MONTHYEARML22112A0062022-04-20020 April 2022 (Public Version) Oconee SLRA - Final RCI 3.5.2.2.2.6-L ML21323A1152021-11-23023 November 2021 Subsequent License Renewal Environmental Review Requests for Additional and Subsequent Information - Enclosure ML18060A0282018-02-28028 February 2018 Noncurrence Process - Alternative to Codes and Standards ML16055A1882016-01-15015 January 2016 FOIA/PA-2016-0071 - Resp 3 - Interim, Continuing to Process Request. Part 2 of 2 ML16055A1872016-01-15015 January 2016 FOIA/PA-2016-0071 - Resp 3 - Interim, Continuing to Process Request. Part 1 of 2 ML15224A7792015-08-0707 August 2015 FOIA/PA-2015-0393 - Resp 2 - Final, Part 1 of 1 ML15162A0842015-06-11011 June 2015 GTCC Disposals at the Barnwell Low-Level Radioactive Waste Facility from 1998 to Present ML14135A4082014-05-0707 May 2014 FOIA/PA-2013-0213 - Resp 3 - Final, Group Letter D. Part 1 of 1 ML14058A0822014-02-0404 February 2014 Questions and Answers Related to the Oconee External Flooding Issue ML14058A0522014-02-0404 February 2014 Use of FERC Inundation Calculation Parameters ML14058A0502014-02-0404 February 2014 Questions and Answers Related to Oconee Flood Barrier ML14058A0492014-02-0404 February 2014 Site Adequate Protection Backfit Documented Evaluation ML14058A0212014-02-0404 February 2014 Request for Opinion on the Safe Shutdown Facility Added to the License Basis for the Oconee Units in an SER ML14058A0202014-02-0404 February 2014 Nancy Ssf Flooding URI Number 1 ML14058A0192014-02-0404 February 2014 TIA, Answers to Questions in Relation to Licensing Basis for Flooding for the Safe Shutdown Facility at Oconee Station ML14058A0152014-02-0404 February 2014 Site Adequate Protection Backfit Documented Evaluation ML14049A2872013-08-28028 August 2013 Meeting Feedback Form Meeting No. 20140354 ML16070A2882013-04-24024 April 2013 Jocassee and Keowee Dams, Breach Parameter Review, Dated April 24, 2013 (Redacted) ML13240A0162013-03-0606 March 2013 Report, Enclosure Oconee Nuclear Station Flooding Hazard Reevaluation Report ML13052A7852013-02-26026 February 2013 Flood Licensing Basis Evaluation Open Items ML13056A1052013-02-0606 February 2013 Comparison of Approaches for Calculating a Jocassee Dam Failure Frequency ML13052A7802013-02-0606 February 2013 Options for Revising Oconee Flood CAL Due Dates ML13052A7812013-02-0606 February 2013 Timeline - Summary of Events ML13052A7832013-02-0606 February 2013 Draft NRC Information Notice on Dam Failure Frequency in Probabilistic Risk Assessments ML13052A7872013-02-0606 February 2013 Justification for Continued Operation of Oconee Nuclear Station ML13056A1002013-02-0606 February 2013 Resolution of Oconee Flooding Issue ML13052A7862013-02-0606 February 2013 Jocassee Dame Failure Frequency Components ML12121A6382012-04-30030 April 2012 Response to Nuclear Regulatory Commission Standard Steam Generator Questions for Oconee Unit 3 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12003A0632011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 2 of 6 ML12003A0672011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 4 of 6 ML12003A0682011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 5 of 6 ML12003A0692011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 6 of 6 ML1131406132011-11-0101 November 2011 Enclosure 3 - Regulatory Enforcement Conference - Resubmittal of Supplement ML11279A2532011-10-0606 October 2011 NRC Pre-submittal Meeting - Proposed Tornado Mitigation Flowchart Revision 6 Oconee Nuclear Station, Units 1, 2, and 3 ML11279A2522011-10-0606 October 2011 NRC Pre-submittal Meeting- Proposed Turbine Building HELB Mitigation Flow Chart Revision 5 Oconee Nuclear Station, Units 1, 2, and 3 ML1101907492011-01-18018 January 2011 Enclosure 3 - List of Attendees ML1035103792010-12-17017 December 2010 NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 1 ML1026404582010-09-13013 September 2010 Enclosure 2 - Redacted Version of Request for Additional Information Re the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) ML1035100122010-08-19019 August 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 0 (Updated) ML1023705812010-08-19019 August 2010 NFPA 805 Transition Pilot Plant FAQ 08-0054 ML1019301982010-06-0909 June 2010 Onsite Ground/Surface Water Monitoring