RS-14-151, Braidwood, Units 1 and 2 - Attachment 1, Kld TR-635, Rev. 0, Development of Evacuation Time Estimates. Part 3 of 4

From kanterella
Jump to navigation Jump to search
Braidwood, Units 1 and 2 - Attachment 1, Kld TR-635, Rev. 0, Development of Evacuation Time Estimates. Part 3 of 4
ML14141A051
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/28/2014
From:
KLD Engineering, PC
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards
Shared Package
ML14141A046 List:
References
RS-14-151 KLD TR-635, Rev. 0
Download: ML14141A051 (42)


Text

APPENDIX H Evacuation Regions H. EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i) and maps of all Evacuation Regions (Figure H-1 through Figure H-38). The percentages presented in Table H-1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

Braidwood Generating Station Evacuation Time Estimate H-1 KLD Engineering, P.C.Rev. 0 Table H-1. Percent of Sub-area Population Evacuating for Each Region (Regions ROI-R25)Region R04 RO5 R06 R07 R08 R09 RIO R11 R17 Diectdion Toward: 1 2 3 4 NNW, N 20%20 NNE, NE, 20%ENE E 20%20 ESE, SE 20% 20 SSE 20%20 2%SSSW 20%20 2%SW, WSW 20%20 2%W 20%20 2%WNW. NW 2n0 7n 2n Sub-area 5 6 7 8 9 1 10 1 11 1 12 13 14 15 16 20% 20% 20% 20%20% 220% j 20% 20%20% 20% 20% 20% 20% 20%20% 20% 20% 20% 20% 20%20% 20% 20% 20% 20% 20%20% 20% 20% 20% 20% 20%20% 20%20% 20%20%20%20%20%20%20%20%20%20%20%20%20%o i 20%20%20%20%t20% 20%o 20%o 0% 20%20% 20%20% *20 20%20%20%20%20%20% 20% 20%20% 20%20% 20%___ t I +20% I 20%A 20% 1 7n-/. I 7n0% I ?nl 0/. I -)n/.Region R13 R14 R15 1 2 3 Methodj 20% 20%:2se:ctor 0.approach sector 0%20% 20%approach 2 sector Sub-area 4 5 6 17 18 9 1 10 1 11 1 12 20%20%20%20%20%20%20% 20% 20%20% 20%2% 120% 20%%20%20%20%20% 1 20%20% 1 20%13 14 15 20%0 20%20%11 20% 20%16 20%20%i i-20%20% 20% 20% 20% 20% 20%wina Sub-area Direction Toward: 1 2 3 4 5 68 91 3I W 0 20% 20% 20% 20%NNE, NE, 20% 20% 20% 20%ENE E, ESE, SE 20 0%2% 0 SSE20 20202%SSW20 20202%SW, WSW202%2 WNW, NW20%NNW 20% 20% 20% 20%Sub-area(s)

Shelter-in-Place Braidwood Generating Station Evacuation Time Estimate H-2 KLD Engineering, P.C.Rev. 0 Stage Evauaio -.-il Radiu Evcats thnEaut.on idt ie Region R26 R27 R28 R29 R30 R31 R32 R33 R34 Toward SWl WSW20% 20 20%E 0 20% 20%WN W 20% 20% 20%Sub-area 20% 2oi2o% 20%20% 20% 20%13 14 15 16 20% 20% 120%120% 1 20% 1 20% 120%20%2 30% 0o 0 20% 20!20%20% 20% 20% 20% 20% 20%20% 20% 20% 20% 20% 20%20% 20% j20% j20% 20% j20%20%20%20%20%20%20%20%20%20%20%20%2n%20%20%20%20%20% 20% 0 20% 20%12%20% 20%20%20%20%20%20% 1 20% I 20%20%20%A 20%20%A I 20" I 20%2n% I ?n-1 I 2n% I -)n-1 I n/Region R36 R37 R38 Method 1 2 3 2 sector approach 20% 205 2 sector 0 approach 20% 205 2 sector Sub-area 4 5 6 17 18 20% 1 20%20%20%20%20%L20% 20% 20%20% ' 20%20% 20% 20%l 209 Sub-area(s)

Shelter-in-Place Braidwood Generating Station Evacuation Time Estimate H-3 KLD Engineering, P.C.Rev. 0 Figure H-1. Region R01 Braidwood Generating Station Evacuation Time Estimate H-4 KLD Engineering, P.C.Rev. 0 Figure H-2. Region R02 Braidwood Generating Station Evacuation Time Estimate H-5 KLD Engineering, P.C.Rev. 0 Figure H-3. Region R03 Braidwood Generating Station Evacuation Time Estimate H-6 KLD Engineering, P.C.Rev. 0 Figure H-4. Region R04 Braidwood Generating Station Evacuation Time Estimate H-7 KLD Engineering, P.C.Rev. 0 Figure H-5. Region ROS Braidwood Generating Station Evacuation Time Estimate H-8 KLD Engineering, P.C.Rev. 0 Figure H-6. Region R06 Braidwood Generating Station Evacuation Time Estimate H-9 KLD Engineering, P.C.Rev. 0 Figure H-7. Region R07 Braidwood Generating Station Evacuation Time Estimate H-10 KLD Engineering, P.C.Rev. 0 Figure H-B. Region R08 H-li KLD Engineering, P.C.Braidwood Generating Station Evacuation Time Estimate H-11 KLD Engineering, P.C.Rev. 0 Figure H-9. Region R09 Braidwood Generating Station Evacuation Time Estimate H-12 KLD Engineering, P.C.Rev. 0 Figure H-10. Region RIO Braidwood Generating Station Evacuation Time Estimate H-13 KLD Engineering, P.C.Rev. 0 Figure H-11. Region Rll Braidwood Generating Station Evacuation Time Estimate H-14 KLD Engineering, P.C.Rev. 0 Figure H-12. Region R12 H-15 KLD Engineering, P.C.Braidwood Generating Station Evacuation Time Estimate H-15 KLD Engineering, P.C.Rev. 0 Figure H-13. Region R13 Braidwood Generating Station Evacuation Time Estimate H-16 KLD Engineering, P.C.Rev. 0 Figure H-14. Region R14 Braidwood Generating Station Evacuation Time Estimate H-17 KLD Engineering, P.C.Rev. 0 Figure H-15. Region R15 Braidwood Generating Station Evacuation Time Estimate H-18 KLD Engineering, P.C.Rev. 0 Figure H-16. Region R16 Braidwood Generating Station Evacuation Time Estimate H-19 KLD Engineering, P.C.Rev. 0 Figure H-17. Region R17 Braidwood Generating Station Evacuation Time Estimate H-20 KLD Engineering, P.C.Rev. 0 Figure H-18. Region R18 Braidwood Generating Station Evacuation Time Estimate H-21 KLD Engineering, P.C.Rev. 0 Figure H-19. Region R19 Braidwood Generating Station Evacuation Time Estimate H-22 KLD Engineering, P.C.Rev. 0 Figure H-20. Region R20 Braidwood Generating Station Evacuation Time Estimate H-23 KLD Engineering, P.C.Rev. 0 Figure H-21. Region R21 Braidwood Generating Station Evacuation Time Estimate H-24 KLD Engineering, P.C.Rev. 0 Figure H-22. Region R22 KLD Engineering, P.C.Braidwood Generating Station Evacuation Time Estimate H-25 KLD Engineering, P.C.Rev. 0 Figure H-23. Region R23 Braidwood Generating Station Evacuation Time Estimate H-26 KLD Engineering, P.C.Rev. 0 Figure H-24. Region R24 Braidwood Generating Station Evacuation Time Estimate H-27 KLD Engineering, P.C.Rev. 0 Figure H-25. Region R25 Braidwood Generating Station Evacuation Time Estimate H-28 KLD Engineering, P.C.Rev. 0 Figure H-26. Region R26 Braidwood Generating Station Evacuation Time Estimate H-29 KLD Engineering, P.C.Rev. 0 Figure H-27. Region R27 Braidwood Generating Station Evacuation Time Estimate H-30 KLD Engineering, P.C.Rev. 0 Figure H-28. Region R28 Braidwood Generating Station Evacuation Time Estimate H-31 KLD Engineering, P.C.Rev. 0 Figure H-29. Region R29 Braidwood Generating Station Evacuation Time Estimate H-32 KLD Engineering, P.C.Rev. 0 Figure H-30. Region R30 Braidwood Generating Station Evacuation Time Estimate H-33 KLD Engineering, P.C.Rev. 0 Figure H-31. Region R31 Braidwood Generating Station Evacuation Time Estimate H-34 KLD Engineering, P.C.Rev. 0 Figure H-32. Region R32 Braidwood Generating Station Evacuation Time Estimate H-35 KLD Engineering, P.C.Rev. 0 Figure H-33. Region R33 Braidwood Generating Station Evacuation Time Estimate H-36 KLD Engineering, P.C.Rev. 0 Figure H-34. Region R34 Braidwood Generating Station Evacuation Time Estimate H-37 KLD Engineering, P.C.Rev. 0 Figure H-35. Region R35 Braidwood Generating Station Evacuation Time Estimate H-38 KLD Engineering, P.C.Rev. 0 Figure H-36. Region R36 Braidwood Generating Station Evacuation Time Estimate H-39 KLD Engineering, P.C.Rev. 0 Figure H-37. Region R37 Braidwood Generating Station Evacuation Time Estimate H-40 KLD Engineering, P.C.Rev. 0 Figure H-38. Region R38 Braidwood Generating Station Evacuation Time Estimate H-41 KLD Engineering, P.C.Rev. 0