample taken using either of the following:

"* Normal gaseous effluent sampling systems

" MGPI f)

GO TO Step 28 IF sample reads LESS THAN 10 mR/hr, THEN do the following:

a) Prepare sample for Count Room.

b)

GO TO Step 21.

e) lF using Kaman Science System, THEN GO TO Step 22.

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 11 of 13 F-I I I I

RESPONSE NOT OBTAINEu-i---

NOTE:

Sample volume is in liters.

22 GET KAMAN SAMPLE VOLUME:

a)

Go to the Kaman control panel in the Control Room b)

Get sam le volume by pressing the following keystrokes:

1)

"DSP"

2) Select container:
  • "3" for container #1 OR
  • "4" for container #2 OR
  • "5" for container #3
3)

"37"

4)

"ENT" c) Clear sample volume by pressing the following keystrokes:

1) "STP"
2) Select container:
  • "3" for container #1 OR
  • "4" for container #2 OR
  • "5" for container #3
3)

"ENT" S_23 NOTIFY COUNT ROOM OR HOT LAB OF SAMPLE VOLUME NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 12 of 13 l

ACTION/EXPECTED RESPONSE

[-

24 CHECK IF ADDITIONAL KAMAN SAMPLE 24 CHECK IF ADDITIONAL KAMAN SAMPLE COLLECTIONS REQUIRED 25 RETURN TO STEP 15.b 26 TURN KEY TO THE DISABLE POSITION 27 REMOVE KEY AND GIVE IT TO THE HP OR CONTROL ROOM SHIFT SUPERVISOR 28 NOTIFY RPS SAMPLING COMPLETE 29 TERMINATE EPIP-4.24:

a) Give completed EPIP-4.24, forms and other applicable records to the RPS b) Completed by:

Date:

Time:

RESPONSE NOT OBTAINED GO TO Step 26.

-END-NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 13 of 13

-LiE1--C H-

Indicator Lights Particulate/Iodine Sample Collectors KAMAN HIGH RANGE MONITOR NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 KAMAN HIGH RANGE MONITOR 11 ATTACHMENT PAGE L1 1 of 1 I

Direction of Flow Shield Door I

Graphics No: PC5&

P/I Sample Collector PARTICULATE/IODINE SAMPLE COLLECTOR NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 KAMAN PARTICULATE/IODINE SAMPLE COLLECTOR 11 ATTACHMENT PAGE 2

1 of I KAMAN

G0-HIgh Al Rate-Test AkAck Ack Lt Ck Power Proc Alar Eqip Comm DFub.ai FUNCT CHAN PARAMETER RIFEH7 LU5 VALUE Graphria No. CBI591G KAMAN DISPLAY PANEL (KERIC)

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 KAMAN DISPLAY PANEL 11 ATTACHMENT (KERIC)

PAGE 3

1 of 1 0

0 DSP A[S PRG F

FPM -m ENA] [EN

[EXP TST T HS ENT]

W6L7 W 7 L

NOTE:

Ball valves V-11 and V-12 are used to turn on or shut off "accident sampling flow through the first shielded Particulate/Iodine Sampler (PIS#1).

V-13 and V-14 are used for the second shielded Particulate/

Iodine Sampler (PIS#2).

I.

PREPARE FOR SAMPLING

1. Verify shielded Particulate/Iodine (P/I) sample is loaded in PIS#1 or PIS#2.

IF P/I sample NOT loaded, THEN do the following:

a.

Verify which PIS to be loaded.

b.

Prepare a new P/I holder.

c.

Line up PIS#1 (PIS#2) by opening V-13 (V-I1) and V-14 (V-12).

d.

Close V-li (V-13) and V-12 (V-14).

e.

Open the PIS door.

2. Insert the new holder into the PIS and close the door.
3.

Notify Control Room of sampling for any alarms.

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4

1 of 5

CAUTION:

Although analog outputs will be frozen at last value, digital ports and log commands remain operational while in Program Mode.

NOTE:

Flow rate through the PIS is totalized by FIT-2 (the flow transmitter for the accident sampling flow path) and by the Local Processing Unit (LPU).

Both totalizers must be reset when switching or replacing PIS samples.

