Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17026A41420 January 2017C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling
ML16196A0659 July 2016Part 21 Report - Nonconformance on Struthers-Dunn Relay for Psge Nuclear LLCExclusive Use
ML16162A6798 June 2016Part 21 Report - Nonconformance on Struthers-Dunn Relay for PSEG Nuclear LLC
ML16139A83113 May 2016Part 21 Notification - Potential Defect Applicable to Hytork XL1126 Pneumatic ActuatorsExclusive Use
ML16126A11129 April 2016National Technical Systems (Nts) Request for Extension, for Potential Part 21 on Safety Clip, Siemens Part Number 401-158Commercial Grade
ML16098A44522 March 2016Part 21 Notification - Sense and Transfer Module Resistive Short
ML16112A21014 March 2016National Technical Systems - Potential Part 21 on Siemens 401-158 Safety Clip, Per Wolf Creek, Salem, and Arkansas Nuclear OneCommercial Grade
ML15146A0227 May 2015Qualtech Np - Potential 1O CFR Part 21 Notification on Struthers Dunn Relays
ML15134A0187 May 2015Part 21 Report Regarding Struthers Dunn Relays with Contact Resistance Greater than One Ohm
ML15089A43527 March 2015Part-21 Notification - Sense and Transfer Module Resistive Short
ML15049A4586 February 2015Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification NoncomplianceShutdown Margin
ML15022A65020 January 2015Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification
ML14274A05222 September 2014Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities
ML14197A28115 July 2014Part 21 Report - Potential Failure of Reactor Coolant Pump Turning Vane BoltsStress corrosion cracking
ML14197A27414 July 2014Notification of the Potential Existence of Defects Pursuant to 10CFR Part 21Stress corrosion cracking
ML14113A37018 April 2014Part 21 - Thomas and Betts Printed Circuit BoardsCommercial Grade Dedication
ML14113A39817 April 2014Part 21 - Bearing DefectOverspeed
ML14303A52628 March 2014Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries
ML14085A01319 March 2014Part 21 Report Re Defects & Non-Compliance of Thomas and Betts Printed Circuit Boards in Which the Power Supplies Incorrect Strap Installed on the Trasformers of Cyberex P/N
ML14079A35317 March 2014Notification of Part 21 Re Bearing Defect
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12363A04710 December 2012Part 21 Report Re Failure to Comply with Certain PSEG Specifications as Required by PSEG Purchase Order
ML12318A0418 November 2012Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly ValvesCommercial Grade Dedication
Condition Adverse to Quality
ML12094A3712 April 2012Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations
ML12097A3162 March 2012Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition
ML12066A1182 March 2012Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations
ML12003A22422 December 2011Baldor Electric Co. Notification of Nuclear Nonconformance Event No. 47425
ML11318A02310 November 2011Notification of Part 21 Report Re Motor Power Leads Undersized
ML11228A0861 August 2011Submittal of 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0102, Rev. 0, Air Start Motors with Friction-Clutch Inertia Drives
ML11136A21712 May 2011U-Rings Fabricated with Incorrect Material
ML10277010529 September 201010 CFR Part 21 Report of Potential Issues with Certain Regulator Model 77N-40
ML10277041729 September 2010Dresser Masoneilan, 10 CFR Part 21 Report of Potential Issues with Certain Regulator Model 77N-40
ML10110022514 April 2010United Controls International, Faulty Modulation Index Control Circuit Board Used in a Power Supply
ML09303045423 October 2009Hilti, Inc., Potential Delivery of Nonconforming Washers, and Affected Utilities or Plants Are Pilgrim, Brunswick, Arizona Public Service, and Waterford 3
ML09076118811 March 2009Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs
ML0904007485 February 2009Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28Commercial Grade
ML07331038121 November 2007Notification of Potential Part 21 Report Welding of Safety Related Components
ML07275047021 September 2007MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21Commercial Grade Dedication
ML0713703097 March 2007Velan, Inc., Piston Check Cv Information
ML07064025327 February 2007Notification of Potential Part 21 Re Chiller Copper Sleeve Cracks Leading to Slow Refrigerant Discharge
ML06277022427 September 2006Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves
ML06262049415 September 2006Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed
LR-N04-0475, 10CFR21 Final Report Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms - Salem, Units 1 and 21 November 200410CFR21 Final Report Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms - Salem, Units 1 and 2
LR-N04-0376, 10CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station20 August 200410CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station
LR-N04-0377, 10CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms20 August 200410CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms