... ACCELERATED DI TRIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9201080229 DOC.DATE: 90/07/31 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 AUTH. NAME AUTHOR AFFILIATION
- Florida Power & Light Co.
NOTES'OCKET RECIP.NAME
SUBJECT:
900228-0313.
RECIPIENT AFFILIATION Data rept for eddy DISTRIBUTION CODE: A001D current exam results for COPIES RECEIVED LTR P ENCL eaxm
/
period SIZE:
R D
TITLE: OR Submittal: General Distribution RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA PD2-2 PD AULUCK,R D INTERNAL: NRR/DET/ECMB 7D NRR/DET/ESGB D NRR/DOEA/OTS B 1 1 NRR/DST 8E2 NRR/DST/SELB 7E NRR/DST/SICB8H7 NRR/DST/SRXB 8E NUDOCS-ABSTRACT OC/LF5IB G FILE ~1 OGC/HDS3 RES/DSIR/EIB EXTERNAL: NRC PDR NSIC R
D D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ g ENCL 16
b"ORM NIS-BB 'OWNERS'RATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b rovisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT: Turkey Point Plant Unit No. 3 EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 STEAM TOTAL TOTAL IND TOTAL IND TOTAL TUBES TOTAL GENERATOR TUBES > OR = TO OR = TO PLUGGED AS TUBES NUMBER INSPECTED 204 TO 39% 404 TO 1004 PREVENTIVE PLUGGED MAINT 3E210A 3203 17 3E210B 3205 22 5 (1) 3E210C 3194 32 6 (2)
(1) 4 Hot Leg plugs were also replaced LOCATION OF INDICATIONS (2) 3 Hot Leg plugs were also 'replaced STEAM AVB DRILLED SUPPORT TOP OF TUBE SHEET GENERATOR BARS 1 THROUGH 6 TO 1 DRILLED SUPPORT HOT LEG COLD LEG HOT LEG COLD LEG 3E210A 4 3E210B ., 7 3E210C 20 CERTIFICATION OF RECORD We certify that the statements in this record are correct and the tubes inspected were tested in accordance with the requirements of Section XI of the ASME Code.
FLORIDA POWER and LIGHT COMPANY (Organization)
Date: By:
9I to PAGE NIS-BB -2 OOOOOB 920i080229 900731 PDR ADOCK 05000 50-P PDR
FORM HIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b e rovisions of the ASME de Rules STEAM GENERATOR TUBES PLUGGED STEAM GENERATOR STEAM GENERATOR STEAM GENERATOR 3E210A 3E210B 3E210C ROW COLUMN REMARKS ROW COLUMN REMARKS ROW COLUMN REMARKS HOT LEG STUB TUBE STUB TUBE 14 6 TUBE SHEET 7 13 STUB TUBE 13 STUB TUBE 40 38 ¹2 AVB
¹4 SUP. ¹5 SUP 9 32 HOT LEG 40 39 HOT LEG 35 47 ¹3 AVB V2
.33 44 ¹3 AVB 41 ~R ¹3 AVB 38 53 ¹3 AVB 42 43 ¹2 AVB 38 54 ¹2 AVB COLD LEG 13 89 TUBE SHEET THE FOLLOWING HOT LEG PLUGS WERE ALSO REPLACED 42 30 STUB TUBE 25 32 13 STUB TUBE 45 43 14 89 45 ~
44 PAGE NIS-BB -3
FORM NIS-BB OWNERS'ATA 'REPORT FOR EDDY CUEGKNT EXAMINATION RESULTS As required by provisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT: Turkey Point Nuclear Pover Plant Unit No. 3 STEAM GENERATOR: 3E210A EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 TUBE WALL ROW COLUMN PENETRATION ORIGIN LOCATION 37 HOT LEG 06H 2.9 16 29 HOT LEG TSH 1. 4 13 29 HOT LEG TSH 3.8 10 37 COLD LEG 01C 10.2 22 15 30 COLD LEG 03C 45.0 10 16 34 COLD LEG 02C 23.9 18 29 COLD LEG BAC 24.5 31 19 24 COLD LEG 04C 48.5
- 33 44 39 AVB AV3 .0 38 45 24 AVB AV2.. 0 22 52 38 HOT LEG 04H 40. 9 HOT LEG (INLET)
- Preventively Plugged COLD LEG (OUTLET)
PAGE NIS-BB -4
FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b e rovisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT: TURKEY POINT NUCLEAR POWER PLANT UNIT NO. 3 STEAM GENERATOR: 3E210A EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 0 TUBE WALL ROW COLUMN PENETRATION ORIGIN LOCATION 15 55 30 COLD LEG TSC 8.1 30 58 27 AV.B AV1 .0 29 AVB AV3 .0 28 59 20 AVB AV2 .0 27 70 21 HOT LEG 01H 46.0 32 75 25 AVB AV3 2. 1 HOT LEG (INLET)
COLD LEG (OUTLET)
PAGE NIS-BB -5
FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b rovisions of the ASME e Rules FREDDY CURRENT EXAMINATION RESULTS PLANT: Turkey Point Nuclear Power Plant Unit No. 3 STEAM GENERATOR: 3E210B EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 TUBE WALL ROW COLUMN PENETRATION ORIGIN LOCATION 10 32 COLD LEG 02C 31. 8 23 10 32 HOT LEG 06H 3.7 19 12 37 HOT LEG TSH .5 28 14 29 HOT LEG 01H 9.8 37 23 25 COLD LEG 06C .0 28 28 38 COLD LEG 03C 34. 2 32 32 HOT LEG TSH 39.0 34 31 HOT LEG TSH 31.3 42 37 37 HOT LEG TSH .3 34 38 26 AVB AV2 .0 25 AVB AV3 .0 HOT LEG (INLET)
COLD LEG (OUTLET)
PAGE NIS BB -6
lI g FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b rovisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT: Turkey Point Nuclear Power Plant Unit No. 3 STEAM GENERATOR: 3E210B EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 TUBE WALL ROW COLUMN PENETRATION ORIGIN LOCATION 42 38 28 HOT LEG TSH 1. 3 27 HOT LEG TSH 3.1 39 39 37 HOT LEG 05H .3 41 42 29 AVB AV2 .0
- 42 43 38 AVB AV2 .0 20 AVB AV3 .0 44 38 HOT LEG TSH 38 '
42 45 23 AVB AV2 .0 34 46 24 AVB AV3 .0 72 27 HOT LEG 02H 36.5 85 26 HOT LEG 02H 36.6 HOT LEG (INLET)
- Preventatively Plugged COLD LEG (OUTLET)
PAGE NIS-BB -7
FORM NIS-BB OWNERS 'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As required by t e provisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT: Turkey Point Nuclear Power Plant Unit No. 3 STEAM GENERATOR: 3E210C EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 TUBE WALL ROW COLUMN PENETRATION ORIGIN LOCATION 27 30 24 AVB AV2 13. 0 34 30 COLD LEG TSC 28.4
- 40 38 35 AVB AV2 .0 30 AVB AV3 .0 27 AVB AV4 .0 39 33 COLD LEG 03C 11 2
~
33 39 33 AVB AV1 .0 25 AV3 .0 35 33 AVB AV1 .0 22 AVB AV2 .0 33 43 21 AVB AV3 .0 HOT LEG (INLET)
COLD LEG (OUTLET)
PAGE NIS-BB -8
'I
~ W ~
r'ORN NLS-BB OWNERS 'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b he rovisions of the ASME de Rules EDDY CURRENT EXAMINATION RESULTS PLANT: Turkey Point Nuclear Power Plant Unit No. 3 STEAM GENERATOR: 3E210C EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 TUBE WALL ROW COLUMN PENETRATION ORIGIN LOCATION 35 43 21 AVB AV1 .0 22 AVB AV2 .0 27 AVB AV3 .0 22 AVB AV4 .0 13 44 27 HOT LEG 02H 51. 2 35 44 27 AVB AV2 .0 28 AVB AV3 .0 35 45 34 AVB AV2 .0 22 AVB AV4 l
.0 30 46 27 AVB AV1 .0 25 AVB AV2 .0 HOT LEG (INLET)
COLD LEG (OUTLET)
PAGE NIS-BB -9
~ 'JP (I
Pt p l A
FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b e rovisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT: Turkey Point Nuclear Power Plant Unit No. 3 STEAM GENERATOR: 3E210C EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 TUBE WALL ROW COLUMN PENETRATION ORIGIN LOCATION 21 AVB AV3 .0
- 35 47 22 AVB AV2 .0 39 AVB AV3 .0 30 48 34 AVB AV3 .0 14 53 22 HOT LEG TSH 1. 2
- 38 53 34 AVB AV2 39 AVB AV3 .0
- 38 54 22 AVB AV1 .0 36 AVB AV2 .0 20 AVB AV3 .0 HOT LEG (INLET)
- Preventatively Plugged COLD LEG (OUTLET)
PAGE NIS-BB -10