Revisions to Emergency Plan and Implementing Procedures
ML031410488
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/14/2003
From: Heacock D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
03-351
Download: ML031410488 (18)


Text

{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIROINIA 23261 May 14, 2003 U.S. Nuclear Regulatory Commission Serial No. 03-351 Attention: Document Control Desk NAPS/MPW Washington, D.C. 20555 Docket Nos. 50-338/339 License Nos. NPF-4/7 Gentlemen: VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS I AND 2 REVISIONS TO EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), enclosed is a recent revision to a North Anna Power Station Emergency Plan Implementing Procedure. This revision does not implement actions that decrease the effectiveness of our Emergency Plan. The Emergency Plan and Implementing Procedures continue to meet the standards of 10 CFR 50.47(b). Please update your manual by performing the actions described in Attachment 1, Tabulation of Changes. Very truly yours, (DJA. Heacock

~-.-ite Vice President Commitments Stated or Implied: None.

Enclosures cc: U.S. Nuclear Regulatory Commission (2 copies) Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station wor\5

ATTACHMENT I TABULATION OF CHANGES VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TO NORTH ANNA POWER STATION EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Enclosed is a recent revision to a North Anna Power Station Emergency Plan Implementing Procedure (EPIP). Please take the following actions in order to keep your manual updated. REMOVE AND DESTROY DATED INSERT EFFECTIVE EPIP-4.02, 12/0/02 Rev. EPDATE13_ _ EPIP -4.02, Rev. 13 1108/02 EPIP -4.02, Rev. 14 105/12/03 Emergency Plan Privacy and Proprietary Material has been removed. Reference Generic Letter No. 81-27.

DATE: 2003-05-12 PAGE: 1 -a.. s NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES _ CHECK DMIS FOR LATEST DOCUMENT INFORMATION

  • K APPROVAL EFFECT**

DOCUMENT NUMBER REV **DATEm *NDATE*(K DOCUMENT TITLE EPIP-4.02 014 05/12/03 05/12/03 RADIATION PROTECTION SUPERVISOR CONTROLLING PROCEDURE EPIP-1.01 037 12/13/02 12/18/02 EMERGENCY MANAGER CONTROLLING PROCEDURE EPIP-1.02 011 09/07/99 10/01/99 RESPONSE TO NOTIFICATION OF UNUSUAL EVENT EPIP-1.03 014 09/07/99 10/01/99 RESPONSE TO ALERT EPIP-1.04 014 09/07/99 10/01/99 RESPONSE TO SITE AREA EMERGENCY EPIP-1.05 016 09/07/99 10/01/99 RESPONSE TO GENERAL EMERGENCY EPIP-1.06 004 09/05/01 09/05/01 PROTECTIVE ACTION RECOMMENDATIONS EPIP-2.01 025 08/13/02 08/28/02 NOTIFICATION OF STATE AND LOCAL GOVERNMENTS EPIP-2.02 015 08/13/02 08/28/02 NOTIFICATION OF NRC EPIP-3.02 021 03/04/03 03/17/03 ACTIVATION OF TECHNICAL SUPPORT CENTER EPIP-3.03 013 03/04/03 03/17/03 ACTIVATION OF OPERATIONAL SUPPORT CENTER EPIP-3.04 015 07/14/98 07/20/98 ACTIVATION OF LOCAL EMERGENCY OPERATIONS FACILITY EPIP-3.05 002 04/02/03 04/08/03 AUGMENTATION OF EMERGENCY RESPONSE ORGANIZATION EPIP-4.01 019 04/02/03 04/08/03 RADIOLOGICAL ASSESSMENT DIIECTOR CONTROLLING PROCEDURE EPIP-4.03 011 12/20/93 01/01/94 DOSE ASSESSMENT TEAM CONTROLLING PROCEDURE EPIP-4.04 009 11/21/94 11/28/94 EMERGENCY PERSONNEL RADIATION EXPOSURE EPIP-4.05 009 01/28/00 02/04/00 RESPIRATORY PROTECTION AND KI ASSESSMENT EPIP-4.06 009 12/21/95 12/28/95 PERSONNEL MONITORING AND DECONTAMINATION EPIP-4.07 014 09/29/00 10/06/00 PROTECTIVE MEASURES EPIP-4.08 _ 014 05/10/02 06/19/02 INITIAL OFFSITE RELEASE ASSESSMENT EPIP-4.09 013 05/10/02 06/19/02 SOURCE TERM ASSESSMENT EPIP-4.10 011 08/13/02 08/28/02 DETERMINATION OF X/Q EPIP-4.13 009 09/29/00 10/06/00 OFFSITE RELEASE ASSESSMENT WITH ENVIRONMENTAL DATA

DATE: 2003-05-12 PAGE: 2 NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES__ CHECK DMIS FOR LATEST DOCUMENT INFORMATION APPROVAL EFFECTX* DOCUMENT NUMBER REV **DATE** *DATE** DOCUMENT TITLE _ - 4.14 - 07 -------------------------------------------------------- EPIP-4.14 007 12/20/93 01/01/94 INPLANT MONITORING EPIP-4.15 Oil 02/18/00 02/28/00 ONSITE MONITORING EPIP-4.16 015 12/13/02 12/18/02 OFFSITE MONITORING EPIP-4.17 016 12/13/02 12/18/02 MONITORING OF EMERGENCY RESPONSE FACILITIES EPIP-4.18 013 12/13/02 12/18/02 MONITORING OF LEOF EPIP-4.21 008 12/20/93 01/01/94 EVACUATION AND REMOTE ASSEMBLY AREA MONITORING EPIP-4.22 014 04/05/02 04/09/02 POST ACCIDENT SAMPLING OF CONTAINMENT AIR EPIP-4.23 014 04/05/02 04/09/02 POST ACCIDENT SAMPLING OF REACTOR COOLANT EPIP-4.24 013 04/02/03 04/08/03 GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY EPIP-4.25 008 07/23/93 07/23/93 LIQUID EFFLUENT SAMPLING DURING AN EMERGENCY EPIP-4.26 011 07/26/01 09/13/01 HIGH LEVEL ACTIVITY SAMPLE ANALYSIS EPIP-4.28 007 01/09/97 01/14/97 TSC/LEOF RADIATION MONITORING SYSTEM EPIP-4.30 005 04/05/02 04/09/02 USE OF MIDAS CLASS A MODEL EPIP-4.31 003 06/20/94 06/20/94 USE OF MIDAS CLASS B MODEL EPIP-4.33 003 11/28/00 11/30/00 HEALTH PHYSICS NETWORK COMUNICATIONS EPIP-4.34 003 12/13/02 12/18/02 FIELD TEAM RADIO OPERATOR INSTRUCTIONS EPIP-5.01 011 12/11/96 12/17/96 TRANSPORTATION OF CONTAMINATED INJURED PERSONNEL EPIP-5.03 016 02/18/00 02/28/00 PERSONNEL ACCOUNTABILITY EPIP-5.04 010 03/04/03 03/17/03 ACCESS CONTROL EPIP-5.05 013 06/25/96 07/02/96_ SITE EVACUATION EPIP-5.07 011 07/25/00 08/02/00 ADMINISTRATION OF RADIOPROTECTIVE DRUGS EPIP-5.08 008 04/02/03 04/08/03 DAMAGE CONTROL GUIDELINE EPIP-5.09 004 08/02/02 08/15/02 SECURITY TEAM LEADER CONTROLLING PROCEDURE

DATE: 2003-05-12 PAGE: 3 NORTH ANNA POWER STATION LIST OF NAPS EMERGENCY PLAN IMPLEMENTATION PROCEDURES _ CHECK DMIS FOR LATEST DOCUMENT INFORMATION APPROVAL EFFECT* DOCUMENT NUMBER REV **DATE** **DATE** DOCUMENT TITLE _-________.______1__ R-E------RY-----RECOVERY-------------GU-----DEL------NE-EPIP-6.01 007 05/12/99 05/17/99 RE-ENTRY/RECOVERY GUIDELINE

                                    ;YIRGIIJJA POWER -

NORTH ANNA' POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING 14 PROCEDURE 14 (With No Attachments) PAGE 1 of 13 PURPOSE To assist Radiological Assessment Director in establishing the radiation

                      \This protection program during an emergency.

ocument ShoudouVrife And Annotated To AWotole orce As RequiredtoefOlIW r ENTRY CONDITIONS Any one of the following:

1. ALERT or higher emergency classification has been declared.
2. Activation by EPIP-4.01, RADIOLOGICAL ASSESSMENT DIRECTOR CONTROLLING PROCEDURE.
3. As deemed necessary by the Radiological Assessment Director.

