Part 21 Report - Nonconformance on Struthers-Dunn Relay for PSEG Nuclear LLC
ML16162A679
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 06/08/2016
From: Franchuk T
Curtiss-Wright Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16162A679 (4)


Text

0610812016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 51988 Rep Org: CURTISS WRIGHT Notification Date I Time: 06/08/2016 09:27 (EDT)

Supplier: STRUTHERS-DUNN Event Date I Time: 06/08/2016 (EDT)

Last Modification: 06/08/2016 Region: 3 Docket#:

City: CINCINNATI Agreement State: Yes County: License#:

State: OH NRC Notified by: TIMOTHY FRANCHUK Notifications: BILLY DICKSON R3DO HQ Ops Officer: JEFF HERRERA FRANKARNER R1DO Emergency Class: NON EMERGENCY ANTHONY MASTERS R2DO 10 CFR Section: JOHN KRAMER R4DO 21.21(a)(2) INTERIM EVAL OF DEVIATION PART 21/50.55 REACTORS EMAIL PART-21 REPORT- NONCONFORMANCE ON STRUTHERS-DUNN RELAY FOR PSEG NUCLEAR LLC "This letter serves as an interim report in accordance with 10 CFR 21.21 pertaining to a potential deviation associated with Struthers-Dunn relays P/N B255XCXPFHSC125V supplied to PSEG Nuclear LLC. Based upon information obtained from PSEG, a defect may exist with the reset coil of the Struthers-Dunn relay listed above.

Preliminary observations indicate the reset coil had shorted (opened) during operation, and that no other sub-components of the relay are believed to be associated with this failure. PSEG is aware of Curtiss-Wright's investigation into this failure.

"Evaluation of reportability in accordance with 10 CFR Part 21 is not able to be completed within the 60-day evaluation period due to the need for additional time to collect and evaluate the necessary information. It is currently expected that the evaluation of this defect will be completed by July 22, 2016." '

POC: Timothy Franchuk Director, Quality Assurance 4600 East Tech Drive Cincinnati, Ohio 45245 (513) 528-7900 The licensee indicated that the current list of affected plants are being evaluated.

HOO Hoc From: Hover, Margie <mhover@curtisswright.com>

Sent: Wednesday, June 08, 2016 12:08 PM To: HOO Hoc Cc: Franchuk, Timothy

Subject:

[External_Sender] Interim 10 CFR Part 21 Report Regarding Disposition of a Non Conformance on Struthers-Dunn Relay Attachments: QTNP3548 - U.S. Regulatory-Commission.pdf; Interim 10 CFR Part 21 Report (Struthers-Dunn Relay PN B255XCXPFHSC125V).pdf Good afternoon:

I have attached a scanned copy of the above referenced documentation along with transmittal QTNP3548 being submitted by Timothy Franchuk.

Please confirm receipt by signing, dating and returning the Document Transmittal accompanying the attached documentation to Margie Hover, mhover@curtisswright.com.

Faxed copy receipt was confirmed by NRC via telephone conversation 6-8-2016.

Thanks and have a great day.

Margie Hover Document Control Supervisor Nuclear Division Curtiss-Wright 4600 East Tech Drive, Cincinnati, OH, 45245, UNITED STATES T: 513.201.2101 mhover@curtisswright.com I www.curtisswright.com/NuclearDivision

\

This e-mail and any files transmitted with it are proprietary and intended solely for the use of the individual or entity to whom they are addressed. If you have reason to believe that you have received this e-mail in error, please notify the sender and destroy this e-mail and any attached files. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of the Curtiss-Wright Corporation or any of its subsidiaries. Documents attached hereto may contain technology subject to government export regulations. Recipient is solely responsible for ensuring that any re-export, transfer or disclosure of this information is in accordance with applicable government export regulations. The recipient should check this e-mail and any attachments for the presence of viruses. Curtiss-Wright Corporation and its subsidiaries accept no liability for any damage caused by any virus transmitted by this e-mail.

1

CURTISS-WRIGHT 4600 East Tech Drive Cincinnati, Ohio 45245 (513) 528-7900 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

INTERIM 10 CFR PART 21 REPORT REGARDING DISPOSITION OF A NONCONFORMANCE ON STRUTHERS-DUNN RELAY PART NUMBER B255XCXPFHSC125V FOR PSEG NUCLEAR LLC This letter serves as an interim report in accordance with 10 CFR 21.21 pertaining to a potential deviation associated with Struthers-Dunn relays PIN B255XCXPFHSC125V supplied to PSEG Nuclear LLC. Based upon information obtained from PSEG, a defect may exist with the reset coil of the Struthers-Dunn relay listed above. Preliminary observations indicate the reset coil had shorted (opened) during operation, and that no other sub-components of the relay are believed to be associated with this failure. PSEG is aware of Curtiss-Wright's investigation into this failure.

Evaluation of reportability in accordance with 10 CFR Part 21 is not able to be completed within the 60-day evaluation period due to the need for additional time to collect and evaluate the necessary information. It is currently expected that the evaluation of this defect will be completed by July 22, 2016.

If you have any questions pertaining to this information, please contact Timothy Franchuk, Director of Quality Assurance, at 513-201-2176.

Sincerely.

Timothy Franchuk Director, Quality Assurance Nuclear Division Curtiss-Wright cc: Regional Administrator, USNRC, Region II

CURTISS- DOCUMENT CONTRACT N/A WRIGHT Nuclear Division TRANSMITTAL P.O. NUMBER 4600 East Tech Drive, Cincinnati, OH 45245 QTNP3548 N/A T: 513.528.7900 IF: 513.528.4537 TO: NRC'S DOCUMENT CONTROL DESK ACTION I LEGEND I STATUS U.S. REGULATORY COMMISSION

1. For Approval A. Approved-Released for WASHINGTON, DC 20555-0001 2. Final Documents for Construction ATTN: HOO HOC Record B. Approved as noted-(301) 816-5151 3. For Information Only Resubmit- Construction
4. For Preliminary Use may proceed
5. For Your Use C. Not approved- Resubmit PROJECT: 6. Revised as Requested D.

L NO.

DOCUMENT/ OF NO. 0 DRAWINGS ~REPORTS E G

DRAWING NUMBER REV.

PRINTS/

OF 0 SPECIFICATION 0 PROCEDURE E COPIES SEPIAS D OTHER N D

N/A N/A 1 INTERIM 10 CFR PART 21 REPORT REGARDING 2 DISPOSITION OF A NONCONFORMANCE ON STRUTHERS-DUNN RELAY PART NUMBER B255XCXPFHSC125V FOR PSEG NUCLEAR LLC PLEASE ACKNOWLEDGE RECEIPT BELOW AND REMARKS PLEASE EMAIL MARGIE HOVER CONFIRMATION RETURN A SIGNED COPY OF RECEIPT mhover@curtisswright.com. THANK YOU.

RECEIVED BY DATED BY 911argie Jfover DATE: 6/8/2016 DOCUMENT CONTROL In order to avoid delays in the project PAGE: 1 of 1 these documents must be returned by: