Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20236S092 | 17 July 1998 | Audit Rept,Commitment Mgt for Tva,Sequoyah Nuclear Plants, Units 1 & 2 | Fire Protection Program |
ML20138D189 | 28 February 1997 | Special Project Rept Audit 97-901S, Concerns Resolution Program-Sequoyah Nuclear Plant | |
ML20138D233 | 28 February 1997 | Special Project Rept Audit 97-920S, Concerns Resolution Program-TVA Nuclear, Feb 1997 | |
ML20133F372 | 14 January 1997 | Press Release II-97-08, NRC Staff Proposes $100,000 Fine Against TVA NRC Staff Also Prohibits TVA Executive from Involvement in NRC-Licensed Activities | |
ML20132G874 | 26 December 1996 | Press Release II-96-105, NRC Staff Proposes $100,000 in Fines Against TVA at Sequoyah | |
ML20135D074 | 6 December 1996 | Press Release II-96-100, NRC Staff to Hold Predecisional Enforcement Conference to Discuss Sequoyah Equipment Concerns W/Tva | |
ML20134L301 | 20 November 1996 | Press Release II-96-97, NRC Staff Proposes $50,000 Fine Against TVA at Sequoyah | High Radiation Area Hydrostatic Fire Protection Program Fire Watch Scaffolding |
ML20116J522 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) | Weak link |
ML20116J525 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) | Weak link |
ML20116J536 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force | |
ML20116J539 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force | |
ML20116J544 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force | |
ML20116J541 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force | Weak link |
ML20116J517 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) | Weak link |
ML20116J515 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) | Weak link |
ML20116J509 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force | |
ML20116J505 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force | Weak link |
ML20116J502 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force | |
ML20116J497 | 6 August 1996 | Pressure Locking Evaluation for Required Pullout Force | |
ML20058P132 | 23 December 1993 | Package Containing Answers to Questionnaire Re Employee Concerns Programs | |
ML20065B781 | 18 June 1993 | Degraded Voltage Analysis | |
ML20086H985 | 27 November 1991 | Evaluation of Block Clamps at Welds Near Valves 0-67-1514 & 2-67-1513 | Weak link |
ML20028G836 | 21 August 1990 | Foundation Investigation of ERCW Pumping Station Foundation Cells. | Operating Basis Earthquake |
ML20029A006 | 3 August 1990 | Rev 0 to SQN-00-D052 EPM-AMJ-073190, Fire Hazard Analysis of Unit 2 App R Cables in Boric Acid Tank Area,Elevation 690 Auxiliary Bldg. | Safe Shutdown Boric Acid |
ML20042F253 | 25 April 1990 | Instrument Accuracy Calculation 1LT-63-50,-51,-52 & -53 (RWST Switchover). | |
ML20042F255 | 25 April 1990 | Instrument Accuracy Calculation 1LT-63-176,-177,-178 & -179 (RB Sump Switch). | |
ML20043H043 | 11 April 1990 | Steel Containment Vessel - DBA Analysis Ccts Double Differentiation Question. | Earthquake |
ML20012C629 | 20 February 1990 | Rev 2 to TVA Calculation SQN-SQS2-0097, Probabilistic Analysis Showing Effects of Deleting RHR Autoclosure Interlock. | |
ML20012A303 | 3 January 1990 | Foundation Investigation Evaluation of ERCW Roadway Access Cells a & B. | |
ML20245J078 | 12 July 1989 | Rev 3 to Best Estimate Evaluation of Ice Condenser Basket Weights for Sequoyah Unit 1 Cycle 4, Supporting 890620 Application for Amend to License DPR-77,consisting of Tech Spec Change Request 89-24 | |
ML20154P412 | 17 August 1988 | Rev 1 to Extension of Ice Condenser Weighing Period Based on Predicted Group - Row & Bay Sublimation Rates | |
ML20151A258 | 1 July 1988 | Rev 0 to App R,Cable to Cable Shorts for RCS High/Low Pressure Interfaces | Hot Short Safe Shutdown Fire Watch |
ML20195D667 | 17 June 1988 | Nonproprietary App R Reactivity Calculations | |
ML20235X379 | 16 September 1987 | Rev 1 to SQN-SQS4-0088, Justification for Continued Operation W/Unimplemented Corrective Actions for Moderate Energy Line Breaks | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Condition Adverse to Quality Earthquake |
ML20151M960 | 20 July 1987 | Package of NRC Administered Requalification Exam Results Summary | |
ML20211A082 | 3 October 1986 | Package Consisting of Summary Schedule Suppl & Variance Rept & Capital Project Request Summary | |
ML20203H285 | 28 July 1986 | Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131 | Hydrostatic |
IA-86-445, Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131 | 28 July 1986 | Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131 | Hydrostatic |
ML20134L581 | 18 July 1985 | Package of Operator Exam Results Summary Sheets | |
IA-85-442, Package of Operator Exam Results Summary Sheets | 18 July 1985 | Package of Operator Exam Results Summary Sheets | |
ML20129F483 | 9 May 1985 | Package of Compilations of Results of Operator Licensing & Requalification Exams | |
ML20009A827 | 8 July 1981 | Viewgraphs Entitled TVA Inner Radius U-Bend Program, Presented at 810603 Meeting W/Nrc.Charts,Tables & Addl Info Encl | |
ML19248D340 | 2 August 1979 | Const Deficiency Rept on 790802:chattering of Underfrequency Relay Contacts Caused Auxiliary Relay to Chatter,Delaying Reactor Trip & Cooling Pump Trip Signals.Relay & Design Changes Being Implemented | |
ML19242D160 | 30 July 1979 | Possible RO on 790730 Re Failure to Seismically Qualify or Check Electrical Handholes in Conduit Between Auxiliary Bldg & Pump Station for Flow & Stress During Probable Max Flood | |
ML19242D231 | 27 July 1979 | Notification of Potential Design requirement:3/4-inch Test Lines from 8-inch Low Head Safety Injection Headers Do Not Allow for Acceptable Piping Flexibility | |
ML19247A908 | 17 July 1979 | Insp of Two Safety Injection Sys Accumulator Discharge Valves Revealed Severe Multiple Cracks in Stellite Facing. Notified Vendor,Velan Engineering Co.Possible Generic Implications to Unit 2 & Watts Bar |