ML20205K24415 March 1999Rev 3 to Calculation 52308.04-C-004, A-46 Evaluation of RWST Tag Number 105.TK-1,2-QS-TK-1
ML20205K23515 March 1999Rev 1 to Calculation 52308.04-C-003, A-46 Evaluation of CST Tag Number 1-CN-TK-1,2-CN-TK-1
ML20205B58226 January 1999Audit Rept on Implementation of GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants, for North Anna Nuclear Generating Station,Units 1 & 2,conducted on 990126-28
ML20202B31813 June 1997Rev 0 to Calculation 100031-C-06, Project Specific Verification of Computer Code Super Sassi/Pc
ML20202B28412 June 1997Rev 0 to Calculation 100031-C-05, Stress Calculation
ML20202B27012 June 1997Rev 0 to Calculation 100031-C-04, Sliding & Overturning Factor of Safety
ML20202B22812 June 1997Rev 0 to Calculation 100031-C-03, Pad Model & Input to Module House
ML20202B18512 June 1997Rev 0 to Calculation 100031-C-02, Sassi:Modules Point & Site
ML20202B15412 June 1997Rev 0 to Calculation 100031-C-01, Development of Soil ProfileEarthquake
ML17354A4327 March 1997Ampacity Derating for Cables in Raceways & Boxes w/Thermo- Lag 330 & w/Thermo-Lag 330 W/Layer of Thermo-Lag 770 Fire Barrier Coating.Safe Shutdown
Fire Barrier
Coatings
ML17354A4317 March 1997Review of Ampacity Ratings for Power Cables in Conduits & Trays w/Thermo-Lag 330-1 Covering.Fire Barrier
ML17354A4307 March 1997Fire Barrier Acf for T-Lag 330-1/770-1 Assemblies.Safe Shutdown
Fire Barrier
ML17354A4297 March 1997Ampacity Derating Response to NRC GL 92-08 for Cables Routed in Conduit & Tray w/Thermo-Lag 330-1 Barrier Sys Coating.Safe Shutdown
Fire Barrier
Coatings
ML20133L84321 January 1997Press Release II-97-12, NRC Chairman to Visit Turkey Point Will Meet W/Press at 1:00 Pm at Site
ML20133B4083 January 1997Press Release II-97-02, NRC Staff Issues Order to Former North Anna Contract Employee Prohibiting Involvement in NRC- Licensed Activities
ML20134G46212 November 1996Press Release II-96-92, Surry Nuclear Plant Rated Superior in Three Areas, Good in Fourth Area of NRC Assessment ReptSystematic Assessment of Licensee Performance
ML20134G48312 November 1996Press Release II-96-93, NRC Official to Hold News Conference at Surry Plant in VA on 961118Systematic Assessment of Licensee Performance
ML20134D22117 October 1996Press Release 96-145, NRC Asks Utility Licensees for Info on Concrete Containment Foundations at Nine Nuclear Plants
ML18151A41425 June 1996Addendum a to Rev 0 to ME-0498, Pressure Locking & Stem Effect Thermal Binding Analysis for GL 95-07.Stroke time
Weak link
ML20137M71125 July 1995Quality Assurance Audit Rept QAS-ENV-95-1, Radiological Environ Monitoring Program & Site Nonradiological Environ Protection Plans Functional Area Audit, 950525-0714Annual Radiological Environmental Operating Report
ML18153A0133 April 1995Rev 5 to ME-0465, Determination of Heat Transfer Impact to Lhsi Sump Recirculation Valves During Initial DBA Event. W/One Oversize Drawing
ML20203B43227 February 1995Rev 0 to Calculation CE-1181, Structural Design Criteria for ISFSI at North Anna Power StationSafe Shutdown Earthquake
Operating Basis Earthquake
Tornado Generated Missile
Design basis earthquake
Earthquake
ML20137K7458 February 1994QA Audit of Turkey Point Design Control,Including Production Engineering Group
ML20059G59010 January 1994Verification of Structural Adequacy of Manway Cover Fastners Under Design Pressure for Vol Control Tank (2-CH-TK-2)
ML18152A13330 December 1993Rev 0 to Calculation 52182-C-013, RWST Tank USI-A-46 1&2-CS-TK-1.Earthquake
ML20058P0418 September 1993Package Consisting of Employee Concerns Programs for Plant
ML20064K7528 June 1993Package Consisting of St Lucie & Turkey Point 1992 Preliminary Llnl Hazard Estimates for Peak Acceleration
ML17349A24927 March 1992Unit 3 Load Centers Undervoltage Relay Set Points.
