ML020650032

From kanterella
Jump to navigation Jump to search
Revised Emergency Plan Implementing Procedure EPIP-4.24 (Revision 11)
ML020650032
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/01/2002
From: Heacock D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-056
Download: ML020650032 (26)


Text

"VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 1,2002 U.S. Nuclear Regulatory Commission Serial No.02-056 Attention: Document Control Desk NAPS/MPW Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 Gentlemen: NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS I AND 2 REVISION TO EMERGENCY PLAN IMPLEMENTING PROCEDURE Pursuant to 10 CFR 50.54(q), enclosed are recent revisions to a North Anna Power Station Emergency Plan Implementing Procedures. The revisions do not implement actions that decrease the effectiveness of our Emergency Plan. The Emergency Plan and Implementing Procedures continue to meet the standards of 10 CFR 50.47(b).

Please update your manual by performing the actions described in Attachment 1, Tabulation of Changes.

Very truly yours, D. A. Heacock Site Vice President Commitments Stated or Implied: None.

Enclosures cc: U.S. Nuclear Regulatory Commission (2 copies)

Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station

ATTACHMENT I TABULATION OF CHANGES VIRGINIA ELECTRIC AND POWER COMPANY REVISION TO NORTH ANNA POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed is a recent revision to a North Anna Power Station Emergency Plan Implementing Procedure (EPIP). Please take the following actions in order to keep your manual updated.

Emerqency Plan Privacy and Proprietary Material has been removed. Reference Generic Letter No. 81-27.

DATE: 2002-01-28 PAGE: 1I NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES CHECK DMIS FOR LATEST DOCUMENT INFORMATION APPROVAL EFFECT*

DOCUMENT NUMBER REV *DATE* **DATE* DOCUMENT TITLE EPIP-1.01 034 07/26/01 09/13/01 EMERGENCY MANAGER CONTROLLING PROCEDURE EPIP-1.02 011 09/07/99 10/01/99 RESPONSE TO NOTIFICATION OF UNUSUAL EVENT EPIP-1.03 014 09/07/99 10/01/99 RESPONSE TO ALERT EPIP-1.04 014 09/07/99 10/01/99 RESPONSE TO SITE AREA EMERGENCY EPIP-1.05 016 09/07/99 10/01/99 RESPONSE TO GENERAL EMERGENCY EPIP-1.06 004 09/05/01 09/05/01 PROTECTIVE ACTION RECOMMENDATIONS EPIP-2.01 024 09/24/01 09/26/01 NOTIFICATION OF STATE AND LOCAL GOVERNMENTS EPIP-2.02 014 01/04/99 01/29/99 NOTIFICATION OF NRC EPIP-2.04 003 08/07/92 08/07/92 TRANSMITTAL OF PLANT, RADIOLOGICAL AND EMERGENCY STATUS EPIP-3.02 018 12/17/97 01/07/98 ACTIVATION OF TECHNICAL SUPPORT CENTER EPIP-3.03 012 12/20/93 01/01/94 ACTIVATION OF OPERATIONAL SUPPORT CENTER EPIP-3.04 015 07/14/98 07/20/98 ACTIVATION OF LOCAL EMERGENCY OPERATIONS FACILITY EPIP-3.05 001 09/07/99 10/01/99 AUGMENTATION OF EMERGENCY RESPONSE ORGANIZATION EPIP-4.01 017 10/09/01 10/17/01 RADIOLOGICAL ASSESSMENT DIRECTOR CONTROLLING PROCEDURE EPIP-4.02 012 07/25/00 08/02/00 RADIATION PROTECTION SUPERVISOR CONTROLLING PROCEDURE EPIP-4.03 011 12/20/93 01/01/94 DOSE ASSESSMENT TEAM CONTROLLING PROCEDURE EPIP-4.04 009 11/21/94 11/28/94 EMERGENCY PERSONNEL RADIATION EXPOSURE EPIP-4.05 009 01/28/00 02/04/00 RESPIRATORY PROTECTION AND KI ASSESSMENT EPIP-4.06 009 12/21/95 12/28/95 PERSONNEL MONITORING AND DECONTAMINATION EPIP-4.07 014 09/29/00 10/06/00 PROTECTIVE MEASURES EPIP-4.08 013 07/26/01 09/13/01 INITIAL OFFSITE RELEASE ASSESSMENT EPIP-4.09 012 07/26/01 09/13/01 SOURCE TERM ASSESSMENT EPIP-4.10 010 04/23/98 04/28/98 DETERMINATION OF X/Q

