ML22112A006 | 20 April 2022 | (Public Version) Oconee SLRA - Final RCI 3.5.2.2.2.6-L | Aging Management License Renewal Subsequent License Renewal |
ML21323A115 | 23 November 2021 | Subsequent License Renewal Environmental Review Requests for Additional and Subsequent Information - Enclosure | License Renewal Subsequent License Renewal Environmental Justice |
ML18060A028 | 28 February 2018 | Noncurrence Process - Alternative to Codes and Standards | Unanalyzed Condition Arc flash Non-Concurrence Process |
ML16055A188 | 15 January 2016 | FOIA/PA-2016-0071 - Resp 3 - Interim, Continuing to Process Request. Part 2 of 2 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Post Accident Monitoring Emergency Lighting Operability Determination Commercial Grade Power change |
ML16055A187 | 15 January 2016 | FOIA/PA-2016-0071 - Resp 3 - Interim, Continuing to Process Request. Part 1 of 2 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Post Accident Monitoring Emergency Lighting Operability Determination Commercial Grade Power change |
ML15224A779 | 7 August 2015 | FOIA/PA-2015-0393 - Resp 2 - Final, Part 1 of 1 | Safe Shutdown Offsite Circuit Backfit Manual Operator Action |
ML15162A084 | 11 June 2015 | GTCC Disposals at the Barnwell Low-Level Radioactive Waste Facility from 1998 to Present | |
ML14135A408 | 7 May 2014 | FOIA/PA-2013-0213 - Resp 3 - Final, Group Letter D. Part 1 of 1 | Hot Short Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Slow transfer Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Temporary Modification Cyber Security FLEX B.5.b Significance Determination Process Design basis earthquake Operability Determination TORMIS License Renewal Earthquake Turbine Missile Pressure Boundary Leakage Preliminary White Finding Fire Protection Program Early Warning Fire Detection Backfit Eddy-Current Testing |
ML14058A082 | 4 February 2014 | Questions and Answers Related to the Oconee External Flooding Issue | Earthquake |
ML14058A052 | 4 February 2014 | Use of FERC Inundation Calculation Parameters | Earthquake |
ML14058A050 | 4 February 2014 | Questions and Answers Related to Oconee Flood Barrier | |
ML14058A049 | 4 February 2014 | Site Adequate Protection Backfit Documented Evaluation | Safe Shutdown Earthquake Backfit |
ML14058A021 | 4 February 2014 | Request for Opinion on the Safe Shutdown Facility Added to the License Basis for the Oconee Units in an SER | Safe Shutdown |
ML14058A020 | 4 February 2014 | Nancy Ssf Flooding URI Number 1 | Mission time Significance Determination Process Foreign Material Exclusion Operability Assessment |
ML14058A019 | 4 February 2014 | TIA, Answers to Questions in Relation to Licensing Basis for Flooding for the Safe Shutdown Facility at Oconee Station | Safe Shutdown Probabilistic Risk Assessment |
ML14058A015 | 4 February 2014 | Site Adequate Protection Backfit Documented Evaluation | Internal Flooding B.5.b Significance Determination Process Earthquake Backfit Manual Operator Action |
ML14049A287 | 28 August 2013 | Meeting Feedback Form Meeting No. 20140354 | |
ML16070A288 | 24 April 2013 | Jocassee and Keowee Dams, Breach Parameter Review, Dated April 24, 2013 (Redacted) | Earthquake |
ML13240A016 | 6 March 2013 | Report, Enclosure Oconee Nuclear Station Flooding Hazard Reevaluation Report | Safe Shutdown Probabilistic Risk Assessment B.5.b Fukushima Dai-Ichi Earthquake |
ML13052A785 | 26 February 2013 | Flood Licensing Basis Evaluation Open Items | Backfit |
ML13056A105 | 6 February 2013 | Comparison of Approaches for Calculating a Jocassee Dam Failure Frequency | Safe Shutdown Probabilistic Risk Assessment Significance Determination Process |
ML13052A780 | 6 February 2013 | Options for Revising Oconee Flood CAL Due Dates | |
ML13052A781 | 6 February 2013 | Timeline - Summary of Events | Backfit |
ML13052A783 | 6 February 2013 | Draft NRC Information Notice on Dam Failure Frequency in Probabilistic Risk Assessments | Ultimate heat sink Probabilistic Risk Assessment Earthquake |