Approvals on File Effective Date

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING " 14 EP4.2 PROCEDURE 14 PAGE 2 of 13 -ED4 ACTION/EXPECTED RESPONSE H-] RESPONSE NOT OBTAINED 1-NOTE: A sequence of events (e.g., data transmission, team dispatch) should be recorded as accurately as time allows. Event times and your initials should be included. __ __ __ 1 INITIATE PROCEDURE:

  • By:

Date: Time: _____2 ESTABLISH RADIATION PROTECTION SUPERVISOR OFFICE: a) Evaluate HP area radiation levels:

1) Do surveys and sampling
2) Use frisker, personnel contamination monitors and Count Room analysis equipment to check for abnormal indications b) Verify HP area - HABITABLE: b) IF HP area NOT habitable, THEN do the following:
1) Establish RPS office in a habitable area (e.g., OSC.

Emergency Switchgear Room).

2) Notify Exposure Control of new work area.
3) GO TO Step 2.d.

c) Establish RPS Office in HP Shift Supervisor area d) Establish continuous monitoring (e.g.. ratemeter, DAD)

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING- 14 PROCEDURE PAGE 3 of 13 HED ACTION/EXPECTED RESPONSE [-I RESPONSE NOT OBTAINED H- _____3 ESTABLISH COMMUNICATIONS WITH TSC: a) Establish telephonic communication (e.g., RAD, Dose Assessment) b) Establish radio communications:

1) Set radio call group to "EPA'
2) Verify capability to contact 2) Notify RAD of radio TSC using radio inoperability.

NOTE: The Emergency Plan has an augmentation goal of 14 HP personnel for Alert or higher classification. _____4 NOTIFY RAD OF NUMBER OF HP PERSONNEL AVAILABLE _____5 ASK RAD FOR BRIEFING:

  • Emergency Classification
  • Plant Status
            . Assistance required

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING- -14 PROCEDURE l PAGE .~ ~ 4 of 13 -EH: ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED F- _____6 ESTABLISH EXPOSURE CONTROL: a) Ensure an individual is available to staff the Exposure Control station b) Verify Exposure Control area - b) Evaluate relocation to OSC. HABITABLE c) Have Exposure Control do the following:

1) Ensure a supply of TLDs is available for issue
2) Maintain exposure records
3) Assign dosimetry in accordance with normal HP procedures

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING

                                             ~~~~PROCEDURE                                 14 1

PAGE I 5 of 13 I- -- E ACTION/EXPECTED RESPONSE H-H RESPONSE NOT OBTAINED NOTE: The following step lists response actions coordinated by the RPS. These actions are not listed in order of priority.

  • A minimum of 2 (two) Offsite Monitoring Teams must be dispatched (i.e.. sent into the field) upon a Site Area Emergency or higher emergency class.

_____7 REVIEW HP RESPONSE ACTIONS AND INITIATE RESPONSES ON A PRIORITY BASIS: IF HP response action(s) needed, THEN do the following: Inplant Monitoring GO TO Step 8. Onsite Monitoring GO TO Step 9. Offsite Monitoring GO TO Step 10. Control Room/TSC/OSC/LEOF Monitoring GO TO Step 11. Personnel injury/contamination GO TO Step 12. Evacuation Monitoring GO TO Step 13. Post Accident Sample Monitoring GO TO Step 14. Initiate EPIP-4.24, GASEOUS Gaseous effluent sampling EFFLUENT SAMPLING DURING AN EMERGENCY. Access Control Limits - EXCEEDED: Establish access control(s):

           . Airborne contamination exceeds 0.30 DAC         . HP notification prior to entry.
  • Contamination 1000 dpm per 100 cm2
  • Use of RWPs.
  • Survey indicates 1000 mR/hr
  • Roping/posting affected areas.