DATE: 2002-01-28 PAGE: 2 NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES CHECK DMIS FOR LATEST DOCUMENT INFORMATION APPROVAL EFFECT*

DOCUMENT NUMBER REV %DATE** **DATE* DOCUMENT TITLE EPIP-4 .13 009 09/29/00 10/06/00 OFFSITE RELEASE ASSESSMENT WITH ENVIRONMENTAL DATA EPIP-4.14 007 12/20/93 01/01/94 INPLANT MONITORING EPIP-4.15 011 02/18/00 02/28/00 ONSITE MONITORING EPIP-4.16 014 02/18/00 02/28/00 OFFSITE MONITORING EPIP-4.17 014 08/12/98 08/14/98 MONITORING OF EMERGENCY RESPONSE FACILITIES EPIP-4.18 011 08/12/98 08/14/98 MONITORING OF LEOF EPIP-4.21 008 12/20/93 01/01/94 EVACUATION AND REMOTE ASSEMBLY AREA MONITORING EPIP-4.22 013 04/02/93 04/02/93 POST ACCIDENT SAMPLING OF CONTAINMENT AIR EPIP-4.23 013 03/13/96 03/18/96 POST ACCIDENT SAMPLING OF REACTOR COOLANT EPIP-4.24 011 01/25/02 01/28/02 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY EPIP-4.25 008 07/23/93 07/23/93 LIQUID EFFLUENT SAMPLING DURING AN EMERGENCY EPIP-4.26 011 07/26/01 09/13/01 HIGH LEVEL ACTIVITY SAMPLE ANALYSIS EPIP-4.28 007 01/09/97 01/14/97 TSC/LEOF RADIATION MONITORING SYSTEM EPIP-4.30 004 01/04/99 01/08/99 USE OF MIDAS CLASS A MODEL EPIP-4.31 003 06/20/94 06/20/94 USE OF MIDAS CLASS B MODEL EPIP-4.33 003 11/28/00 11/30/00 HEALTH PHYSICS NETWORK COMMUNICATIONS EPIP-4.34 002 02/18/00 02/28/00 FIELD TEAM RADIO OPERATOR INSTRUCTIONS EPIP-5.01 011 12/11/96 12/17/96 TRANSPORTATION OF CONTAMINATED INJURED PERSONNEL EPIP-5.03 016 02/18/00 02/28/00 PERSONNEL ACCOUNTABILITY EPIP-5.04 008 07/20/99 07/22/99 ACCESS CONTROL EPIP-5.05 013 06/25/96 07/02/96 SITE EVACUATION EPIP-5.07 011 07/25/00 08/02/00 ADMINISTRATION OF RADIOPROTECTIVE DRUGS EPIP-5.08 007 11/28/00 11/30/00 DAMAGE CONTROL GUIDELINE

DATE: 2002-01-28 PAGE: 3 NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES CHECK DMIS FOR LATEST DOCUMENT INFORMATION APPROVAL EFFECT*

DOCUMENT NUMBER REV **DATE* **DATE** DOCUMENT TITLE EPIP-5.09 003 03/26/99 03/31/99 SECURITY TEAM LEADER CONTROLLING PROCEDURE EPIP-6.01 007 05/12/99 05/17/99 RE-ENTRY/RECOVERY GUIDELINE

VIRGINIA POWER NORTH ANNA POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 (With 4 Attachments) PAGE 1 of 13 PURPOSE Provide guidance to personnel responsible for sampling high level radioactive gaseous effluents.

LEVJEL.'

And .Ann(o.-*U-*,", V0 ENTRY CONDITIONS Any one of the following:

1. Direction by the Radiation Protection Supervisor.
2. Direction by Dose Assessment Team Leader.
3. Direction by the Radiation Assessment Director.
4. Activation by another EPIP.

Approvals on File Effective Date

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 2 of 13 ACTION/EXPECTED RESPONSE F- RESPONSE NOT OBTAINED I-1 INITIATE PROCEDURE:

  • By:

Date:

Time:

2 ASSEMBLE SAMPLING TEAM (Consider expertise and exposure when designating team members)

__ 3 CONSIDER USE OF SHIELDING FOR SAMPLE TRANSPORT 4 CHECK IF EMERGENCY RADIATION IF emergency radiation exposure EXPOSURE - REQUIRED NOT needed, THEN GO TO Step 6.

