Issue date | Title | Topic | |
---|---|---|---|
L-21-213, Emergency Plan Revision 59 | 20 August 2021 | Emergency Plan Revision 59 | Safe Shutdown Fitness for Duty Health Physics Network Offsite Dose Calculation Manual Hydrostatic Operating Basis Earthquake Emergency Lighting Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fuel cladding Fire Protection Program Siren Overexposure |
ML18043A119 | 19 January 2018 | Transmittal Report - Protective Action Recommendation Reference Material | |
L-17-285, Summary of Changes to Data Point Library | 23 August 2017 | Summary of Changes to Data Point Library | |
L-17-068, Submittal of Revision 50 to Emergency Plan, Summary of Changes | 3 March 2017 | Submittal of Revision 50 to Emergency Plan, Summary of Changes | Incorporated by reference Severe Accident Management Guideline |
L-17-020, Submittal of Changes for Rev. 49 to Emergency Plan | 23 January 2017 | Submittal of Changes for Rev. 49 to Emergency Plan | |
ML17347A118 | 16 December 2016 | Revision 31 to Emergency Plan, Effective December 21, 2016 | Safe Shutdown Health Physics Network High winds High Radiation Area Grab sample Offsite Dose Calculation Manual Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Fire Protection Program |
ML16243A032 | 23 August 2016 | Field Monitoring Teams Radiation Monitoring Teams Field Surveys | Health Physics Network |
ML16189A075 | 28 June 2016 | Revision 14 to Emergency Plan Implementing Procedure RA-EP-02110 (Emergency Notification) | Safe Shutdown Fitness for Duty |
ML16131A668 | 30 April 2016 | Revision 01 to RA-EP-02865, Emergency Plan Off Normal Occurrence Procedure | |
ML16131A670 | 30 April 2016 | Revision 04 to Procedureinternal Flooding, RA-EP-2880 | Safe Shutdown Boric Acid Internal Flooding FLEX |
ML16110A317 | 14 April 2016 | Revision 10 to Emergency Plan Off Normal Occurrence Procedure, RA-EP-02850, Hazardous Chemical and Oil Spills. | |
ML16082A333 | 16 March 2016 | Emergency Plan Off Normal Occurrence Procedure - RA-EP-02830 - Flooding | Ultimate heat sink |
ML16081A179 | 14 March 2016 | Emergency Plan Implementing Procedure RA-EP-02010, Revision 18 | Safe Shutdown Fitness for Duty Ultimate heat sink FLEX B.5.b Mitigating Strategies |
ML16048A253 | 5 February 2016 | Revision 06 to RA-EP-02870, Emergency Plan Off Normal Occurrence Procedure | Fitness for Duty |
ML15364A019 | 22 December 2015 | Revision 13 to RA-EP-02110, Emergency Notification and Revision 13 to RA-EP-02220, Emergency Operations Facility Activation and Response | Safe Shutdown Fitness for Duty |
L-12-457, Emergency Plan and Implementing Procedures | 22 January 2013 | Emergency Plan and Implementing Procedures | Safe Shutdown Shutdown Margin High Radiation Area Severe Accident Management Guideline Fuel cladding Fire Protection Program |
L-12-373, Submittal of Emergency Plan Changes, Revision 37 | 24 October 2012 | Submittal of Emergency Plan Changes, Revision 37 | Safe Shutdown Fitness for Duty Health Physics Network High winds Offsite Dose Calculation Manual Hydrostatic Met Tower Emergency Lighting Earthquake Deep Dose Equivalent Fuel cladding Fire Protection Program Power change Unidentified leakage Siren Overexposure |
L-12-142, Supplemental Information to a Request for Licensing Action on a Proposed Emergency Preparedness Plan Revision | 29 June 2012 | Supplemental Information to a Request for Licensing Action on a Proposed Emergency Preparedness Plan Revision | Safe Shutdown Health Physics Network High winds Internal Flooding Earthquake Fuel cladding Pressure Boundary Leakage |
L-11-320, Request NRC Approval of Proposed Emergency Preparedness Plan Using Nuclear Energy Institute 99-01 Revision 5 Methodology | 21 December 2011 | Request NRC Approval of Proposed Emergency Preparedness Plan Using Nuclear Energy Institute 99-01 Revision 5 Methodology | Safe Shutdown Health Physics Network High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Power Uprate Failure to Scram |
ML110420145 | 4 February 2011 | Final Report for September 28, 2010, Radiological Emergency Preparedness Partial Participation Plume Exposure Pathway Exercise | Fire Watch |
ML053110427 | 8 December 2004 | Enclosure B, Section 6.0, Emergency Measures, of the Perry Emergency Plan, Page 6-3 of the Perry Evacuation Time Estimate Study Perry Operations Manual Emergency Plan Implementing Instruction, Protective Actions & Guides, Dated December 8, | Deep Dose Equivalent |
ML041140341 | 21 April 2004 | Emergency Implementing Procedure Changes | |
ML041060404 | 8 April 2004 | Transmittal of Davis-Besse Emergency Plan Implementing Procedure RA-EP-01900, General Emergency, Revision 03 | |
ML041070432 | 7 April 2004 | Emergency Plan Implementing Instruction, Revision 9 | Safe Shutdown Time of Discovery High winds Earthquake Fuel cladding Fire Protection Program Power change |
ML040980510 | 30 March 2004 | Submittal of Emergency Plan Implementing Instructions | Safe Shutdown Time of Discovery High winds Earthquake Fuel cladding Minimum staff Fire Protection Program Power change |
L-04-047, Emergency Preparedness Plan Implementing Procedures Revisions | 26 March 2004 | Emergency Preparedness Plan Implementing Procedures Revisions | Offsite Dose Calculation Manual |
ML040900432 | 22 March 2004 | Davis- Besse - Revision 4 to RA-EP-02620, Emergency Dose Control and Potassium Iodide Distribution. | |
ML040650641 | 27 February 2004 | Revision 4 to RA-EP-01500, Emergency Classification. | Safe Shutdown Offsite Dose Calculation Manual Earthquake |
ML040650646 | 25 February 2004 | Revision 5 to RA-EP-02010, Emergency Management and Revision 3 to RA-EP-02220, Emergency Operations Facility Activation and Response | Safe Shutdown Fitness for Duty |
ML053260464 | 23 February 2004 | Enclosure a, Davis-Besse Nuclear Power Station (DBNPS) Emergency Plan, Dated February 23, 2004, DBNPS Emergency Plan Implementing Procedure RA-EP-02245, Effective June 8, 2005 & DBNPS Emergency Plan Offnormal Occurrence Procedure RA-EP-0287 | Safe Shutdown Fitness for Duty Health Physics Network High winds High Radiation Area Grab sample Offsite Dose Calculation Manual Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Operating Basis Earthquake Earthquake Fire Protection Program |
ML040420378 | 2 February 2004 | Emergency Plan Implementing Procedure Revision 01 for RA-EP-02240, Offsite Dose Assessment. | Met Tower Power change |
ML040550540 | 30 January 2004 | Revision 12 to EPI-A6, Technical Support Center Activation and Revision 10 to EPI-A8, Emergency Operations Facility Activation. | Fitness for Duty Health Physics Network Grab sample |
ML040420376 | 30 January 2004 | Submittal of Emergency Plan Implementing Instructions | Fitness for Duty Health Physics Network Grab sample |
ML040290651 | 21 January 2004 | Emergency Plan Offnormal Occurrence Procedure RA-EP-02800, Rev 02, Preparation and Transport of Contaminated Injured Personnel. | |
ML033630593 | 17 December 2003 | Revision 02 to Procedure RA-EP-02260, Radiological Controls in the Dbab. | |
L-03-199, Emergency Preparedness Plan and Implementing Procedures | 2 December 2003 | Emergency Preparedness Plan and Implementing Procedures | Safe Shutdown |
ML033430352 | 2 December 2003 | Emergency Plan Implementing Procedure RA-EP-02270, Facilities Support, Revision 02 | Fitness for Duty Internal Flooding Earthquake |
ML033360592 | 25 November 2003 | Rev. 2 to RA-EP-02710, Reentry | |
ML033290461 | 13 November 2003 | Transmittal of Emergency Plan Off Normal Occurrence Procedure RA-EP-02820 | Safe Shutdown Boric Acid Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML033240361 | 11 November 2003 | Submittal of Emergency Plan Implementing Instructions | Deep Dose Equivalent |
ML033240600 | 10 November 2003 | Submittal of Emergency Plan Implementing Instructions | Safe Shutdown Time of Discovery High winds Earthquake Power change |
ML033170141 | 31 October 2003 | Revision 4 to EPI-B9, Emergency Records. | |
L-03-177, Emergency Preparedness Plan Implementing Procedures | 28 October 2003 | Emergency Preparedness Plan Implementing Procedures | |
ML032521471 | 2 September 2003 | Revision 03 to Emergency Plan Implementing Procedure RA-EP-02250, Radiation Monitoring Team Surveys | |
L-03-126, Emergency Preparedness Plan & Implementing Procedures | 22 August 2003 | Emergency Preparedness Plan & Implementing Procedures | Fitness for Duty |
ML032340615 | 13 August 2003 | Transmittal of Emergency Plan Implementing Procedure RA-EP-02410, Revision 5 | Minimum staff |
ML032250034 | 5 August 2003 | Submittal of Emergency Plan Implementing Instructions EPI-B13, Revision 3 | Grab sample Fuel cladding |
ML032200318 | 1 August 2003 | Revised Emergency Plan Implementing Procedures | Fitness for Duty |
L-03-111, Emergency Preparedness Plan Implementing Procedures | 22 July 2003 | Emergency Preparedness Plan Implementing Procedures | Boric Acid Fitness for Duty Offsite Dose Calculation Manual Deep Dose Equivalent |
ML032120652 | 19 July 2003 | Emergency Plan Implementing Procedure |