Sample analysis results - AVAILABLE Give results to RAD. HP area habitability problem - IDENTIFIED RETURN TO Step 2. Relief shift or additional staff - NEEDED GO TO Step 15. Turnover duties to relief GO TO Step 16. Emergency - TERMINATED GO TO Step 17.

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING

                                       ~~~~PROCEDURE                                14 1

PAGE 6 of 13 ACTION/EXPECTED RESPONSE HRESPONSE NOT OBTAINED 8 INITIATE INPLANT MONITORING: a) Ask RAD for the following:

  • Required monitoring locations (consider ERFs. Security and Chemistry)
  • Type of surveys required b) Evaluate possible radiological hazards in survey area(s) c) Assign Inplant Monitoring Team Leader and Member (only one must be an HP Technician) d) Initiate EPIP-4.14, INPLANT MONITORING e) Notify Inplant Monitoring Team Leader of the location and surveys required f) Ensure protective gear and monitoring equipment is provided, as necessary:
             . Respirators
             . Protective Clothing
  • Dosimetry
             . Monitoring Equipment
             . Air Sampling Equipment g) Identify routes of entry that may reduce exposure h) Assign portable radios and Radio Call Group (Radio use restricted in Radio Frequency Interference (RFI) areas.

Gai-Tronics may also be used.) i) Send out team(s) j) Notify RAD of survey information, when received k) RETURN TO Step 7

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING- - -1 EPIP-4.02 PROCEDURE 14 PAGE 7 of 13 Ij~ ACTION/EXPECTED RESPONSE HRESPONSE NOT OBTAINED NOTE: Onsite monitoring teams should be dispatched upon an Alert classification. or as specified by Radiological Assessment Director. _____9 INITIATE ONSITE MONITORING: a) Ask RAD for the following:

                 . Monitor location
                 . Surveys required
  • Radiological Hazards b) Coordinate transportation (if required):
                 . Health Physics truck
  • Site Vice President's Vehicle
  • Station Manager's Vehicle c) Assign On-site Monitoring Team Leader and Member (only one must be an HP Technician) d) Initiate EPIP-4.15, ONSITE MONITORING e) Notify Onsite Team leader of location and surveys required f) Ensure protective gear and monitoring equipment is provided, as necessary:
  • Respirators
                 . Protective Clothing
                 . Dosimetry
                 . Monitoring Equipment
                 . Air Sampling Equipment g) Assign Radio Call Group h) Send out monitoring team(s) i) Establish radio contact with monitoring team(s) j)  Notify RAD of survey information, when received k) RETURN TO Step 7

NUMBJER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING- -- 14 EP-4.02 PROCEDURE 14 PAGE 8 of 13 STEP ACTION/EXPECTED RESPONSE HRESPONSE NOT OBTAINED NOTE: Two Offsite Monitoring Kits, one Onsite Monitoring Kit and one Remote Assembly Area Monitoring Kit are located in the Exposure Control Facility. __10 INITIATE OFFSITE MONITORING: a) Ask RAD for the following:

1) Offsite monitoring locations
2) Number of offsite teams
3) Assessment of offsite radiological hazards
4) Assessment of need to issue radioprotective drugs to monitoring teams b) Assign Offsite Monitoring Team Leader and Member (only 1 need be an HP Technician) c) Initiate EPIP-4.16, OFFSITE MONITORING d) Assist in obtaining vehicle:
  • Health Physics truck
  • Site Vice President's Vehicle
                . Station Manager's Vehicle e) Assign emergency kit/equipment:
  • Battery powered air sampler
  • RM-14 with H.P. 210 probe
                . Record number of Emergency Kits issued f) Give team briefing (include initial reporting location) g) Review protective gear required:
  • Respirator and/or radioprotective drugs
  • Protective clothing
                . Dosimetry h) Assign Radio Call Group i) Send out Monitoring Team(s) j) RETURN TO Step 7

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING 14 EP4.2 PROCEDURE PAGE 9 of 13 L F- -EEH F-] ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED I NOTE: Monitoring of emergency response facilities ERFs) should begin within 60 minutes following an ALERT classification. _____11 INITIATE CONTROL ROOM/TSC/OSC/LEOF MONITORING: a) Evaluate the following when determining monitoring frequency:

  • Spread of contamination from service buildings
                   . Status of effluent release
                   . Increase in emergency classification
                   . Change in plume direction b) Assign the following EPIP(s):
  • EPIP-4.17, MONITORING OF EMERGENCY RESPONSE FACILITIES
  • EPIP-4.18, MONITORING OF LEOF
  • EPIP-4.28. TSC/LEOF RADIATION MONITORING SYSTEM c) Notify RAD about ERF habitability and survey results d) RETURN TO Step 7

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING- 14 EP4.2 PROCEDURE PAGE 10 of 13 rLIE ACTION/EXPECTED RESPONSE H-H RESPONSE NOT OBTAINED H- _____12 CHECK PERSONNEL - CONTAMINATED: RETURN TO Step 7. a) Check personnel - INJURED a) GO TO Step 12.c. b) Initiate normal station HP procedure for responding to contaminated injured personnel c) Assign EPIP-4.06, PERSONNEL MONITORING AND DECONTAMINATION d) Update RAD on status e) RETURN TO Step 7 NOTE: EPIP-4.21, EVACUATION AND REMOTE ASSEMBLY AREA MONITORING, contains instructions for surveying parking areas to determine contamination levels prior to evacuation if a radiological release occurred and time is available. _____13 INITIATE EVACUATION MONITORING: a) Initiate EPIP-4.21, EVACUATION AND REMOTE ASSEMBLY AREA MONITORING b) Notify RAD when team is dispatched c) RETURN TO Step 7

NUMBER PROCEDURE TITLE REVISION RADIATION PROTECTION SUPERVISOR CONTROLLING---- 14 EPIP-4.02 PROCEDURE PAGE 11 of 13 L -{FA ACTION/EXPECTED RESPONSE [-1 RESPONSE NOT OBTAINED H- _____14 INITIATE POST ACCIDENT SAMPLING: a) Verify post accident containment and/or reactor coolant sample - REQUIRED (verify with RAD) b) Assign in-plant survey to determine dose rate at sample station c) Notify RAD of survey results d) Initiate RWP (if required) e) Initiate the following (as necessary):

                . EPIP-4.22, POST ACCIDENT SAMPLING OF CONTAINMENT AIR
                . EPIP-4.23, POST ACCIDENT SAMPLING OF REACTOR COOLANT
                . EPIP-4.24, GASEOUS EFFLUENT SAMPLING DURING AN EMERGENCY
  • EPIP-4.25, LIQUID EFFLUENT SAMPLING DURING AN EMERGENCY f) Ensure HP coverage available during sampling and sample preparation g) RETURN TO Step 7

NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING---- 14 EP-4.02 PROCEDURE 14 PAGE 12 of 13 -LFJ-t r ACTION/EXPECTED RESPONSE F-] RESPONSE NOT OBTAINED H- _____15 EVALUATE NEED FOR ADDITIONAL PERSONNEL: a) Ask RAD about projected duration of emergency b) Check relief shift and/or b) RETURN TO Step 7. additional personnel - NEEDED c) Prepare relief schedule and/or increased staffing schedule d) Give schedule to RAD for approval e) Initiate callout of scheduled personnel (if needed) f) Notify RAD when callout complete g) RETURN TO Step 7 _____16 CHECK TURNOVER - REQUIRED (due to arrival of a more senior HP representative or relief): a) Provide successor briefing on plant conditions and HP actions underway b) Notify RAD of position change c) Stay with relief for approximately 30 minutes d) RETURN TO Step 7

L -  ;, , I NUMBER PROCEDURE TITLE REVISION EPIP-4.02 RADIATION PROTECTION SUPERVISOR CONTROLLING- -- 14 EP-4.02 PROCEDURE PAGE 13 of 13 .II ACTION/EXPECTED RESPONSE l l RESPONSE NOT OBTAINED _____17 TERMINATE EMERGENCY RESPONSE: a) Notify HP staff when emergency is terminated b) Review recovery actions with RAD c) Maintain access control as required d) Initiate replacement of procedures and equipment used during the emergency _____18 TERMINATE EPIP-4.02: a) Give completed EPIP-4.02. all other applicable EPIPs, forms and records to the Radiological Assessment Director b) Completed By: Date: Time:

                                                 -END    -}}