__ 5 ASK RAD TO INITIATE EPIP-4.04, EMERGENCY PERSONNEL RADIATION EXPOSURE

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 3 of 13 ACTIONE*PECTE* RESPONSE

  • RESPONSE NOT OBTAINED CAUTION: During implementation of Design Change 99-006, Ventilation Radiation Monitoring System Replacement, the user needs to identify whether Kaman or MGPI monitor is being used (for GW-178, VG-179 and VG-180).

NOTE: MGPI Normal Range Noble Gas monitors: 178-1, 179-1 and 180-1. MGPI High Range Noble Gas monitors: 178-2. 179-2 and 180-2.

___ 6 BRIEF SAMPLE TEAM:

  • Sampling location and monitor manufacturer
  • Sampling procedures
  • Sample type (e.g., Noble gas, Tritium, Iodine/Particulate)
  • Dose rates in sample location
  • Emergency dose authorization (if appropriate)
  • RWP requirements:

"*High and low range dosimetry or use of DADs

"*Wrist, head, and ankle TLDs

"*Protective clothing

"*Respiratory protection

  • "Buddy System" criteria
  • Ingress and egress routes considering:

"*Lowest dose fields

"*Hazards (i.e., high pressure steam, structural damage)

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 4 of 13 ACTION/EXPECTED RESPONSE F-F I RESPONSE NOT OBTAINED I-

___ 7 REVIEW SAMPLE LOCATIONS: I MONITOR PRIMARY BACKUP Process Vent 274' Aux. Bldg. near 307' Service Bldg.

charcoal filter banks MGPI monitors Vent Vents Aux. Bldg. roof near 310' Turbine Bldg.

A and B elevator shaft Kaman High Range Vent Vent and MGPI monitors behind elevator shaft Unit 1 Air 303' Turbine Bldg. near None Ejector Powdex Resin Control Panel Unit 2 Air 279' Turbine Bldg. at the None Ejector Condenser Air Ejectors

- 8 GET SAMPLE EQUIPMENT:

  • Poly bag labelled with:

"*System to be sampled

"* Date

"*Time

"*Volume

  • 100 cc gas bomb
  • Silver zeolite cartridge and particulate patch
  • Silver zeolite sample holder
  • Tritium bubbler with 20 mls demineralized water
  • Tygon tubing and flow meter
  • Maps and sampling procedures
  • Portable monitoring equipment
  • 4 ft tongs and 3 ft extension lever from Count Room (for Kaman samples only)
  • MGPI grip tongs (for MGPI samples only) I

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 5 of 13 ACTION/EXPECTED RESPONSE I-A l

RESPONSE NOT OBTAINED F-I NOTE: A portable transfer housing for Kaman samples, located at the High Range Calibration facility, will be used for personnel protection during the transfer of the filters as appropriate to maintain occupational ALARA. A separate shield cart is available for MGPI samples.

__ 9 EVALUATE METHODS AND MATERIALS FOR TRANSPORTATION OF HIGH ACTIVITY SAMPLES 10 NOTIFY RPS THAT TEAM IS BEING DISPATCHED 11 GO TO SAMPLE LOCATION:

a) Use pre-planned route b) Verify dose rates within b) IF unexpected radiological expected levels during transit conditions are encountered along the route, THEN do the following:

1) Use route of lowest dose field.
2) Notify RPS of radiological conditions.

c) Maintain ALARA

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 6 of 13

-LIiEI-C ACTION/EXPECTED RESPONSE lI-F m

  • RESPONSE NOT OBTAINED l

H-12 GET IODINE/PARTICULATE SAMPLE:

a) Maintain continuous exposure surveillance b) Check if normal gaseous b) IF using Kaman Science System, effluent sampling systems to be THEN GO TO Step 13.

used IF using MGPI, THEN do the following:

1) Use Attachment 4, High-Range Sampling Using MGPI, to take sample.
2) GO TO Step 17.

c) Remove iodine/particulate sample assembly d) Determine sample volume on first iodine/particulate sample (assume sample started at beginning of accidental release) e) GO TO Step 17 NOTE:

  • The following steps are applicable to the Process Vent and Vent Vents.
  • Kaman high range monitors contain three shielded Iodine/

Particulate sample containers (see Attachment 1). Normal sample collection begins with sample container #1.