ML17349A25027 March 1992Verification of Degraded Voltage Relay Protection for Safety-Related Equipment (Coordination Between Undervoltage & Overcurrent Protection) for Unit 3
ML20079N22011 November 1991Responses to NUMARC Survey in Support of NRC License Renewal RulemakingUltimate heat sink
License Renewal
Biofouling
ML20079N23611 November 1991Responses to NUMARC Aquatic Resource Survey in Support of NRC License Renewal RulemakingLicense Renewal
ML20085M58811 November 1991Responses to Aquatic Resources & Socioeconomic Questions & Outage Manpower & Cost Estimates Data.Undated Document
ML20085M57311 November 1991Responses to Questions Re Waste Mgt,Aquatic Resources & Socioeconomic ImpactsLicense Renewal
ML17348A94715 March 1991PSB-1 Voltage Analysis for Electrical Auxiliary Sys.
ML17348B31831 July 1990Data Rept for Eddy Current Exam Results for Exam Period 900228-0313
ML20155F8037 September 1988Viewgraphs from Meeting on New Radwaste Facilities at PlantsProcess Control Program
ML20151M96020 July 1987Package of NRC Administered Requalification Exam Results Summary
IA-87-262, Package Consisting of Undated Chart on Matls & Undated Reportable Event 07140 on Unevaluated Info Re 861209 Event16 June 1987Package Consisting of Undated Chart on Matls & Undated Reportable Event 07140 on Unevaluated Info Re 861209 Event
ML20215D05116 June 1987Package Consisting of Undated Chart on Matls & Undated Reportable Event 07140 on Unevaluated Info Re 861209 Event
IA-87-217, Package,Including Morning Rept Re Plant 861209 Rupture of Suction Line on Main Feedwater Unit a & Drawings18 May 1987Package,Including Morning Rept Re Plant 861209 Rupture of Suction Line on Main Feedwater Unit a & Drawings
ML20213F94018 May 1987Package,Including Morning Rept Re Plant 861209 Rupture of Suction Line on Main Feedwater Unit a & Drawings
ML20215H9625 February 1987Package Consisting of NRR Presentation to ACRS Re 870115 Technical Meeting to Consider Generic Implications of Facility Feedwater Line Failure & J Rosenthal Failure of Main Feedwater Pipe 861209 OutlineNondestructive Examination
Fatality
ML20203H28528 July 1986Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131Hydrostatic
IA-86-445, Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 82013128 July 1986Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131Hydrostatic
ML20138Q84511 December 1985LES Scss Data Printout,Consultant Inspector Notes,Insp Preliminary Findings & Performance Appraisal ObservationBoric Acid
Hydrostatic
ML20199E4801 October 1985Press Release Advising of Receipt of Encl ACRS Ltr Re Recent Auxiliary Feedwater Failures,For Immediate Release
IA-85-442, Package of Operator Exam Results Summary Sheets18 July 1985Package of Operator Exam Results Summary Sheets
ML20134L58118 July 1985Package of Operator Exam Results Summary Sheets
ML20129F4839 May 1985Package of Compilations of Results of Operator Licensing & Requalification Exams
ML20112G39822 October 1984Emergency Preparedness Exercise Scenario Timeline,Including Control Room Data Sheets & Contingency Messages