Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16196A065 | 9 July 2016 | Part 21 Report - Nonconformance on Struthers-Dunn Relay for Psge Nuclear LLC | Exclusive Use |
ML16162A679 | 8 June 2016 | Part 21 Report - Nonconformance on Struthers-Dunn Relay for PSEG Nuclear LLC | |
ML16139A831 | 13 May 2016 | Part 21 Notification - Potential Defect Applicable to Hytork XL1126 Pneumatic Actuators | Exclusive Use |
ML16126A111 | 29 April 2016 | National Technical Systems (Nts) Request for Extension, for Potential Part 21 on Safety Clip, Siemens Part Number 401-158 | Commercial Grade |
ML16098A445 | 22 March 2016 | Part 21 Notification - Sense and Transfer Module Resistive Short | |
ML16112A210 | 14 March 2016 | National Technical Systems - Potential Part 21 on Siemens 401-158 Safety Clip, Per Wolf Creek, Salem, and Arkansas Nuclear One | Commercial Grade |
ML15146A022 | 7 May 2015 | Qualtech Np - Potential 1O CFR Part 21 Notification on Struthers Dunn Relays | |
ML15134A018 | 7 May 2015 | Part 21 Report Regarding Struthers Dunn Relays with Contact Resistance Greater than One Ohm | |
ML15089A435 | 27 March 2015 | Part-21 Notification - Sense and Transfer Module Resistive Short | |
ML15049A458 | 6 February 2015 | Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance | Shutdown Margin |
ML15022A650 | 20 January 2015 | Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification | |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML14197A281 | 15 July 2014 | Part 21 Report - Potential Failure of Reactor Coolant Pump Turning Vane Bolts | Stress corrosion cracking |
ML14197A274 | 14 July 2014 | Notification of the Potential Existence of Defects Pursuant to 10CFR Part 21 | Stress corrosion cracking |
ML14113A370 | 18 April 2014 | Part 21 - Thomas and Betts Printed Circuit Boards | Commercial Grade Dedication |
ML14113A398 | 17 April 2014 | Part 21 - Bearing Defect | Overspeed |
ML14303A526 | 28 March 2014 | Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries | |
ML14085A013 | 19 March 2014 | Part 21 Report Re Defects & Non-Compliance of Thomas and Betts Printed Circuit Boards in Which the Power Supplies Incorrect Strap Installed on the Trasformers of Cyberex P/N | |
ML14079A353 | 17 March 2014 | Notification of Part 21 Re Bearing Defect | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12363A047 | 10 December 2012 | Part 21 Report Re Failure to Comply with Certain PSEG Specifications as Required by PSEG Purchase Order | |
ML12318A041 | 8 November 2012 | Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves | Commercial Grade Dedication Condition Adverse to Quality |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12003A224 | 22 December 2011 | Baldor Electric Co. Notification of Nuclear Nonconformance Event No. 47425 | |
ML11318A023 | 10 November 2011 | Notification of Part 21 Report Re Motor Power Leads Undersized | |
ML11228A086 | 1 August 2011 | Submittal of 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0102, Rev. 0, Air Start Motors with Friction-Clutch Inertia Drives | |
ML11136A217 | 12 May 2011 | U-Rings Fabricated with Incorrect Material | |
ML102770105 | 29 September 2010 | 10 CFR Part 21 Report of Potential Issues with Certain Regulator Model 77N-40 | |
ML102770417 | 29 September 2010 | Dresser Masoneilan, 10 CFR Part 21 Report of Potential Issues with Certain Regulator Model 77N-40 | |
ML101100225 | 14 April 2010 | United Controls International, Faulty Modulation Index Control Circuit Board Used in a Power Supply | |
ML093030454 | 23 October 2009 | Hilti, Inc., Potential Delivery of Nonconforming Washers, and Affected Utilities or Plants Are Pilgrim, Brunswick, Arizona Public Service, and Waterford 3 | |
ML090761188 | 11 March 2009 | Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs | |
ML090400748 | 5 February 2009 | Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 | |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | Commercial Grade |
ML073310381 | 21 November 2007 | Notification of Potential Part 21 Report Welding of Safety Related Components | |
ML072750470 | 21 September 2007 | MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 | Commercial Grade Dedication |
ML071370309 | 7 March 2007 | Velan, Inc., Piston Check Cv Information | |
ML070640253 | 27 February 2007 | Notification of Potential Part 21 Re Chiller Copper Sleeve Cracks Leading to Slow Refrigerant Discharge | |
ML062770224 | 27 September 2006 | Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves | |
ML062620494 | 15 September 2006 | Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed | |
LR-N04-0475, 10CFR21 Final Report Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms - Salem, Units 1 and 2 | 1 November 2004 | 10CFR21 Final Report Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms - Salem, Units 1 and 2 | |
LR-N04-0376, 10CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station | 20 August 2004 | 10CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station | |
LR-N04-0377, 10CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms | 20 August 2004 | 10CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms |