 Issue dateTitleTopic
ML18107A3441 June 1999Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716
ML18106B09325 February 1999Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified
ML18106B0551 February 1999Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl
ML18106B04429 January 1999Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables
ML17354B0979 September 1998Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils
ML17334B82023 June 1998Part 21 Rept Re Defective & Missing Welds Found on Ice Basket Bottom Cross Bar & Bottom Basket Grids During Insp of Unit 1 Ice Condenser.Investigation Ongoing.Defective Ice Basket Bottom Rims Will Be Repaired or ReplacedUnanalyzed Condition
ML20217K51924 October 1997Part 21 Rept Re Five Valves That May Have Defect Related to Possible Crack within Forging Wall at Die Flash Line.Caused by Less than Optimal Forging Temperatures.Newer Temperature Monitoring Devices at Forging Area Heating Ovens ProcuredHydrostatic
ML20217H87115 October 1997Part 21 Rept Re Potential Safety Hazard for Some 3/4 Sch 40 Pipe Shipped to CP&L & VA Power Corp.Matl Has Been Found to Have Areas Where Wall Thickness Falls Below Minimum Allowed by SA 312 Specification.Customers Have Been Notified
ML20211M6498 October 1997Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted
ML20211H79130 September 1997Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected
ML17264A93810 July 1997Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process
ML18153A14310 June 1997Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem
ML17333A86522 April 1997Part 21 Rept Re Defective Double Pole Torque Switch.Caused by Missing Spacer.Limitorque Instituted Addl Insp Check of Double Pole Torque Switches During Assembly & Licensees Must Review All Installed & in-stock Torque SwitchesAnchor Darling
ML17333A8449 April 1997Part 21 Rept Re Limitorque Torque Assembly Used in SMB-00 Valve Actuators That Were Missing Spacer.Replaced or Repaired Defective Assemblies by Addition of Spacer
ML20210E35927 March 1997Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A
ML17333A81619 March 1997Part 21 Rept Re Missing Spacers from Standard SMB-00 Torque Switch Assemblies.Caused by Defective Lot Received from Limitorque Facility.Replaced or Repaired Defective Assemblies by Addition of Spacer
ML17333A90419 March 1997Part 21 Rept Re Spacer Missing from Torque Switch Assembly for MOV 2-MMO-421 Which Allows Torque Switch Shaft to Rotate Slightly Along Length of Shaft.Defective Assemblies Replaced or Repaired by Addition of Spacer
ML18102A3706 September 1996Part 21 Rept Re Installation of NUS Model OCA 801 Signal Isolator Modules & Model Mth 801 Signal Summator Modules. Replacement Modules Including Spares for Plant,Unit 2 Have Been Inspected by Vendor & RepairedDesign basis earthquake
ML18102A33821 August 1996Part 21 Rept Re Chipping of Latching Mechanism Props Installed in GE 4 Kv magne-blast Circuit Breakers,Type AM-4.16-350-2H.Two Affected Breakers Have Been Returned to Vendor
ML18102A5598 August 1996Part 21 Rept Re Defect in NUS Model OCA801 Signal Isolator Modules.Replacement Modules Installed in Reactor Control & Protection SysDesign basis earthquake
ML20115J39822 July 1996Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl
ML20094M62521 November 1995Final Part 21 Rept of Investigation & Analysis of Suspect Fasteners Event 29257.B&G-Cardinal Discontinued Using Heat Treatment Equipment at Cardinal Facility Until Such Time That Satisfactory Mods Made to Hardware & Procedures
ML18101A8774 August 1995Interim Part 21 Rept Re Potentially Reportable Deficiency in Edward Valve Model 838YT Check Valves Due to Disk Exhibiting Excessive Leakage.Disk from Original Valve Cleaned, Inspected & Installed in Replacement Valve
ML18101A8611 August 1995Interim Part 21 Rept Re Velan Valve Corp Check Valve Failure to Close.Insp of Internals Showed Moderate Wear in Gap Between Valve Disc & Hanger Arm.New Disc Installed & Valve Tested Satisfactorily
ML20077C28021 November 1994Deficiency Rept Re Defective Yokes P/N 342849 Mfg by Copes- Vulcan,Inc.Affected Utilities Notified & Defective Yokes Will Be replaced.Copes-Vulcan Also re-inspected All Yokes in Inventory & Verified Yokes Acceptability
