RS-14-151, Attachment 5, Kld TR-636, Rev. 0, Development of Evacuation Time Estimates. Part 4 of 5

From kanterella
(Redirected from RS-14-151)
Jump to navigation Jump to search
Attachment 5, Kld TR-636, Rev. 0, Development of Evacuation Time Estimates. Part 4 of 5
ML14141A068
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/18/2014
From:
KLD Engineering, PC
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14141A046 List:
References
RS-14-151 KLD TR-636, Rev. 0
Download: ML14141A068 (39)


Text

APPENDIX H Evacuation Regions

H. EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-1 through Table H-3) and maps of all Evacuation Regions (Figure H-1 through Figure H-34). The percentages presented in Table H-1 through Table H-3 are based on the methodology discussed in assumption 6 of Section 2.2 and shown in Figure 2-1.

Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

Peach Bottom Atomic Power Station H-1 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Table H-1. Percent of Zone Population Evacuating for Each Region (Regions RO1-R12)

Region

Description:

2-Mile 5-Mile Full Evacuate 2-Mile Radius and Downwind to 5 Miles Ring Ring EPZ Region Number: R01 R02 R03 R04 IR5 R06 R07 IR08 R09I R10 I R1I R12 N, NE, E,S Wind Direction Toward: N/A N/A N/A NE NE, ESE, SSE SSW, WSW WNW NW NNW NNE ENE SE SW Zone Delta 20% 20% I 20% I 20% I 20% I100% 2O0% 20% 20%

Drumore North 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Drumore South 20% 20% 20% [ 20% 1 20% 20% 1 20% 1 East Drumore 20% 20% 20% 20% 20% 20% 20% 1 20% 20% 20% 20%

Fawn 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Fawn Grove 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Fulton East 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Fulton West 20% 20% 20% 20% 20% 20% 20% 20%

Little Britain 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Lower Chanceford North 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Lower Chanceford South 20% 20% 20% 20% 20% 20%

Martic 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

20% 20% 20% 20% %20%

Peach Bottom Central 20%

Peach Bottom East 20%

20 20 2% 0% 00% 20% 20 Peach Bottom West 20% 20%

20% 20% 20% 20% 20% 20% 20% 20% 20%

Providence 20% 20%

20% 20% 20% 20% 20% 20% 20% 20% 20%

Quarryville 20% 20%

20% 20% 20% 20% 20% 20% 20% 20% 20%

West Nottingham 20% 20%

20% 20% 20% 20% 20% 20% 20% 20% 20%

Zone 1 20% 20%

20% 20% 20% 120%J20% 20%I 20% 20% 20%

Zone 2 20% 20%

2%20% 20% 20% 20 0 0 20% 20%

Zone 3 20% 20%

2% 2% 2%20%20% 20 0 20% 20%

Zone 4 20%

20% 20% 20% 20%j 20% 20% 20%

Zone 5 20%

20% 20% 20% ,20% 20% 20% 20% 20% 20% 20%j 20%

Zone not within Plume, but Evacuates because it is Zone(s) Shelter-in-Pla ce surrounded by other Zones which are Evacuating Peach Bottom Atomic Power Station H-2 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Table H-2. Percent of Zone Population Evacuating for Each Region (Regions R13-R24)

Region

Description:

Evacuate S-Mile Radius and Downwind to the EPZ Boundary Region Number: R13 R14 RI R16 R17 R18 R19 R20 R21 R22 R23 R24 N, NE ENE E, ESE SE SSE S, SW, W WNW Wind Direction Toward: NW NNW NNE SSW WSW Zone Delta Drumore North Drumore South East Drumore Fawn 120% 120% 120% 1 20% 20% 20% 20%0 20% 20%

20% 20% 20% 201%*'200% 020*%o200% 20% 20%

Fawn Grove 20% 120% 120% 20% 20% 20% 20%c 20% 20%-

Fulton East Fulton West Little Britain .L.----..-.--..--.

z I 2Up Yo u~. I z'o I zU' L.U~y I zUYpo I U~yo I ltfl'o I Lower Chanceford North 20% 20% 20% 20% 1 20% 20% 20% 20%

Lower Chanceford South Martic Peach Bottom Central Peach Bottom East Peach Bottom West 2u% 2U%