_ 13 IDENTIFY SAMPLE CONTAINER THAT HAS IF collection NOT completed, THEN COMPLETED COLLECTION (RED LIGHT ON) GO TO Step 15.

___ 14 GO TO STEP 16

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 7 of 13 ACTION/EXPECTED RESPONSE I

RESPONSE NOT OBTAINED I-NOTE: Sample collection time may take up to 15 minutes following completion of Step 15.c.

_ 15 TAKE ACTIONS FOR INCOMPLETE SAMPLE COLLECTION:

a) Get Kaman display panel key a) IF Kaman display panel key NOT from HP Shift Supervisor AND go available from HP Shift to the Control Room Supervisor, THEN get key from Control Room Shift Supervisor.

b) Insert key into Kaman display panel at Control Room (see Attachment 3) c) Turn switch to "ENABLE" d) Press the following keys to switch from one container to another:

1) "FTN"
2) Select container:
  • "3" for container #1 OR
  • "4" for container #2 OR
  • "5" for container #3
3) "04"
4) "ENT" e) Verify sample collection light e) IF sample collection light at at local skid - ON local skid - OFF, THEN do the following:
1) Wait in low dose area for 15 minute collection time to elapse
2) IF light NOT on after 15 minute collection time, THEN RETURN TO Step 15.b.

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 8 of 13

-LIii-t ACTION/EXPECTED RESPONSE F-A I RESPONSE NOT OBTAINED F-I

_ 16 REMOVE SAMPLE:

a) Open shield door on sample container (see Attachment 2) b) Slide extension lever over short metal rod located below collector assembly c) Unlock Iodine/Particulate collector assembly with 3 ft extension lever by turning lever to the right d) Remove collector assembly with 4 ft long pair of tongs e) Place sample in designated container:

"* Labelled poly bag OR

"* Portable transfer housing f) Insert new silver zeolite and particulate filter g) Lock collector assembly in g) IF unable to remove sample, place by turning short metal THEN REPEAT Steps 15.b rod to the left with the through 16.d.

extension lever h) Close shield door

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 9 of 13 1STEP ACTION/EXPECTED RESPONSE f-I m

RESPONSE NOT OBTAINED H-

____17 GET NOBLE GAS SAMPLE (IF REQUIRED): IF noble gas sample NOT required, THEN do the following:

a) Assure charcoal cartridge (located in assembly upstream 1) Assure iodine/particulate of noble gas chamber) is removed sample assembly is installed with a silver zeolite cartridge b) Assure particulate patch is in and particulate patch in place.

place

2) GO TO Step 18.

c) Attach 100 cc sample chamber to the two sample valves at grab sample skid with flexible hose d) Establish flow through gas chamber:

1) Open both sample valves
2) Open petcocks on gas chamber
3) Slowly close bypass valve
4) Maintain flow to purge chamber e) Isolate gas chamber:
1) Open bypass valve
2) Close sample valves and petcocks f) Remove gas chamber

NUMBER PROCEDURE TITLE. REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 10 of 13

-LEJ-t ACTION/EXPECTED RESPONSE H-]

l I RESPONSE NOT OBTAINED I

H-CAUTION: Make sure to open the flowmeter side (supply) before opening the bubbler (discharge). Opening the discharge first may cause air pressure to push water from the bubbler into the flowmeter.

___ 18 GET TRITIUM SAMPLE (IF REQUIRED): GO TO Step 19.

a) Assure both particulate patch and charcoal filter are in place b) Attach tritium sampler:

1) Facing sample station, connect flowmeter hose to supply valve
2) Open flowmeter needle valve 3 turns
3) Connect bubble hose/bubbler assembly to discharge valve c) Establish flow through tritium sampler:
1) Open both sample valves at about the same time
2) Slowly close bypass valve to establish a flowrate of about 2 Ipm
3) Adjust ratemeter, as necessary, to obtain 2 1pm
4) Allow flow for about 5 minutes:

"*Collect at least 500 mls (to meet LLD)

"* Note actual sample duration d) Isolate tritium sampler:

"*Open bypass valve

"*Close both sample valves at about the same time e) Remove tritium sampler apparatus

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 11 of 13

-LSTEP ACTIONIEXPECTED RESPONSE F-]

I RESPONSE NOT OBTAINED F-IF sample reads LESS THAN 10 19 CHECK SAMPLE READS GREATER THAN OR EQUAL TO 10 mR/hr mR/hr, THEN do the following:

a) Prepare sample for Count Room.

b) GO TO Step 21.

20 PREPARE SAMPLE FOR HOT LAB 21 DELIVER SAMPLE:

a) Place sample in clean poly bag b) Quickly leave area by preplanned route c) Record the following on sample:

"*Date

"*Time

"*Sample type

"* Volume (if normal gaseous effluent system used) d) Deposit sample in Count Room or Hot Lab IAW Step 19 e) Check sample taken using either of the following:

e) lF using Kaman Science System, THEN GO TO Step 22. I

"*Normal gaseous effluent sampling systems I

" MGPI f) GO TO Step 28

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 12 of 13 RESPONSE NOT OBTAINE u-i---l NOTE: Sample volume is in liters.

22 GET KAMAN SAMPLE VOLUME:

a) Go to the Kaman control panel in the Control Room b) Get sam le volume by pressing the following keystrokes:

1) "DSP"
2) Select container:
  • "3" for container #1 OR
  • "4" for container #2 OR
  • "5" for container #3
3) "37"
4) "ENT" c) Clear sample volume by pressing the following keystrokes:
1) "STP"
2) Select container:
  • "3" for container #1 OR
  • "4" for container #2 OR
  • "5" for container #3
3) "ENT" S_23 NOTIFY COUNT ROOM OR HOT LAB OF SAMPLE VOLUME

NUMBER PROCEDURE TITLE REVISION EPIP-4.24 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY 11 PAGE 13 of 13

-LiE1--C ACTION/EXPECTED RESPONSE CHECK24 IF ADDITIONAL KAMAN SAMPLE

[- RESPONSE NOT OBTAINED H-24 CHECK IF ADDITIONAL KAMAN SAMPLE GO TO Step 26.

COLLECTIONS - REQUIRED 25 RETURN TO STEP 15.b 26 TURN KEY TO THE DISABLE POSITION 27 REMOVE KEY AND GIVE IT TO THE HP OR CONTROL ROOM SHIFT SUPERVISOR 28 NOTIFY RPS SAMPLING COMPLETE 29 TERMINATE EPIP-4.24:

a) Give completed EPIP-4.24, forms and other applicable records to the RPS b) Completed by:

Date:

Time:

-END-

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 KAMAN HIGH RANGE MONITOR 11 ATTACHMENT PAGE L1 1 of 1 Indicator Lights I

Particulate/Iodine Sample Collectors KAMAN HIGH RANGE MONITOR

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 KAMAN PARTICULATE/IODINE SAMPLE COLLECTOR 11 ATTACHMENT PAGE 2 1 of I Direction .

of Flow Shield Door I GraphicsNo: PC5&

P/I Sample Collector KAMAN PARTICULATE/IODINE SAMPLE COLLECTOR

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 KAMAN DISPLAY PANEL 11 ATTACHMENT (KERIC) PAGE 3 1 of 1 G0-HIgh AkAck Al Rate-Ack Test Lt Ck Power Proc Alar Eqip Comm DFub.ai 0 0 FUNCT CHAN PARAMETER RIFEH7 VALUE LU5 DSP A[S FPRG FPM-m ENA] [EN [EXP W6L7 W 7 L TST T HS ENT]

Graphria No. CBI591G KAMAN DISPLAY PANEL (KERIC)

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4 1 of 5 NOTE: Ball valves V-11 and V-12 are used to turn on or shut off "accident sampling flow through the first shielded Particulate/Iodine Sampler (PIS#1). V-13 and V-14 are used for the second shielded Particulate/

Iodine Sampler (PIS#2).

I. PREPARE FOR SAMPLING

1. Verify shielded Particulate/Iodine (P/I) sample is loaded in PIS#1 or PIS#2.

IF P/I sample NOT loaded, THEN do the following:

a. Verify which PIS to be loaded.
b. Prepare a new P/I holder.
c. Line up PIS#1 (PIS#2) by opening V-13 (V-I1) and V-14 (V-12).
d. Close V-li (V-13) and V-12 (V-14).
e. Open the PIS door.
2. Insert the new holder into the PIS and close the door.
3. Notify Control Room of sampling for any alarms.

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4 2 of 5 CAUTION: Although analog outputs will be frozen at last value, digital ports and log commands remain operational while in Program Mode.

