Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22098A117 | 29 March 2022 | Engine Systems, Inc. Report No. 10CFR21-0134, Rev. 0 - 10CFR21 Reporting of Defects and Non-Compliance - (Emo Cylinder Head with Fireface Thickness Below Specification Cylinder Head P/N 40121485) | |
ML21096A114 | 6 April 2021 | Ametek Solidstate Controls - Updated Interim Notifcation | |
ML20049A075 | 11 February 2020 | C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries | |
ML19325C094 | 7 November 2019 | Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch ZJS1518 Final Report Per 10 CFR Part 21 | |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML19263A666 | 9 September 2019 | Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 | |
ML19210D434 | 11 July 2019 | Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 | |
ML19190A043 | 28 June 2019 | Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 | |
ML19008A043 | 4 January 2019 | Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 | |
ML19029A155 | 27 December 2018 | 10 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1 | |
ML18353A428 | 30 November 2018 | Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML14210A010 | 23 July 2014 | Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve | Safe Shutdown Shutdown Margin Scram Discharge Volume |
ML14204A707 | 23 July 2014 | Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV | |
ML14042A200 | 21 January 2014 | Part 21 Report Regarding Non-Conformance of an Electrical Tubular Water Heater | |
ML13246A087 | 23 August 2013 | Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification | |
IR 05000391/2013003 | 21 August 2013 | Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report | Commercial Grade Dedication |
ML13240A006 | 21 August 2013 | Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report | Commercial Grade Dedication |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13094A177 | 18 March 2013 | Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf | |
ML13044A075 | 8 February 2013 | Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology | |
ML12347A308 | 12 December 2012 | Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology | |
ML12326A714 | 21 November 2012 | Fourth Interim Report Pursuant to 10 CFR 21 - Unexpected Degradation of Vital Batteries Lll and Lv | |
ML12319A012 | 27 September 2012 | Error in Main Steam Line High Flow Calculational Methodology | |
ML12206A055 | 24 July 2012 | Second Interim Report Pursuant to 10 CFR 21 - Unexpected Degradation of Vital Batteries III and IV | |
ML12158A447 | 6 June 2012 | Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld | |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML12061A268 | 28 February 2012 | Part 21 Report - Potential Minimum Wall Violation on Seismic Plate Valve Bodies | |
ML112700067 | 26 September 2011 | GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Channel-control blade interference |
ML11220A349 | 5 August 2011 | Notification of Potential Part 21 Potential Defect in Qualtech Np Safety Related Motor Control Center Buckets | |
ML11115A039 | 14 April 2011 | Notice of Deviation Pursuant to 10 CFR 21, NPKC-7-21A(N) Splice Kit with Possible Compromised Jacket Seal | |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML090761188 | 11 March 2009 | Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs | |
ML062370095 | 21 August 2006 | Update to Part 21 Interim Report Notification: Failure Analysis of Core Shroud Repair Tie Rod Upper Support Crack | Finite Element Analysis |
ML052000333 | 14 July 2005 | Part 21 Communication: Circuit Breaker Replacement Primary Bushings Not Tested to ANSI Standards | |
ML051160241 | 14 April 2005 | Thermo Electron Svioc, SV18C and SV28C Series Recorders | |
ML023290162 | 18 November 2002 | Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable | MELLLA |