... ACCELERATED DI TRIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9201080229 DOC.DATE: 90/07/31 NOTARIZED:
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Data rept for eddy current exam results for eaxm period 900228-0313.
DISTRIBUTION CODE:
A001D COPIES RECEIVED LTR P ENCL
/
SIZE:
TITLE: OR Submittal:
General Distribution NOTES'OCKET 05000250 R
D RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R INTERNAL: NRR/DET/ECMB 7D NRR/DOEA/OTS B1 1 NRR/DST/SELB 7E NRR/DST/SRXB 8E OC/LF5IB G FILE ~1 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS3 RES/DSIR/EIB NSIC COPIES LTTR ENCL D
D R
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
g TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~ ENCL 16
b"ORM NIS-BB 'OWNERS'RATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b rovisions of the ASME e Rules EDDY CURRENT EXAMINATIONRESULTS PLANT:
Turkey Point Plant Unit No.
3 EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 STEAM GENERATOR NUMBER TOTAL TOTAL IND TUBES
> OR = TO INSPECTED 204 TO 39%
TOTAL IND OR = TO 404 TO 1004 TOTAL TUBES PLUGGED AS PREVENTIVE MAINT TOTAL TUBES PLUGGED 3E210A 3203 17 3E210B 3E210C 3205 3194 22 32 5 (1) 6 (2)
(1) 4 Hot Leg plugs were also replaced LOCATION OF INDICATIONS (2) 3 Hot Leg plugs were also 'replaced STEAM GENERATOR AVB BARS DRILLED SUPPORT 1 THROUGH 6 TOP OF TUBE SHEET TO 1 DRILLED SUPPORT HOT LEG COLD LEG HOT LEG COLD LEG 3E210A 4
3E210B
., 7 3E210C 20 CERTIFICATION OF RECORD We certify that the statements in this record are correct and the tubes inspected were tested in accordance with the requirements of Section XI of the ASME Code.
FLORIDA POWER and LIGHT COMPANY (Organization)
Date:
By:
9I to OOOOOB 920i080229
- PDR ADOCK P
PAGE NIS-BB -2 900731 05000 50-PDR
FORM HIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b e
rovisions of the ASME de Rules STEAM GENERATOR TUBES PLUGGED STEAM GENERATOR 3E210A STEAM GENERATOR 3E210B STEAM GENERATOR 3E210C ROW COLUMN REMARKS ROW COLUMN REMARKS ROW COLUMN REMARKS STUB TUBE STUB TUBE 14 HOT LEG 6
TUBE SHEET 7
13 STUB TUBE 13 STUB TUBE 40 38
¹2 AVB 9
32
¹4 SUP.
HOT LEG 40 39
¹5 SUP HOT LEG 35 47
¹3 AVB
.33 44
¹3 AVB 41 V2
~R
¹3 AVB 38 53
¹3 AVB 42 43
¹2 AVB 38 54 13 89
¹2 AVB COLD LEG TUBE SHEET THE FOLLOWING HOT LEG PLUGS WERE ALSO REPLACED 42 30 STUB TUBE 25 32 13 STUB TUBE 45 43 14 89 45
~ 44 PAGE NIS-BB -3
FORM NIS-BB OWNERS'ATA 'REPORT FOR EDDY CUEGKNT EXAMINATION RESULTS As required by provisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT:
Turkey Point Nuclear Pover Plant Unit No.
3 STEAM GENERATOR:
3E210A EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 ROW COLUMN TUBE WALL PENETRATION ORIGIN LOCATION 37 HOT LEG 06H 2.9 16 29 HOT LEG TSH 1. 4 13 29 HOT LEG TSH 3.8 10 37 COLD LEG 01C 10.2 22 15 30 COLD LEG 03C 45.0 10 16 18 34 29 COLD LEG COLD LEG 02C 23.9 BAC 24.5 31 19 24 COLD LEG 04C 48.5
- 33 44 39 AVB AV3
.0 38 45 24 AVB AV2.. 0 22 52 38 HOT LEG 04H 40. 9 HOT LEG (INLET)
COLD LEG (OUTLET)
- Preventively Plugged PAGE NIS-BB -4
FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b e
rovisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT:
TURKEY POINT NUCLEAR POWER PLANT UNIT NO.
