RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 13 December 2023 | Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Safe Shutdown Arc flash FLEX Missed surveillance Surveillance Frequency Control Program Offsite Circuit |
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 25 May 2023 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Hydrostatic Surveillance Frequency Control Program |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Reactor Vessel Water Level |
JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 22 June 2020 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | Time of Discovery |
RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls | 26 June 2019 | Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls | High Radiation Area Locked High Radiation Area Process Control Program Deep Dose Equivalent |
RS-19-023, Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1 | 5 March 2019 | Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1 | High winds Safe Shutdown Earthquake Hydrostatic Squib Surveillance Frequency Control Program Power Operated Valves Recently irradiated fuel |
RS-16-187, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 19 September 2016 | Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Safe Shutdown High winds Mission time Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination VT-2 Aging Management Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Moisture barrier Scaffolding |
RS-11-022, Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit | 7 June 2011 | Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit | Reactor Vessel Water Level Anticipated operational occurrence Minimum Critical Power Ratio Fuel cladding |
RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | 3 March 2010 | Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | Hot Short Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Multiple Spurious Operation Scram Discharge Volume Large early release frequency Earthquake Maintenance Rule Program Turbine Missile Fuel cladding Power change |
RS-10-032, Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | 16 February 2010 | Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | Safe Shutdown High winds Shutdown Margin High Radiation Area Ultimate heat sink Mission time Grab sample Stroke time Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Squib Incorporated by reference Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Spiral reload Battery sizing Overtravel Power Operated Valves Turbine Missile Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit |
RS-09-152, Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System | 10 November 2009 | Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System | Hot Short Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level Mission time Stroke time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Design basis earthquake Scram Discharge Volume Large early release frequency Earthquake Maintenance Rule Program Turbine Missile Fuel cladding Power change |
RS-09-104, Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage | 28 August 2009 | Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage | Grab sample Enforcement Discretion Pressure Boundary Leakage Unidentified leakage |
ML082390707 | 21 August 2008 | Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses | Fire Protection Program |
RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I | 9 June 2008 | Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im | Incorporated by reference Scram Discharge Volume Overtravel |
ML073540049 | 19 December 2007 | Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages | Safeguards Contingency Plan Fire Protection Program |
RS-06-181, Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report | 15 December 2006 | Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report | |
RS-06-147, Quad, Units 1 & 2 - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint Tolerance and Standby Liquid Control System Enrichment | 7 November 2006 | Quad, Units 1 & 2 - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint Tolerance and Standby Liquid Control System Enrichment | Safe Shutdown Shutdown Margin Stroke time Feedwater Controller Failure Power change Power Uprate Affidavit |
ML061310396 | 10 May 2006 | Correction of Typographical Errors in Issuance of Amendments Dated March 9, 2006 | |
ML053130192 | 17 October 2005 | Technical Specification Pages Pressure and Temperature Limits | Hydrostatic |
RS-05-075, Request for Amendment to Technical Specifications Associated with Feedwater System and Main Turbine High Water Level Trip Instrumentation | 15 June 2005 | Request for Amendment to Technical Specifications Associated with Feedwater System and Main Turbine High Water Level Trip Instrumentation | Reactor Vessel Water Level Feedwater Controller Failure Fuel cladding |
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | 29 November 2004 | Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | Safe Shutdown Unanalyzed Condition |
SVP-04-099, Renewal of National Pollutant Discharge Elimination System (NPDES) Permit No. Il 0005037 | 17 November 2004 | Renewal of National Pollutant Discharge Elimination System (NPDES) Permit No. Il 0005037 | Coatings Biofouling |
RS-04-133, Request for Changes Related to Technical Specifications Section 3.4.9, Reactor Coolant System Pressure-and Temperature (Pit) Limits. | 4 November 2004 | Request for Changes Related to Technical Specifications Section 3.4.9, Reactor Coolant System Pressure-and Temperature (Pit) Limits. | Unanalyzed Condition Shutdown Margin Anticipated operational occurrence Hydrostatic |
RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | 30 April 2004 | Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | |
RS-03-165, Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing | 8 August 2003 | Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing | |
RS-03-087, Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30D | 25 April 2003 | Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30D | Stroke time Foreign Material Exclusion |
RS-03-038, Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function | 28 March 2003 | Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio |
ML023450570 | 27 November 2002 | Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process | Offsite Dose Calculation Manual Incorporated by reference Annual Radioactive Effluent Release Report |
RS-02-152, . Request for Technical Specifications Surveillance Requirement 3.3.4.1.2 Change Related to Anticipated Transient Without Scram- Recirculation Pump Trip Instrumentation | 22 August 2002 | . Request for Technical Specifications Surveillance Requirement 3.3.4.1.2 Change Related to Anticipated Transient Without Scram- Recirculation Pump Trip Instrumentation | Reactor Vessel Water Level Fuel cladding |
ML021990388 | 17 July 2002 | Quad-Cities Units 1 & 2, Technical Specification Pages Re AC Sources - Operation 3.8.1 Surviellance Requirements | Qualified Offsite Circuit Fuel cladding Offsite Circuit |
ML021140015 | 19 April 2002 | Technical Specification Pages for Amendment No. 205 and 201 - Revise Surveillance Requirement 3.0.3 to Extend the Delay Period, Before Entering a Limiting Condition for Operation, Following a Missed Surveillance | Time of Discovery Missed surveillance |
ML17037B779 | 7 February 1974 | Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... | |