ML14141A051

From kanterella
Jump to navigation Jump to search
Attachment 1, Kld TR-635, Rev. 0, Development of Evacuation Time Estimates. Part 3 of 4
ML14141A051
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/28/2014
From:
KLD Engineering, PC
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards
Shared Package
ML14141A046 List:
References
RS-14-151 KLD TR-635, Rev. 0
Download: ML14141A051 (42)


Text

APPENDIX H Evacuation Regions

H. EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i) and maps of all Evacuation Regions (Figure H-1 through Figure H-38). The percentages presented in Table H-1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.

Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

Braidwood Generating Station Evacuation Time Estimate H-1 KLD Engineering, P.C.

Rev. 0

Table H-1. Percent of Sub-area Population Evacuating for Each Region (Regions ROI-R25)

Region R04 RO5 R06 R07 R08 R09 RIO R11 R17 Diectdion Toward:

1 2

3 4

NNW, N 20%20 NNE, NE, 20%

ENE E

20%20 ESE, SE 20%

20 SSE 20%20 2%

SSSW 20%20 2%

SW, WSW 20%20 2%

W 20%20 2%

WNW. NW 2n0 7n 2n Sub-area 5

6 7

8 9

1 10 1 11 1 12 13 14 15 16 20%

20%

20%

20%

20%

220%

j 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%o i

20%

20%

20%

20%

t20%

20%o 20%o 0%

20%

20%

20%

20% *20 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

t I

+

20% I 20%A 20%

1 7n-/. I 7n0% I ?nl 0 /. I -)n/.

Region R13 R14 R15 1

2 3

Methodj 20%

20%

2se:ctor 0.

approach sector 0%

20%

20%

approach 2 sector Sub-area 4

5 6 17 18 9

1 10 1 11 1 12 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

2%

120%

20%%

20%

20%

20%

20% 1 20%

20% 1 20%

13 14 15 20%0 20%

20%11 20%

20%

16 20%

20%

i i

20%

20%

20%

20%

20%

20%

20%

wina Sub-area Direction Toward:

1 2

3 4

5 68 91 3I W

0 20%

20%

20%

20%

NNE, NE, 20%

20%

20%

20%

ENE E, ESE, SE 20 0%2%

0 SSE20 20202%

SSW20 20202%

SW, WSW202%2 WNW, NW20%

NNW 20%

20%

20%

20%

Sub-area(s) Shelter-in-Place Braidwood Generating Station Evacuation Time Estimate H-2 KLD Engineering, P.C.

Rev. 0

Stage Evauaio il Radiu Evcats thnEaut.on idt ie Region R26 R27 R28 R29 R30 R31 R32 R33 R34 Toward SWl WSW20%

20 20%

E 0 20%

20%

WN W 20%

20%

20%

Sub-area 20%

2oi2o%

20%

20%

20%

20%

13 14 15 16 20%

20% 120%

120% 1 20% 1 20% 120%

20%

2 30%

0o 0

20%

20!20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20% j20% j20% 20% j20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

2n%

20%

20%

20%

20%

20%

20%

0 20%

20%

12%20%

20%

20%

20%

20%

20%

20% 1 20% I 20%

20%

20%A 20%

20%A I 20" I 20%

2n% I ?n-1 I 2n% I -)n-1 I n/

Region R36 R37 R38 Method 1

2 3

2 sector approach 20%

205 2 sector 0

approach 20%

205 2 sector Sub-area 4

5 6

17 18 20% 1 20%

20%

20%

20%

20%

L20%

20%

20%

20%

20%

20%

20%

20%

l 209 Sub-area(s) Shelter-in-Place Braidwood Generating Station Evacuation Time Estimate H-3 KLD Engineering, P.C.

Rev. 0

Figure H-1. Region R01 Braidwood Generating Station Evacuation Time Estimate H-4 KLD Engineering, P.C.

Rev. 0

Figure H-2. Region R02 Braidwood Generating Station Evacuation Time Estimate H-5 KLD Engineering, P.C.

Rev. 0

Figure H-3. Region R03 Braidwood Generating Station Evacuation Time Estimate H-6 KLD Engineering, P.C.

Rev. 0

Figure H-4. Region R04 Braidwood Generating Station Evacuation Time Estimate H-7 KLD Engineering, P.C.

Rev. 0

Figure H-5. Region ROS Braidwood Generating Station Evacuation Time Estimate H-8 KLD Engineering, P.C.

Rev. 0

Figure H-6. Region R06 Braidwood Generating Station Evacuation Time Estimate H-9 KLD Engineering, P.C.

Rev. 0

Figure H-7. Region R07 Braidwood Generating Station Evacuation Time Estimate H-10 KLD Engineering, P.C.

Rev. 0

Figure H-B. Region R08 H-li KLD Engineering, P.C.

Braidwood Generating Station Evacuation Time Estimate H-11 KLD Engineering, P.C.

Rev. 0

Figure H-9. Region R09 Braidwood Generating Station Evacuation Time Estimate H-12 KLD Engineering, P.C.

Rev. 0

Figure H-10. Region RIO Braidwood Generating Station Evacuation Time Estimate H-13 KLD Engineering, P.C.

Rev. 0

Figure H-11. Region Rll Braidwood Generating Station Evacuation Time Estimate H-14 KLD Engineering, P.C.

Rev. 0

Figure H-12. Region R12 H-15 KLD Engineering, P.C.

Braidwood Generating Station Evacuation Time Estimate H-15 KLD Engineering, P.C.

Rev. 0

Figure H-13. Region R13 Braidwood Generating Station Evacuation Time Estimate H-16 KLD Engineering, P.C.

Rev. 0

Figure H-14. Region R14 Braidwood Generating Station Evacuation Time Estimate H-17 KLD Engineering, P.C.

Rev. 0

Figure H-15. Region R15 Braidwood Generating Station Evacuation Time Estimate H-18 KLD Engineering, P.C.

Rev. 0

Figure H-16. Region R16 Braidwood Generating Station Evacuation Time Estimate H-19 KLD Engineering, P.C.

Rev. 0

Figure H-17. Region R17 Braidwood Generating Station Evacuation Time Estimate H-20 KLD Engineering, P.C.

Rev. 0

Figure H-18. Region R18 Braidwood Generating Station Evacuation Time Estimate H-21 KLD Engineering, P.C.

Rev. 0

Figure H-19. Region R19 Braidwood Generating Station Evacuation Time Estimate H-22 KLD Engineering, P.C.

Rev. 0

Figure H-20. Region R20 Braidwood Generating Station Evacuation Time Estimate H-23 KLD Engineering, P.C.

Rev. 0

Figure H-21. Region R21 Braidwood Generating Station Evacuation Time Estimate H-24 KLD Engineering, P.C.

Rev. 0

Figure H-22. Region R22 KLD Engineering, P.C.

Braidwood Generating Station Evacuation Time Estimate H-25 KLD Engineering, P.C.

Rev. 0

Figure H-23. Region R23 Braidwood Generating Station Evacuation Time Estimate H-26 KLD Engineering, P.C.

Rev. 0

Figure H-24. Region R24 Braidwood Generating Station Evacuation Time Estimate H-27 KLD Engineering, P.C.

Rev. 0

Figure H-25. Region R25 Braidwood Generating Station Evacuation Time Estimate H-28 KLD Engineering, P.C.

Rev. 0

Figure H-26. Region R26 Braidwood Generating Station Evacuation Time Estimate H-29 KLD Engineering, P.C.

Rev. 0

Figure H-27. Region R27 Braidwood Generating Station Evacuation Time Estimate H-30 KLD Engineering, P.C.

Rev. 0

Figure H-28. Region R28 Braidwood Generating Station Evacuation Time Estimate H-31 KLD Engineering, P.C.

Rev. 0

Figure H-29. Region R29 Braidwood Generating Station Evacuation Time Estimate H-32 KLD Engineering, P.C.

Rev. 0

Figure H-30. Region R30 Braidwood Generating Station Evacuation Time Estimate H-33 KLD Engineering, P.C.

Rev. 0

Figure H-31. Region R31 Braidwood Generating Station Evacuation Time Estimate H-34 KLD Engineering, P.C.

Rev. 0

Figure H-32. Region R32 Braidwood Generating Station Evacuation Time Estimate H-35 KLD Engineering, P.C.

Rev. 0

Figure H-33. Region R33 Braidwood Generating Station Evacuation Time Estimate H-36 KLD Engineering, P.C.

Rev. 0

Figure H-34. Region R34 Braidwood Generating Station Evacuation Time Estimate H-37 KLD Engineering, P.C.

Rev. 0

Figure H-35. Region R35 Braidwood Generating Station Evacuation Time Estimate H-38 KLD Engineering, P.C.

Rev. 0

Figure H-36. Region R36 Braidwood Generating Station Evacuation Time Estimate H-39 KLD Engineering, P.C.

Rev. 0

Figure H-37. Region R37 Braidwood Generating Station Evacuation Time Estimate H-40 KLD Engineering, P.C.

Rev. 0

Figure H-38. Region R38 Braidwood Generating Station Evacuation Time Estimate H-41 KLD Engineering, P.C.

Rev. 0