Providence 20% I 20% 20% 1 20% 1 20% 1 20% 1 20% 1 20% 20%

Quarryville 20% 0 20% 20% 20% 20% 20% 20%  %

I I Wes Notng 120% 120% 20% 20% 20%

West Nottingham i I Zone 1 120% 120% 1 20% 120% 20% 1 20% 20%

Zone 2 120% 1 20% 1 20% 20% 20% 20% 20%

Zone 3 I 20% I 20% I 20% I 20% 20% 1 20%1 20% 20% 20%

Zone 4 Zone 5 ie 6 20% 20% 1 20% 1 20% I 20% 20% I Zone(s) Shelter-in-Place Peach Bottom Atomic Power Station H-3 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Table H-3. Percent of Zone Population Evacuating for Each Region (Regions R25-R34)

Region

Description:

Staged Evacuation Mile Radius Evacuates, then Evacuate Downwind to 5 Miles Region Number: R25 R26 R27 R28 R29 R30 R31 R32 R33 R34 N, NE, E, ESE, W, Wind Direction Toward: 5-Mile Ring NNE ENE SE SSE SSW, WSW WNW NW NNW SW Zone Delta 20% 20% 20% 20% 20% 20%

Drumore North 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Drumore South 20% 20% 20% 20% 20% 20%

East Drumore 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Fawn 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Fawn Grove 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Fulton East 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Fulton West 20% 20% 20% 20% 20% 20% 20%

Little Britain 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Lower Chanceford North 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Lower Chanceford South 20% 20% 20% 20% 20%

Martic 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Peach Bottom Central 20% 20% 20% 20% 20% 20%

Peach Bottom East Peach Bottom West 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Providence 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Quarryville 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

West Nottingham 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Zone 1 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Zone 2 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Zone 3 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

Zone 4 20% 20% 20% 20% 20% 20% 20%

Zone 5 0 20% 20% 20% 20% 20%

Zone 6 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

izone(s) Shelter-in-Place f-m n mmi Peach Bottom Atomic Power Station H-4 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-1. Region R01 Peach Bottom Atomic Power Station H-5 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-2. Region R02 Peach Bottom Atomic Power Station H-6 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-3. Region R03 Peach Bottom Atomic Power Station H-7 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-4. Region R04 Peach Bottom Atomic Power Station H-8 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-5. Region R05 Peach Bottom Atomic Power Station H-9 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-6. Region R06 Peach Bottom Atomic Power Station H-10 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-7. Region R07 Peach Bottom Atomic Power Station H-11 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-8. Region R08 Peach Bottom Atomic Power Station H-12 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-9. Region R09 KLD Engineering, P.C.

Peach Bottom Atomic Power Station H-13 H-13 KLD Engineering, P.C.

Rev. 0 Evacuation Time Estimate

Figure H-10. Region RIO Peach Bottom Atomic Power Station H-14 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-11. Region Rll Peach Bottom Atomic Power Station H-15 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-12. Region R12 Peach Bottom Atomic Power Station H-16 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-13. Region R13 Peach Bottom Atomic Power Station H-17 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-14. Region R14 Peach Bottom Atomic Power Station H-18 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-15. Region R15 Peach Bottom Atomic Power Station H-19 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-16. Region R16 Peach Bottom Atomic Power Station H-20 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-17. Region R17 Peach Bottom Atomic Power Station H-21 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-18. Region R18 Peach Bottom Atomic Power Station H-22 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-19. Region R19 KLD Engineering, P.C.

Peach Bottom Atomic Power Station H-23 H-23 KLD Engineering, P.C.

Rev. 0 Evacuation Time Estimate

Figure H-20. Region R20 Peach Bottom Atomic Power Station H-24 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-21. Region R21 Peach Bottom Atomic Power Station H-25 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-22. Region R22 Peach Bottom Atomic Power Station H-26 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-23. Region R23 KLD Engineering, P.C.

Peach Bottom Atomic Power Station H-27 H-27 KLD Engineering, P.C.

Rev. 0 Evacuation Time Estimate

Figure H-24. Region R24 Peach Bottom Atomic Power Station H-28 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-25. Region R25 Peach Bottom Atomic Power Station H-29 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-26. Region R26 Peach Bottom Atomic Power Station H-30 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-27. Region R27 Peach Bottom Atomic Power Station H-31 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-28. Region R28 Peach Bottom Atomic Power Station H-32 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-29. Region R29 Peach Bottom Atomic Power Station H-33 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-30. Region R30 Peach Bottom Atomic Power Station H-34 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-31. Region R31 Peach Bottom Atomic Power Station H-35 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-32. Region R32 Peach Bottom Atomic Power Station H-36 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-33. Region R33 Peach Bottom Atomic Power Station H-37 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-34. Region R34 Peach Bottom Atomic Power Station H-38 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0