|
---|
Category:ARCHIVE RECORDS
MONTHYEARML20236S0921998-07-17017 July 1998 Audit Rept,Commitment Mgt for Tva,Sequoyah Nuclear Plants, Units 1 & 2 ML20138D1891997-02-28028 February 1997 Special Project Rept Audit 97-901S, Concerns Resolution Program-Sequoyah Nuclear Plant ML20138D2331997-02-28028 February 1997 Special Project Rept Audit 97-920S, Concerns Resolution Program-TVA Nuclear, Feb 1997 ML20133F3721997-01-14014 January 1997 Press Release II-97-08, NRC Staff Proposes $100,000 Fine Against TVA NRC Staff Also Prohibits TVA Executive from Involvement in NRC-Licensed Activities ML20132G8741996-12-26026 December 1996 Press Release II-96-105, NRC Staff Proposes $100,000 in Fines Against TVA at Sequoyah ML20135D0741996-12-0606 December 1996 Press Release II-96-100, NRC Staff to Hold Predecisional Enforcement Conference to Discuss Sequoyah Equipment Concerns W/Tva ML20134L3011996-11-20020 November 1996 Press Release II-96-97, NRC Staff Proposes $50,000 Fine Against TVA at Sequoyah ML20116J5221996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) ML20116J5251996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) ML20116J5361996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5391996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5441996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5411996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5171996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) ML20116J5151996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) ML20116J5091996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5051996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5021996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J4971996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20058P1321993-12-23023 December 1993 Package Containing Answers to Questionnaire Re Employee Concerns Programs ML20065B7811993-06-18018 June 1993 Degraded Voltage Analysis ML20086H9851991-11-27027 November 1991 Evaluation of Block Clamps at Welds Near Valves 0-67-1514 & 2-67-1513 ML20028G8361990-08-21021 August 1990 Foundation Investigation of ERCW Pumping Station Foundation Cells. ML20029A0061990-08-0303 August 1990 Rev 0 to SQN-00-D052 EPM-AMJ-073190, Fire Hazard Analysis of Unit 2 App R Cables in Boric Acid Tank Area,Elevation 690 Auxiliary Bldg. ML20042F2531990-04-25025 April 1990 Instrument Accuracy Calculation 1LT-63-50,-51,-52 & -53 (RWST Switchover). ML20042F2551990-04-25025 April 1990 Instrument Accuracy Calculation 1LT-63-176,-177,-178 & -179 (RB Sump Switch). ML20043H0431990-04-11011 April 1990 Steel Containment Vessel - DBA Analysis Ccts Double Differentiation Question. ML20012C6291990-02-20020 February 1990 Rev 2 to TVA Calculation SQN-SQS2-0097, Probabilistic Analysis Showing Effects of Deleting RHR Autoclosure Interlock. ML20012A3031990-01-0303 January 1990 Foundation Investigation Evaluation of ERCW Roadway Access Cells a & B. ML20245J0781989-07-12012 July 1989 Rev 3 to Best Estimate Evaluation of Ice Condenser Basket Weights for Sequoyah Unit 1 Cycle 4, Supporting 890620 Application for Amend to License DPR-77,consisting of Tech Spec Change Request 89-24 ML20154P4121988-08-17017 August 1988 Rev 1 to Extension of Ice Condenser Weighing Period Based on Predicted Group - Row & Bay Sublimation Rates ML20151A2581988-07-0101 July 1988 Rev 0 to App R,Cable to Cable Shorts for RCS High/Low Pressure Interfaces ML20195D6671988-06-17017 June 1988 Nonproprietary App R Reactivity Calculations ML20235X3791987-09-16016 September 1987 Rev 1 to SQN-SQS4-0088, Justification for Continued Operation W/Unimplemented Corrective Actions for Moderate Energy Line Breaks ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20211A0821986-10-0303 October 1986 Package Consisting of Summary Schedule Suppl & Variance Rept & Capital Project Request Summary ML20203H2851986-07-28028 July 1986 Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131 IA-86-445, Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 8201311986-07-28028 July 1986 Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131 ML20134L5811985-07-18018 July 1985 Package of Operator Exam Results Summary Sheets IA-85-442, Package of Operator Exam Results Summary Sheets1985-07-18018 July 1985 Package of Operator Exam Results Summary Sheets ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams ML20009A8271981-07-0808 July 1981 Viewgraphs Entitled TVA Inner Radius U-Bend Program, Presented at 810603 Meeting W/Nrc.Charts,Tables & Addl Info Encl ML19248D3401979-08-0202 August 1979 Const Deficiency Rept on 790802:chattering of Underfrequency Relay Contacts Caused Auxiliary Relay to Chatter,Delaying Reactor Trip & Cooling Pump Trip Signals.Relay & Design Changes Being Implemented ML19242D1601979-07-30030 July 1979 Possible RO on 790730 Re Failure to Seismically Qualify or Check Electrical Handholes in Conduit Between Auxiliary Bldg & Pump Station for Flow & Stress During Probable Max Flood ML19242D2311979-07-27027 July 1979 Notification of Potential Design requirement:3/4-inch Test Lines from 8-inch Low Head Safety Injection Headers Do Not Allow for Acceptable Piping Flexibility ML19247A9081979-07-17017 July 1979 Insp of Two Safety Injection Sys Accumulator Discharge Valves Revealed Severe Multiple Cracks in Stellite Facing. Notified Vendor,Velan Engineering Co.Possible Generic Implications to Unit 2 & Watts Bar 1998-07-17
[Table view] Category:OPERATIONS SUPPORT-CALCULATIONS
MONTHYEARML20116J5441996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J4971996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5021996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5051996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5091996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5151996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) ML20116J5171996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) ML20116J5221996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) ML20116J5251996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force (for Double Disc Split Wedge) ML20116J5361996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5391996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20116J5411996-08-0606 August 1996 Pressure Locking Evaluation for Required Pullout Force ML20065B7811993-06-18018 June 1993 Degraded Voltage Analysis ML20086H9851991-11-27027 November 1991 Evaluation of Block Clamps at Welds Near Valves 0-67-1514 & 2-67-1513 ML20028G8361990-08-21021 August 1990 Foundation Investigation of ERCW Pumping Station Foundation Cells. ML20029A0061990-08-0303 August 1990 Rev 0 to SQN-00-D052 EPM-AMJ-073190, Fire Hazard Analysis of Unit 2 App R Cables in Boric Acid Tank Area,Elevation 690 Auxiliary Bldg. ML20042F2531990-04-25025 April 1990 Instrument Accuracy Calculation 1LT-63-50,-51,-52 & -53 (RWST Switchover). ML20042F2551990-04-25025 April 1990 Instrument Accuracy Calculation 1LT-63-176,-177,-178 & -179 (RB Sump Switch). ML20043H0431990-04-11011 April 1990 Steel Containment Vessel - DBA Analysis Ccts Double Differentiation Question. ML20012C6291990-02-20020 February 1990 Rev 2 to TVA Calculation SQN-SQS2-0097, Probabilistic Analysis Showing Effects of Deleting RHR Autoclosure Interlock. ML20012A3031990-01-0303 January 1990 Foundation Investigation Evaluation of ERCW Roadway Access Cells a & B. ML20245J0781989-07-12012 July 1989 Rev 3 to Best Estimate Evaluation of Ice Condenser Basket Weights for Sequoyah Unit 1 Cycle 4, Supporting 890620 Application for Amend to License DPR-77,consisting of Tech Spec Change Request 89-24 ML20154P4121988-08-17017 August 1988 Rev 1 to Extension of Ice Condenser Weighing Period Based on Predicted Group - Row & Bay Sublimation Rates ML20151A2581988-07-0101 July 1988 Rev 0 to App R,Cable to Cable Shorts for RCS High/Low Pressure Interfaces ML20195D6671988-06-17017 June 1988 Nonproprietary App R Reactivity Calculations ML20235X3791987-09-16016 September 1987 Rev 1 to SQN-SQS4-0088, Justification for Continued Operation W/Unimplemented Corrective Actions for Moderate Energy Line Breaks 1996-08-06
[Table view] |
Text
- - - __ .-
a 2-FCV-63-26 (GL 09-10) Page 1oF1
' MOV Calc No.
PRESSURE LOCKING EVALUATION FOR REQUIRED PULLOUT FORCE (for Double Disc Solit Wedae) !
MOV '2-FCV-63 26" Valve type = DD Shiit Widge
, [j)) = INPUTS VALVE DWG ^ 593 12859 i EPRINP-6516 Calc Meth ARK No.Y 'jySQf[}
VALVE DESIGN DATA theta (A) =) ; e Oldeg EPRI MOV PPP INTERNAL DEslGN INFO, Ref.
u:b 4
? 0.4]
D1 M1 E1~
a= 1.6438 inches ro= 0.625 inches E 3.M22S73FM.25l 1.84375 I
0.625 inches v= 0.3 a= ((D1 + E1)/ 2)/ 2 =
b=
b= M1/ 2 = 0.625 = ro 1 3.6875 in v= Poisson's Ratio = ERTOT (D) Mean Seat Dia (D1+E1)/2 =
Stem Dia = gyss1.625 in (d) seating surfaces friction coef u
10.68 (in)^2 based on Calc method. & EPRI results (S2) Valve Seat Area ((D)^2*Pl/4=
0.4000 (Vf) mu/(cosA + musinA) = 1/2 total valve theta =
l 2.07l(in)^2 disk an0le (St3) Stem Area ((d)^2*Pl/4=
1625 lbs Valve Seat Area Based on :
(PI) Packing Load (Calculated) = D1, E1 Packing Load (Actual, average) = ~ m mago /bs (PI)
PRESSURE and TEMPERATURE DATA Pbon = D' Aa A2735l psi (Pb)
P up = m i 32600 psi
, .. ' u) .20 psi P down = xon s (Pd)
DP = l 2600lpsid l
PRESSURE INDUCED. PRESSURE LOCKING THRUST REQUIREMENT:
THRUST = [ { (Pb - Pu) + (Pb - Pd) ) * {S2} * {Vf) ) - { (ST3) * (Pb) ) + Pl ] + UNWEDGING i
WHERE: Pb = Pressure in valve Bonnet UNWEDGING = lw Ollbs Pu = Pressure upstream of Valve Pd = Pressure downstream of Valve S2 = Valve Seat Area Vf = Valve Friction Factor St3 = Stem Area Pi = Packing load (maximum value)
THRUST = 8213lbs PRESSURE INDUCED. P L - MAXIMUM BONNET PRESSURE @ ACT/ VALVE LIMITING CAP PRESSURE = { A/VLIMTH + (S2
- Vf * (Pu + Pd)) - Pl } / { (2
PRESSURE = 4099 psi hk [- .
9608130254 960806 PDR ADOCK 05000327 P PDR
MOV Calc No. 2-FCV-63-26 (GL 89-10) Page 2cFL PRESSURE LOCKING REQUIREMENT = 8213 lbs A CTUATORNALVE CAPABILITY EVALUATION CALCULATION: 2-FCV-63-26 Actuator Model (SMBLO'[
Motor Start Torque (MT) ^ ' ,15 filbs Overall Gear Ratio (OGR) l 87.2
Pullout Efficiency (PE) 40 %
Application Factor (AF) 0.9 or 1.0 ( s [ly,;fi{
j, Valve Factor (VF) 1.0 or (VF/460)"2 P [0.6656; 375.3VAC h"'O.0'187; Stem Factor (SF)
Max Temperature (Temp) 215 F Loss Percentage (elevated temp) @fD[$% Note 1 !
j Torque Loss Factor = 1-Loss %*(Temp-104)/(356-77) 0.9149 l i
Actuator Torque Capability = (MT
Actuator Thrust Capability = Torque / Stem Factor 17037lbs 0.0187
! Actuator Thrust / Torque Rating f5S661bs E[d500Mfilbs t
! Valve Weak Link Thrust / Torque Rating Q 987[0]!bs SF =
1 932.57 ft!bs 0.0187 Seismic Thrust / Torque Rating fift3E0d]!bs SF =
628.32 filbs 0.0187 Note 1:
Reference:
Limitorque Technical Update 93-03 RESULTS*: PRESSURE LOCKING REQUIREMENT = 8213 lbs ACTUATOR / VALVE LIMITING CAPABILITY = 17037lbs 1 CUT = MOTOR CAP COMMF.NTS:
Rev. Prepared: Checked: /