Only the Local Display Unit (LDU) totalizer resets when the vent monitor switches from NORMAL mode to ACCIDENT mode and places the shielded PIS in service.

"* The keypad sequence to escape is CC.

"* The keypad sequence for HELP is HH.

"* The display will continue to scroll options while in normal operation.

II.

RESET THE FIT-2 TOTALIZER (USING THE MASS FLOW TRANSMITTER KEYPAD)

1. Turn (unscrew) cover to access keypad.
2. Press P key on Mass Flow Transmitter keypad.

The following message screens will appear for about 3 seconds each:

! WARNING ! NO OUTPUT UPDATES WHILE IN PROGRAM MODE (SECTION II CONTINUED ON NEXT PAGE)

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4

2 of 5

II.

RESET THE FIT-2 TOTALIZER (USING THE MASS FLOW TRANSMITTER KEYPAD)

[continued]

3.

WHEN the "ENTER ACCESS CODE" message screen appears, ENTER ACCESS CODE:

THEN enter the user access code followed by the E key (ENTER).

ENTER ACCESS CODE: 123456 (Press E key.)

The following messages will alternate on the display screen:

PRESS E TO SET PRESS P TO SEE SYSTEM OF UNITS NEXT CHOICE OR

4. Press the P key (NEXT).

The following messages will alternate on the display screen:

PRESS E TO PRESS P TO SEE RESET TOTALIZER NEXT CHOICE OR

5.

Press the E key (ENTER) to reset the totalizer.

The following message will appear:

ARE YOU SURE?

/\\=YES \\/=NO : NO

6. Press the /\\

(Up Arrow)

(YES) key.

The following message will appear:

7.

8.

ARE YOU SURE?

/\\=YES

\\/=NO : YES Press the E key (ENTER) to complete totalizer reset.

Press C key twice (CC)

(ESCAPE) to close.

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4

3 of 5

III.

RESET THE FIT-2 TOTALIZER DISPLAY ON THE LOCAL DISPLAY UNIT

1. Record the FIT-2 totalizer reading from the LOU (D PISTotal 3 RT-3-P).
2. Reset the FIT-2 totalizer display on the LDU.
a. Press Sel key on LDU keypad repeatedly until COMMAND screen is displayed.
b.

Press up or down key on LOU keypad repeatedly until R/FIT-2 is hi lighted.

c. Press Sel key on LOU keypad repeatedly until field to right of the command changes to "1".
d. Press up or down key on LOU keypad repeatedly until cursor is at first (next) digit in 4-digit password field.

Password is 0000 (four zeroes).

e.

Press Sel key on LOU keypad repeatedly until digit changes to first digit of the password.

f.

Repeat steps d and e until all four digits of password entered.

g. Press up or down arrow repeatedly until Confirm is hi lighted.
h. Press Sel key on LOU keypad to confirm the command.

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4

4 of 5

NOTE:

For PIS#1 to be in service, V-11 and V-12 are open, and V-13 and V-14 are closed.

For PIS#2 to be service V-13 and V-14 are open, and V-11 and V-12 are closed.

IV.

REMOVE SAMPLE AND DELIVER TO COUNT ROOM

1. Verify which PIS to be changed.
2. Prepare a new P/I holder to replace the one to be removed.
3.

Change out PIS#1 (PIS#2) by opening V-13 (V-11) and V-14 (V-12).

4. Close V-11 (V-13) and V-12 (V-14).
5. Use grip tong to open PIS door and grab P/I holder.
6.

Place P/I holder inside shielded cart and close cart door.

7. Insert new holder into PIS and close PIS door.
8. Deliver sample to Count Room.

NOTE:

Part V, Install New Particulate/Iodine Holder, below is applicable when there is no P/I sampler installed.

V.

INSTALL NEW PARTICULATE/IODINE HOLDER

1.

Verify which PIS to be loaded.

2.

Prepare a new P/I holder.

3. Line up PIS#1 (PIS#2) by opening V-13 (V-11) and V-14 (V-12).
4. Close V-11 (V-13) and V-12 (V-14).
5.

Open the PIS door.

6. Insert the new holder into the PIS and close the door.

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4

5 of 5