Category:Technical Specification
MONTHYEARRS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML21300A3392021-10-21021 October 2021 Revised Technical Specification Bases ML21179A0502021-06-21021 June 2021 Technical Specification Bases RS-21-036, Response to Request for Additional Information Re Dresden License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2021-03-16016 March 2021 Response to Request for Additional Information Re Dresden License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML20323A2542020-11-18018 November 2020 Markup of Proposed Technical Specifications Bases Pages RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.32020-04-0101 April 2020 Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control2019-06-18018 June 2019 Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control RS-19-023, Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.12019-03-0505 March 2019 Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1 RS-18-134, Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits2018-12-0505 December 2018 Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits RS-17-126, Technical Specification Bases2017-10-19019 October 2017 Technical Specification Bases RS-17-082, Dresden Nuclear Power Station, Units 2 & 3, Technical Specification Bases - Affected Page List2017-06-21021 June 2017 Dresden Nuclear Power Station, Units 2 & 3, Technical Specification Bases - Affected Page List ML17180A1262017-06-21021 June 2017 Technical Specification Bases - Affected Page List RS-16-199, Supplement to Request for License Amendment Regarding Transition to Areva Fuel2016-09-28028 September 2016 Supplement to Request for License Amendment Regarding Transition to Areva Fuel RS-16-187, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-09-19019 September 2016 Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. RS-15-297, Request for License Amendment to Dresden Nuclear Power Station Technical Specification 3.8.1, AC Sources - Operating.2015-12-14014 December 2015 Request for License Amendment to Dresden Nuclear Power Station Technical Specification 3.8.1, AC Sources - Operating. RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of.2014-12-22022 December 2014 License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process RS-12-036, License Amendment Request to Technical Specifications Section 5.6.5, Core Operating Limits Report (Colr).2012-04-0303 April 2012 License Amendment Request to Technical Specifications Section 5.6.5, Core Operating Limits Report (Colr). RS-11-159, Quad Cities, Units 1 and 2 - Technical Specification Bases2011-10-19019 October 2011 Quad Cities, Units 1 and 2 - Technical Specification Bases ML11305A1472011-10-19019 October 2011 Technical Specifications Bases Affected Page List ML11305A1352011-10-19019 October 2011 Technical Specification Bases RS-11-159, Quad Cities, Units 1 and 2 - Technical Specifications Bases Affected Page List2011-10-19019 October 2011 Quad Cities, Units 1 and 2 - Technical Specifications Bases Affected Page List RS-11-100, Updated Final Safety Analysis Report (Ufsar), Revision 9, Affected Page List - Technical Specification Bases, Revision 542011-06-29029 June 2011 Updated Final Safety Analysis Report (Ufsar), Revision 9, Affected Page List - Technical Specification Bases, Revision 54 RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases2011-06-29029 June 2011 Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases ML11202A2052011-06-29029 June 2011 Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases RS-11-022, Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit2011-06-0707 June 2011 Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit RS-10-165, Follow-up Information Supporting Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation2010-10-0606 October 2010 Follow-up Information Supporting Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.2010-03-0303 March 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. RS-10-032, Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2010-02-16016 February 2010 Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) RS-10-024, Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program2010-02-16016 February 2010 Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program RS-09-152, Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System2009-11-10010 November 2009 Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System RS-09-104, Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage2009-08-28028 August 2009 Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage RS-08-155, Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.52008-12-0909 December 2008 Additional Information Supporting Request for License Amendment to Establish Total Battery Connector Resistance Acceptance Criteria in Technical Specifications Surveillance Requirements 3.8.4.2 and 3.8.4.5 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im ML0735400492007-12-19019 December 2007 Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program RS-07-066, Request for License Amendment to Revise Turbine Condenser Vacuum - Low Scram Instrumentation Function2007-08-0101 August 2007 Request for License Amendment to Revise Turbine Condenser Vacuum - Low Scram Instrumentation Function RS-07-097, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit2007-07-10010 July 2007 Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0702305402007-01-16016 January 2007 NF-BEX-06-281, Rev 0, Quad Cities, Unit 1 Cycle 20 SLMCPR, NP-Attachement 2023-05-25