NOTE: Flow rate through the PIS is totalized by FIT-2 (the flow transmitter for the accident sampling flow path) and by the Local Processing Unit (LPU). Both totalizers must be reset when switching or replacing PIS samples. Only the Local Display Unit (LDU) totalizer resets when the vent monitor switches from NORMAL mode to ACCIDENT mode and places the shielded PIS in service.

"* The keypad sequence to escape is CC.

"* The keypad sequence for HELP is HH.

"* The display will continue to scroll options while in normal operation.

II. RESET THE FIT-2 TOTALIZER (USING THE MASS FLOW TRANSMITTER KEYPAD)

1. Turn (unscrew) cover to access keypad.
2. Press P key on Mass Flow Transmitter keypad.

The following message screens will appear for about 3 seconds each:

! WARNING ! NO WHILE IN OUTPUT UPDATES PROGRAM MODE (SECTION II CONTINUED ON NEXT PAGE)

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4 3 of 5 II. RESET THE FIT-2 TOTALIZER (USING THE MASS FLOW TRANSMITTER KEYPAD)

[continued]

3. WHEN the "ENTER ACCESS CODE" message screen appears, ENTER ACCESS CODE:

THEN enter the user access code followed by the E key (ENTER).

ENTER ACCESS CODE: 123456 (Press E key.)

The following messages will alternate on the display screen:

PRESS E TO SET PRESS P TO SEE SYSTEM OF UNITS NEXT CHOICE OR

4. Press the P key (NEXT).

The following messages will alternate on the display screen:

PRESS E TO PRESS P TO SEE RESET TOTALIZER NEXT CHOICE OR

- 5. Press the E key (ENTER) to reset the totalizer.

The following message will appear: ARE YOU SURE?

/\=YES \/=NO : NO

6. Press the /\ (Up Arrow) (YES) key.

The following message will appear: ARE YOU SURE?

/\=YES \/=NO : YES

7. Press the E key (ENTER) to complete totalizer reset.
8. Press C key twice (CC) (ESCAPE) to close.

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4 4 of 5 III. RESET THE FIT-2 TOTALIZER DISPLAY ON THE LOCAL DISPLAY UNIT

1. Record the FIT-2 totalizer reading from the LOU (D PISTotal 3 RT-3-P).
2. Reset the FIT-2 totalizer display on the LDU.
a. Press Sel key on LDU keypad repeatedly until COMMAND screen is displayed.
b. Press up or down key on LOU keypad repeatedly until R/FIT-2 is hi lighted.
c. Press Sel key on LOU keypad repeatedly until field to right of the command changes to "1".
d. Press up or down key on LOU keypad repeatedly until cursor is at first (next) digit in 4-digit password field. Password is 0000 (four zeroes).
e. Press Sel key on LOU keypad repeatedly until digit changes to first digit of the password.
f. Repeat steps d and e until all four digits of password entered.
g. Press up or down arrow repeatedly until Confirm is hi lighted.
h. Press Sel key on LOU keypad to confirm the command.

NUMBER ATTACHMENT TITLE REVISION EPIP-4.24 HIGH-RANGE SAMPLING USING MGPI 11 ATTACHMENT PAGE 4 5 of 5 NOTE: For PIS#1 to be in service, V-11 and V-12 are open, and V-13 and V-14 are closed. For PIS#2 to be service V-13 and V-14 are open, and V-11 and V-12 are closed.

IV. REMOVE SAMPLE AND DELIVER TO COUNT ROOM

1. Verify which PIS to be changed.
2. Prepare a new P/I holder to replace the one to be removed.
3. Change out PIS#1 (PIS#2) by opening V-13 (V-11) and V-14 (V-12).
4. Close V-11 (V-13) and V-12 (V-14).
5. Use grip tong to open PIS door and grab P/I holder.
6. Place P/I holder inside shielded cart and close cart door.
7. Insert new holder into PIS and close PIS door.
8. Deliver sample to Count Room.

NOTE: Part V, Install New Particulate/Iodine Holder, below is applicable when there is no P/I sampler installed.

V. INSTALL NEW PARTICULATE/IODINE HOLDER

_ 1. Verify which PIS to be loaded.

___ 2. Prepare a new P/I holder.

3. Line up PIS#1 (PIS#2) by opening V-13 (V-11) and V-14 (V-12).
4. Close V-11 (V-13) and V-12 (V-14).

_ 5. Open the PIS door.

6. Insert the new holder into the PIS and close the door.