Questionnaire for Oconee Nuclear Station ML14058A0612010-04-13013 April 2010 Draft Oconee Nuclear Site Adequate Protection Backfit Documented Evaluation ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML1019305442010-02-0808 February 2010 Ground Water Communication Supplemental Information Questions and Answers ML1100606662009-10-0909 October 2009 Photographs of Ssf Asw Leak and Piping Replacement Project Taken Between August 20, 2009 and October 9, 2009, by Oconee Resident Inspectors. Part 2 of 14 ML0927103442009-09-25025 September 2009 Site Visit Observation on 09/25/2009 by Joel Munday for Oconee ML1100404352009-09-15015 September 2009 Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/15/2009 ML1100309332009-07-13013 July 2009 Congressional Staff Briefing: Monday July 13, 2009, 3:30 Pm, Room 2108 Rayburn Bldg; Topic: Follow-Up Questions Regarding Chairman'S June 17, 2009 Response Regarding a IP2 Buried Pipe Leak ML0909004332009-04-0606 April 2009 Enclosure 2 - Oconee Nuclear Station Regulatory Audit - Documents Reviewed 2022-04-20
[Table view] |
Text
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (ONS)
SUBSEQUENT LICENSE RENEWAL APPLICATION (SLRA)
SAFETY REVIEW REQUESTS FOR CONFIRMATION OF INFORMATION RCI 3.5.2.2.2.6-L Regulatory Basis:
Part 54 of Title 10 of the Code of Federal Regulations (10 CFR), Requirements for Renewal of Operating Licenses for Nuclear Power Plants, is designed to elicit application information that will enable the U.S. Nuclear Regulatory Commission (NRC) staff to perform an adequate safety review and the Commission to make the necessary findings. Reliability of application information is important and advanced by requirements that license applications be submitted in writing under oath or affirmation and that information provided to the NRC by a license renewal applicant or required to be maintained by NRC regulations be complete and accurate in all material respects. Information that must be submitted in writing under oath or affirmation includes the technical information required under 10 CFR 54.21(a) related to assessment of the aging effects on structures, systems, and components subject to an aging management review.
Thus, both the general submission requirements for license renewal applications and the specific technical application information requirements require that submission of information material to NRCs safety findings (see 10 CFR 54.29 standards for issuance of a renewed license) be submitted by an applicant as part of the application.
Background:
By letter dated June 7, 2021 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML21158A193), as supplemented by letters dated October 22, 2021 (ADAMS Accession No. ML21295A035), October 28, 2021 (ADAMS Accession No. ML21302A208), November 11, 2021 (ADAMS Accession No. ML21315A012),
December 2, 2021 (ADAMS Accession No. ML21336A001), December 15, 2021 (ADAMS Accession No. ML21349A005), December 17, 2021 (ADAMS Accession No. ML21351A000),
January 7, 2022 (ADAMS Accession No. ML22010A129), January 21, 2022 (ADAMS Accession No. ML22021A000), February 14, 2022 (ADAMS Accession No. ML22045A021), February 21, 2022 (ADAMS Accession No. ML22052A002), March 22, 2022 (ADAMS Accession No. ML22081A027), and March 31, 2022 (ADAMS Accession No. ML22090A046), Duke Energy Carolinas, LLC (Duke Energy) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55 for Oconee Nuclear Station (ONS), Units 1, 2, and 3. Duke Energy submitted the application pursuant to 10 CFR Parts 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, for subsequent license renewal.
Request:
To the best of the staff's knowledge, this information is not on the docket. Any information used to reach a conclusion in the SER must be included on the docket by the applicant. We request that you submit confirmation that the information gathered from the documents and listed below is correct or provide the associated corrected information.
1
Requests for Confirmation of Information (RCIs)
RCI No. Description Duke Energys
Response
3.5.2.2.2.6-L The response to RAI 3.5.2.2.2.2-3 states, ((
)) The response to RAI 3.5.2.2.2.6-4 states, a bounding source term for Oconee was used to determine the gamma dose at the inside surface of the biological shield wall.
((
))