Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-24-046, 10 CFR 50.46 Annual Report6 May 202410 CFR 50.46 Annual ReportGNF3
RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies13 July 2022Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality MethodologiesEarthquake
Fire Protection Program
Affidavit
GNF3
Water rod
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits30 June 2022Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air SuitsMururoa
RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel20 January 2022Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome FuelAnticipated operational occurrence
Post Accident Monitoring
Fuel cladding
Affidavit
GNF3
SVP-21-041, Regulatory Commitment Change Summary Report15 July 2021Regulatory Commitment Change Summary Report
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping4 January 2021Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingNondestructive Examination
ML20303A17523 October 2020Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting
SVP-20-074, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report8 October 2020Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation ReportPost Accident Monitoring
RS-20-086, Renewed Facility Operating License Nos. DPR-29 and DPR-3024 September 2020Renewed Facility Operating License Nos. DPR-29 and DPR-30Exemption Request
Pandemic
Coronavirus
COVID-19
ML19168A19629 August 2019Staff Assessment of Flood Hazard Integrated AssessmentSafe Shutdown
Unanalyzed Condition
High winds
Ultimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
Backfit
RS-19-049, Submittal of 10 CFR 50.46 Annual Report2 May 2019Submittal of 10 CFR 50.46 Annual Report
ML19064B3705 March 2019Enclosure a - QDC-7500-M-2341, Revision 0, Quad Cities Units 1 & 2 Secondary Containment Drawdown Analysis.Stroke time
GOTHIC
Power Uprate
ML19064B3715 March 2019Enclosure B - QDC-0000-N-1481, Revision 3, Quad Cities Units 1 & 2 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis.
SVP-19-002, Submittal of 10 CFR 50.59, 10 CFR 72.48 Summary Report4 January 2019Submittal of 10 CFR 50.59, 10 CFR 72.48 Summary Report
RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)14 August 2018Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Safe Shutdown
High winds
Ultimate heat sink
Mission time
Time to boil
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Emergency Lighting
Functionality Assessment
FLEX
B.5.b
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Time Critical Operator Action
Battery sizing
Flood Hazard Mitigation Strategies Assessment
Hardened vent
Fuel cladding
Unidentified leakage
RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)14 August 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)High winds
Tornado Missile
FLEX
Design basis earthquake
Feedwater Heater
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Battery sizing
Hardened vent
GOTHIC
RS-18-048, Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.2 May 2018Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.
SVP-17-046, Regulatory Commitment Change Summary Report6 July 2017Regulatory Commitment Change Summary Report
ML16271A32431 October 2016Technical Review Documentation for Flooding Hazard Reevaluation of Quad Cities Nuclear Power Station, Units 1 and 2Fukushima Dai-Ichi
RS-16-044, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..19 February 2016High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML15309A49310 February 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task ForceSafe Shutdown Earthquake
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
Power Uprate
ML15251A38431 August 2015Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary)Anticipated operational occurrence
Finite Element Analysis
SVP-15-052, Submittal of Regulatory Commitment Change Summary Report8 July 2015Submittal of Regulatory Commitment Change Summary Report
RS-15-085, Provides Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentaiton (Order Number EA-12-051)7 May 2015Provides Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentaiton (Order Number EA-12-051)Spent Fuel Pool Instrumentation
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
SVP-14-057, Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities1 August 2014Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14101A2287 April 2014Holtec International Report No. HI-2125245, Revision 5, Licensing Report for Quad Cities Criticality Analysis for Inserts.Fuel cladding
Power Uprate
RS-14-072, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights..31 March 2014Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights..Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Seismic Walkdown Report
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.19 December 2013Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.Safe Shutdown
Reactor Vessel Water Level
Mission time
Stroke time
Post Accident Monitoring
Feedwater Heater
Scram Discharge Volume
MELLLA
Affidavit
ML13317A95720 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Quad Cities Nuclear Power Station, TAC Nos.: MF1048 and MF1049Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
Hardened vent
GOTHIC
Unidentified leakage
ML13199A03816 July 2013Attachment 5 - Holtec International Report No. HI-2125245, Revision 2, Licensing Report for Quad Cities Criticality Analysis for Inserts - Non Proprietary VersionFuel cladding
Power Uprate
IR 05000456/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000289/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML13008A21931 January 2013U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000454/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000461/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000373/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000352/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
SVP-13-001, Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 20124 January 2013Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 2012Half scram
Open Phase Condition
ML12361A08731 October 2012Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 5 of 15Seismic Walkdown Report
ML12361A08631 October 2012Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 4 of 15
ML12361A08931 October 2012Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 6 of 15Seismic Walkdown Report
ML12361A09031 October 2012Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 7 of 15
ML12361A09131 October 2012Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 8 of 15