[Table view] Category:Amendment
MONTHYEARRS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-19-023, Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.12019-03-0505 March 2019 Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1 RS-16-187, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-09-19019 September 2016 Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-15-297, Request for License Amendment to Dresden Nuclear Power Station Technical Specification 3.8.1, AC Sources - Operating.2015-12-14014 December 2015 Request for License Amendment to Dresden Nuclear Power Station Technical Specification 3.8.1, AC Sources - Operating. RS-11-022, Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit2011-06-0707 June 2011 Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.2010-03-0303 March 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. RS-10-032, Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2010-02-16016 February 2010 Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) RS-09-152, Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System2009-11-10010 November 2009 Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System RS-09-104, Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage2009-08-28028 August 2009 Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im ML0735400492007-12-19019 December 2007 Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages RS-07-097, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit2007-07-10010 July 2007 Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit RS-06-181, Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report2006-12-15015 December 2006 Byron, Dresden, LaSalle, Peach Bottom, and Quad Cities Nuclear Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report ML0631700832006-11-0707 November 2006 Technical Specification, 2.0 Safety Limits RS-06-147, Quad, Units 1 & 2 - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint Tolerance and Standby Liquid Control System Enrichment2006-11-0707 November 2006 Quad, Units 1 & 2 - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint Tolerance and Standby Liquid Control System Enrichment ML0613103962006-05-10010 May 2006 Correction of Typographical Errors in Issuance of Amendments Dated March 9, 2006 ML0608802512006-03-17017 March 2006 Technical Specification Pages Regarding Offsite Power Instrumentation and Voltage Control ML0531301922005-10-17017 October 2005 Technical Specification Pages Pressure and Temperature Limits RS-05-075, Request for Amendment to Technical Specifications Associated with Feedwater System and Main Turbine High Water Level Trip Instrumentation2005-06-15015 June 2005 Request for Amendment to Technical Specifications Associated with Feedwater System and Main Turbine High Water Level Trip Instrumentation RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program SVP-04-099, Renewal of National Pollutant Discharge Elimination System (NPDES) Permit No. Il 00050372004-11-17017 November 2004 Renewal of National Pollutant Discharge Elimination System (NPDES) Permit No. Il 0005037 RS-04-133, Request for Changes Related to Technical Specifications Section 3.4.9, Reactor Coolant System Pressure-and Temperature (Pit) Limits.2004-11-0404 November 2004 Request for Changes Related to Technical Specifications Section 3.4.9, Reactor Coolant System Pressure-and Temperature (Pit) Limits. RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2004-04-30030 April 2004 Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML0332104192003-11-26026 November 2003 Amendment, Reactor Coolant System Pressure and Temperature Limits RS-03-165, Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing2003-08-0808 August 2003 Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing RS-03-087, Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30D2003-04-25025 April 2003 Request for Amendment to Technical Specifications Surveillance Requirements for the Main Steam Line Relief Valves and Relief Request RV-30D RS-03-038, Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function2003-03-28028 March 2003 Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process RS-02-152, . Request for Technical Specifications Surveillance Requirement 3.3.4.1.2 Change Related to Anticipated Transient Without Scram- Recirculation Pump Trip Instrumentation2002-08-22022 August 2002 . Request for Technical Specifications Surveillance Requirement 3.3.4.1.2 Change Related to Anticipated Transient Without Scram- Recirculation Pump Trip Instrumentation ML0219903882002-07-17017 July 2002 Quad-Cities Units 1 & 2, Technical Specification Pages Re AC Sources - Operation 3.8.1 Surviellance Requirements ML0211400152002-04-19019 April 2002 Technical Specification Pages for Amendment No. 205 and 201 - Revise Surveillance Requirement 3.0.3 to Extend the Delay Period, Before Entering a Limiting Condition for Operation, Following a Missed Surveillance ML17037B7791974-02-0707 February 1974 Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... 2023-05-25
[Table view] |