Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22034A39916 February 2022Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion
ML22034A39716 February 2022Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion
ML22034A39516 February 2022Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion
ML21354A76020 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18
ML21354A74620 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18
ML21354A74920 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18
ML21354A75620 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18
ML21354A75720 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18
ML21354A75920 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18
ML21354A76120 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18
ML21354A76320 December 2021Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18
ML21291A2373 December 2021Proposed Issuance of an Order Approving a License Transfer Application for Which a Hearing Has Been RequestedExemption Request
ML21026A2608 February 2021Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-034Pandemic
COVID-19
Dissimilar Metal Weld
ML21021A28321 January 2021FAQ 20-06: GGNS Turbine Controls Upgrade Scrams One-Time ExemptionTornado Missile Protection
Pandemic
Coronavirus
Power change
ML21021A11421 January 2021FAQ 20-05 River Bend Uswc - Proposed NRC Response - Final
ML21028A38722 December 2020FAQ 20-06 GGNS Scram - Tentatively ApprovedTornado Missile Protection
Pandemic
Coronavirus
Power change
ML21012A39810 December 2020Enc 1 - Grand Gulf Nuclear Station - Regulatory Conference (Participant List) Dec '20 - (1850183)
ML20329A14520 November 2020Terrapower'S QAPD Preliminary Questions
ML21028A3479 October 2020FAQ 20-05 River Bend Uswc - Tentatively Approved
ML20288A4049 October 2020FAQ 20-05: RBS Unplanned Scram May 2019
ML20135G72014 May 2020Final ASP Analysis - ANO 1 (LER 313-93-003)
ML20055C80320 February 2020Information Request February 20, 2020 River Bend Station NRC Inspection Report 05000458/2020412
ML19009A3228 January 2019NRC-2017-000688 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed (Arkansas Nuclear One, Units 1 and 2, FHRR - Released Set)Ultimate heat sink
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
ML18354A42920 December 2018Superseded by Amendment #12 Re Component Testing
ML18354A42820 December 2018Superseded by Amendment #14Boric Acid
ML18354A42620 December 2018Superseded Pages Amendment #16Earthquake
ML18228A50115 August 2018NEI 99-02 FAQ 18-04 ANO Uswc Rev 1 W/Proposed NRC ResponseExemption Request
ML18232A23320 June 2018FAQ 18-04 ANO-1 Uswc Rev 1 Wapproved Final NRC Response, August 20, 2018Exemption Request
ML18135A10715 May 2018RBS Draft Response (RAI 4.3.1-2a_Class 1 Fatigue w-header-footer-watermark_received on 051318
ML18008A2973 January 2018ANO Timeline for Remaining Key Milestones
ML18002A2363 January 2018Public Notice of Application for Exigent Amendment, Request for Allowance to Exclude Exercise of Control Element Assembly 4 Related to Surveillance Requirement 4.1.3.1.2 for Remainder of Cycle 26Shutdown Margin
ML17290A04917 October 2017Discussion Topics for October 19, 2017 Category 1 Public Meeting Regarding Fluence Methodology
ML17235B14823 August 2017U.S. Nuclear Regulatory Commission - Tornado Missile Risk Evaluator (TMRE) Methodology Topics and Methodology FeedbackProbabilistic Risk Assessment
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Large early release frequency
Tornado Missile Risk Evaluator
ML17207A09626 July 2017FAQ 17-01: Grand Gulf June 2016 Power Change (Final NRC Response)Power change
ML17166A4974 May 2017Teleconference, Meeting Material for Steam Generator Tube Inspection Tube Inspection Discussion During Palisades 2017(1R25) Outage (Preliminary Information)
ML17041A17310 February 2017Further Discussion Topics for Public Meeting to Discuss License Amendment Request Regarding the Revision of TS Table 4.3-2 for Waterford Steam Electric Station, Unit 3
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 201520 December 2016Entergy - Form 10-K for Fiscal Year Ended December 31, 2015High winds
Enforcement Discretion
Incorporated by reference
Aging Management
Earthquake
Environmental Justice
ML16327A5302 December 2016Enclosure 1 - Mitigating Strategies Flood Hazard Information Tables for Interim Staff Response (Redacted Version)
ML16285A33112 October 2016ROP PI Frequently Asked Questions (Faqs): 14-09
ML16285A32612 October 2016ROP PI Frequently Asked Questions (Faqs): 14-03
ML16225A54012 August 2016U.S. Nuclear Regulatory Commission Staff Review of Resolutions of Arkansas Nuclear One Internal Events and Fire PRA Facts and Observations (F&Os)Probabilistic Risk Assessment
ML16132A17510 May 2016E-Mail: Palisades Nuclear Plant - Request for Information for Onsite Review 2016 002 (Msh)
ML17080A4785 May 2016EA-15-039;Confirmatory Order Consent and Hearing Waiver Form - Palisades
ML16061A37229 February 2016NFPA 805 Transition FAQ 14-0073 Revision 1Probabilistic Risk Assessment
Fire Protection Program
ML15344A45214 December 201550 54(p) Review for Grand Gulf
ML15363A3746 October 2015Internal Events and Internal Flooding PRA and Fire PRA NFPA 805 Record of ReviewSafe Shutdown
Fire Barrier
Internal Flooding
ML15219A6674 September 2015Tables 1 and 2
ML15162A08411 June 2015GTCC Disposals at the Barnwell Low-Level Radioactive Waste Facility from 1998 to Present
ML15028A52728 January 2015Attachment 1 - Response to Request for Additional Information Regarding the License Amendment Request for Approval of Palisades Nuclear Plant 10 CFR Appendix G Equivalent Margins Analysis
ML15014A15314 January 2015Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process