ML18153B08426 September 1994Suppl to 940902 Initial Part 21 Rept Re Defect W/Governor Valves Used in turbine-driven Pumps Mfg by Dresser-Rand to Formally Addresss Written 30 Day Rept Requirement of 10CFR21(c)(3)(ii)
ML18038A8977 September 1994Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures
ML18153B0602 September 1994Initial Part 21 Rept Re Steam Drive AFW Pump Governor Valve Mfg by Dresser-Rand.Maint Procedure to Stroke Governor Valve Stem Performed Weekly & Monitoring of Corrosion Build Up in Gland Seal Leakoff Area Performed Weekly
ML18100B23927 July 1994Part 21 Rept Re Signal Summators PM-505B & 506B Found to Saturate High When Summators Lose Power & Reenergized. Summators Powered from Independent Vital Instrument Buses & Inverters.Design Changes Implemented
ML18100B22725 July 1994Part 21 Rept Re Cracking in Valve Stem & Plug Connection Pinning Collar Area on PORVs 1PR1 & 1PR2.Caused Attributed to Either IGSCC or Hydrogen Assisted Cracking.Porv Internals Replaced W/Internals Mfg from SS 316 Matl W/Plug Stellited
ML18100B21014 July 1994Deficiency Rept Re PORV Plug & Stem Material Defects. Initially Reported 940714.PORV Internals Were Replaced W/Plug Stellited
ML18100B19130 June 1994Initial Part 21 Rept Re Deficiency in Signal Summators PM-505B & PM-506B Supplied by Westinghouse.Design Changes Implemented & Operators Made Aware of Affects of Power Supply Transient on Summator Operability
ML20059H77217 January 1994Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412
ML20059F2637 January 1994Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical
ML18100A76813 December 1993Interim Part 21 Rept Re Discovery That Ge/Alco EDGs High Pressure Injection Tube Studs Did Not Meet Correct Matl non- Std & Not Correct Geometry.All Nonconforming Studs Identified & Replaced
ML20056D70715 July 1993Part 21 Rept Re Reportable defect-75 PSIG Relief Check Valve 1 Npt,Emd 9521844,Kepner 416C-1-75
ML20044G54326 May 1993Part 21 Rept Re Rosemount Model 1154 Series H Pressure Transmitters W/Temp Performance Characteristics Not in Compliance W/Specs.Vendor in Process of Notifying Customers.Sample Notification Ltr to Util Encl
ML18096B2421 February 1993Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl
ML20126J59631 December 1992Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils EnclHydrostatic
ML20126F80822 December 1992Part 21 Rept Re Possible Condition of Gag Plug in Cap of Valves That Cause Valves Not to Lift to Requirement for Providing Full Capacity.Affected Customers Notified.Removal of Caps &/Or Gag Plugs Recommended
ML20125C7167 December 1992Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils EnclStroke time
Anchor Darling
ML20127P58623 November 1992Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl
ML20118B43911 September 1992Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option
ML18153D0813 August 1992Interim Part 21 Rept Re Analysis of Klockner-Moeller Model NZM6-63,480 Volt Circuit Breakers.Initially Reported on 920701.Lever Fracture Should Be Examined to Determine If Any Cleaning Sprays or Purifying Agents Have Been Used
ML20101L9661 July 1992Part 21 Rept Re Discovery of Klockner-Moeller 480-volt Breaker in Tripped Condition Due to Fracture of Plastic Arm within Breaker.Two of Three Failed Breakers Sent to Mfg for Analysis.Results Expected by End of Jul 1992
ML20090L88018 March 1992Part 21 Re Cracked Piston Castings Received from Acme Foundry,Fairbanks Morse & General Casting.Magnetic Particle Insp of All Pistons Will Be Performed.List of Affected Plants Encl
ML20094F51823 December 1991Part 21 Rept Re Matl Used in Johnson Kokogawa Corp Wear Plate Blades Not Displaying Sufficient Spring Capabilities to Adequately Hold Rom Chip Pins When Rom Mounted in Socket.Util Advised That Improved Sockets Now Available
ML20058A74019 October 1990Part 21 Rept Re Loose Motor Lead Connections on New Limitorque Motor Operators.List of Loose Connections Encl
ML20059M17524 September 1990Supplemental Part 21 Rept 1 Re Defect in Coltec Industries, Inc Connecting Rod Assemblies Nuts/Bolts on Model 38TD8-1/8 Emergency Generators.Initially Reported on 851120.Nuts/bolts for Assemblies at Stated Plants Inspected & Replaced
ML18095A4032 August 1990Part 21 Rept Re MSIV Design Deficiency at Plant.Design Spec Provided by Westinghouse Did Not Specify Requirement to Provide Seal in Capability & Util Design Process Failed to Recognize Deficiency