ML13052A787 | 6 February 2013 | Justification for Continued Operation of Oconee Nuclear Station | Earthquake |
ML13056A100 | 6 February 2013 | Resolution of Oconee Flooding Issue | |
ML13052A786 | 6 February 2013 | Jocassee Dame Failure Frequency Components | Earthquake |
ML12121A638 | 30 April 2012 | Response to Nuclear Regulatory Commission Standard Steam Generator Questions for Oconee Unit 3 | Stress corrosion cracking |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML12003A063 | 16 December 2011 | Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 2 of 6 | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Ultimate heat sink Tornado Missile Internal Flooding Aging Management Flow Accelerated Corrosion TORMIS Battery sizing Earthquake Commercial Grade GOTHIC |
ML12003A067 | 16 December 2011 | Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 4 of 6 | |
ML12003A068 | 16 December 2011 | Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 5 of 6 | |
ML12003A069 | 16 December 2011 | Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 6 of 6 | |
ML113140613 | 1 November 2011 | Enclosure 3 - Regulatory Enforcement Conference - Resubmittal of Supplement | Safe Shutdown Time of Discovery Mission time Significance Determination Process |
ML11279A253 | 6 October 2011 | NRC Pre-submittal Meeting - Proposed Tornado Mitigation Flowchart Revision 6 Oconee Nuclear Station, Units 1, 2, and 3 | |
ML11279A252 | 6 October 2011 | NRC Pre-submittal Meeting- Proposed Turbine Building HELB Mitigation Flow Chart Revision 5 Oconee Nuclear Station, Units 1, 2, and 3 | |
ML110190749 | 18 January 2011 | Enclosure 3 - List of Attendees | |
ML103510379 | 17 December 2010 | NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 1 | Hot Short Safe Shutdown Shutdown Margin Fire Barrier Operator Manual Action Multiple Spurious Operation Thermoset Large early release frequency Fire Protection Program |
ML102640458 | 13 September 2010 | Enclosure 2 - Redacted Version of Request for Additional Information Re the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) | Hot Short Safe Shutdown Shutdown Margin Fire Barrier Post Accident Monitoring Multiple Spurious Operation Emergency Lighting Thermoset Large early release frequency Fire Protection Program Fire Watch Scaffolding |
ML103510012 | 19 August 2010 | NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 0 (Updated) | Hot Short Safe Shutdown Shutdown Margin Fire Barrier Operator Manual Action Multiple Spurious Operation Thermoset Large early release frequency License Renewal Fire Protection Program |
ML102370581 | 19 August 2010 | NFPA 805 Transition Pilot Plant FAQ 08-0054 | Hot Short Safe Shutdown Shutdown Margin Fire Barrier Operator Manual Action NFPA 805 Multiple Spurious Operation Thermoset Large early release frequency Fire Protection Program |
ML101930198 | 9 June 2010 | Onsite Ground/Surface Water Monitoring Questionnaire for Oconee Nuclear Station | |
ML14058A061 | 13 April 2010 | Draft Oconee Nuclear Site Adequate Protection Backfit Documented Evaluation | Safe Shutdown Internal Flooding B.5.b Significance Determination Process Earthquake Backfit |
ML101930460 | 25 March 2010 | List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants | |
ML101930544 | 8 February 2010 | Ground Water Communication Supplemental Information Questions and Answers | Exit Sign |
ML110060666 | 9 October 2009 | Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 2 of 14 | |
ML092710344 | 25 September 2009 | Site Visit Observation on 09/25/2009 by Joel Munday for Oconee | Safe Shutdown |
ML110040435 | 15 September 2009 | Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/15/2009 | |
ML110030933 | 13 July 2009 | Congressional Staff Briefing: Monday July 13, 2009, 3:30 Pm, Room 2108 Rayburn Bldg; Topic: Follow-Up Questions Regarding Chairman'S June 17, 2009 Response Regarding a IP2 Buried Pipe Leak | Aging Management |
ML090900433 | 6 April 2009 | Enclosure 2 - Oconee Nuclear Station Regulatory Audit - Documents Reviewed | Safe Shutdown |