3 STEAM GENERATOR:
3E210A EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 ROW COLUMN 0 TUBE WALL PENETRATION ORIGIN LOCATION 15 55 30 COLD LEG TSC 8.1 30 58 27 AV.B AV1
.0 29 AVB AV3
.0 28 59 20 AVB AV2
.0 27 70 21 HOT LEG 01H 46.0 32 75 25 AVB AV3 2. 1 HOT LEG (INLET)
COLD LEG (OUTLET)
PAGE NIS-BB -5
FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b rovisions of the ASME e Rules FREDDY CURRENT EXAMINATION RESULTS PLANT:
Turkey Point Nuclear Power Plant Unit No.
3 STEAM GENERATOR:
3E210B EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 ROW COLUMN TUBE WALL PENETRATION ORIGIN LOCATION 10 32 COLD LEG 02C 31. 8 23 10 32 HOT LEG 06H 3.7 19 12 37 HOT LEG TSH
.5 28 14 29 HOT LEG 01H 9.8 37 23 25 COLD LEG 06C
.0 28 28 38 COLD LEG 03C 34. 2 32 32 HOT LEG TSH 39.0 34 31 HOT LEG TSH 31.3 42 37 37 HOT LEG TSH
.3 34 38 26 AVB AV2
.0 25 AVB AV3
.0 HOT LEG (INLET)
COLD LEG (OUTLET)
PAGE NIS BB -6
lIg
FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b rovisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT:
Turkey Point Nuclear Power Plant Unit No.
3 STEAM GENERATOR:
3E210B EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 ROW COLUMN TUBE WALL PENETRATION ORIGIN LOCATION 42 38 28 HOT LEG TSH
- 1. 3 27 HOT LEG TSH 3.1 39 39 37 HOT LEG 05H
.3 41 42 29 AVB AV2
.0
- 42 43 38 AVB AV2
.0 20 AVB AV3
.0 44 38 HOT LEG TSH 38 '
42 45 23 AVB AV2
.0 34 46 24 AVB AV3
.0 72 27 HOT LEG 02H 36.5 85 26 HOT LEG 02H 36.6 HOT LEG (INLET)
COLD LEG (OUTLET)
- Preventatively Plugged PAGE NIS-BB -7
FORM NIS-BB OWNERS ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As required by t e provisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT:
Turkey Point Nuclear Power Plant Unit No.
3 STEAM GENERATOR:
3E210C EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 ROW COLUMN TUBE WALL PENETRATION ORIGIN LOCATION 27 30 24 AVB AV2 13. 0 34 30 COLD LEG TSC 28.4
- 40 38 35 AVB AV2
.0 30 AVB AV3
.0 27 AVB AV4
.0 39 33 COLD LEG 03C 11 ~ 2 33 39 33 AVB AV1
.0 25 AV3
.0 35 33 AVB AV1
.0 22 AVB AV2
.0 33 43 21 AVB AV3
.0 HOT LEG (INLET)
COLD LEG (OUTLET)
PAGE NIS-BB -8
'I
~
W
~
r'ORN NLS-BB OWNERS ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b he rovisions of the ASME de Rules EDDY CURRENT EXAMINATIONRESULTS PLANT:
Turkey Point Nuclear Power Plant Unit No.
3 STEAM GENERATOR:
3E210C EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 ROW COLUMN TUBE WALL PENETRATION ORIGIN LOCATION 35 43 21 AVB AV1
.0 22 AVB AV2
.0 27 AVB AV3
.0 22 AVB AV4
.0 13 44 27 HOT LEG 02H 51. 2 35 44 27 AVB AV2
.0 28 AVB AV3
.0 35 45 34 AVB AV2
.0 22 AVB AV4
.0 l
30 46 27 AVB AV1
.0 25 AVB AV2
.0 HOT LEG (INLET)
COLD LEG (OUTLET)
PAGE NIS-BB -9
~'JP (I
Pt p
l A
FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As re ired b e
rovisions of the ASME e Rules EDDY CURRENT EXAMINATION RESULTS PLANT:
Turkey Point Nuclear Power Plant Unit No.
3 STEAM GENERATOR:
3E210C EXAMINATION DATES: February 28, 1990 THRU March 13, 1990 ROW COLUMN TUBE WALL PENETRATION ORIGIN LOCATION 21 AVB AV3
.0
- 35 47 22 AVB AV2
.0 39 AVB AV3
.0 30 48 34 AVB AV3
.0 14 53 22 HOT LEG TSH
- 1. 2
- 38 53 34 AVB AV2 39 AVB AV3
.0
- 38 54 22 AVB AV1
.0 36 AVB AV2
.0 20 AVB AV3
.0 HOT LEG (INLET)
COLD LEG (OUTLET)
- Preventatively Plugged PAGE NIS-BB -10