APPENDIX H Evacuation Regions
H. EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i) and maps of all Evacuation Regions (Figure H-1 through Figure H-23). The percentages presented in Table H-1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.
Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.
H-i KLD Engineering, P.c.
Byron Generating Station Evacuation Time Estimate H-1 KLD Engineering, P.C.
Rev. 0
Table H-1. Percent of Sub-area Population Evacuating for Each Region Sub-Area F
r 1
23 1
25 1
27 1281 39 I I
Sub-Area Region Wind Direction Toward:
10 I 12 1 14 1 17 1
19 I
R04 NW, NNW, N, NNE, NE 20%
20%
20%
20 25 27 2839 40 20%
20%
20%
20% 120% J20%
N/A W, WNW, ENE, E, ESE REFER TO R05 SE 20%
20%
20%
20%
R06 SSE, S 20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
-2na/-
2no/
20% 1 20%
Region Sub-Area Wind Direction Toward:
10 12 141 17 1
R08 NNW, N 20%
20%
R09 N NE 20%
20%
20%
RIO NE 20%
20%
20%
R11 ENE 20%
20%
20%
R12 E, ESE 20%
20%
20%
20%
20%
19 20 23 25 27 28 39 20%
20%
20%
20%
20%
himiiiL 20%
40 I
N/A S
4 I.
R17 WNW R18 NW 20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
Byron Generating Station Evacuation Time Estimate H-2 KLD Engineering, P.C.
Rev. 0
Stage Evacatio 2-l Raiu EvcaethnEauteD w
wn.t ie
_______Sub-Area Region Wind Direction Toward:
10o 12 1 14 R19 5-Mile Ring 20%
20%
20%
R20 NW, NNW, N, NNE, NE 20%
20%
20%
27 28 39 40 20%
20%
20%
20%
20%
20%
20%
20%
N/A W, WNW, ENE, E, ESE 20%
1 REFER TO R0O "2no IO_
R21 SE 20%
20%
20%
20%
R22 SSE, 5 20%
20%
20%
20%
20% 1 20%
Sub-area(s) Shelter-in-Place Byron Generating Station Evacuation Time Estimate H-3 KLD Engineering, P.C.
Rev. 0
Figure H-1. Region RO0 H-4 KLD Engineering, P.C.
Byron Generating Station Evacuation Time Estimate H-4 KLD Engineering, P.C.
Rev. 0
Figure H-2. Region R02 Byron Generating Station Evacuation Time Estimate H-5 KLD Engineering, P.C.
Rev. 0
Figure H-3. Region R03 Byron Generating Station Evacuation Time Estimate H-6 KLD Engineering, P.C.
Rev. 0
Figure H-4. Region R04 Byron Generating Station Evacuation Time Estimate H-7 KLD Engineering, P.C.
Rev. 0
I Figure H-5. Region R05 Byron Generating Station Evacuation Time Estimate H-8 KLD Engineering, P.C.
Rev. 0
I Figure H-6. Region R06 Byron Generating Station Evacuation Time Estimate H-9 KLD Engineering, P.C.
Rev. 0
Figure H-7. Region R07 Byron Generating Station Evacuation Time Estimate H-10 KLD Engineering, P.C.
Rev. 0
I Figure H-8. Region R08 Byron Generating Station Evacuation Time Estimate H-I1 KLD Engineering, P.C.
Rev. 0
Figure H-9. Region R09 Byron Generating Station Evacuation Time Estimate H-12 KLD Engineering, P.C.
Rev. 0
I Figure H-10. Region RIO Byron Generating Station Evacuation Time Estimate H-13 KLD Engineering, P.C.
Rev. 0
Figure H-11. Region Rll Byron Generating Station H-14 Evacuation Time Estimate KLD Engineering, P.C.
Rev. 0
I Figure H-12. Region R12 Byron Generating Station H-1S Evacuation Time Estimate KLD Engineering, P.C.
Rev. 0
Figure H-13. Region R13 Byron Generating Station H-16 Evacuation Time Estimate KLD Engineering, P.C.
Rev. 0
Figure H-14. Region R14 Byron Generating Station Evacuation Time Estimate H-17 KLD Engineering, P.C.
Rev. 0
Figure H-15. Region R15 Byron Generating Station Evacuation Time Estimate H-18 KLD Engineering, P.C.
Rev. 0
Figure H-16. Region R16 Byron Generating Station Evacuation Time Estimate H-19 KLD Engineering, P.C.
Rev. 0
I Figure H-17. Region R17 Byron Generating Station Evacuation Time Estimate H-20 KLD Engineering, P.C.
Rev. 0
I Figure H-18. Region R18 Byron Generating Station Evacuation Time Estimate H-21 KLD Engineering, P.C.
Rev. 0
Figure H-19. Region R19 Byron Generating Station Evacuation Time Estimate H-22 KLD Engineering, P.C.
Rev. 0
Figure H-20. Region R20 Byron Generating Station Evacuation Time Estimate H-23 KLD Engineering, P.C.
Rev. 0
Figure H-21. Region R21 Byron Generating Station Evacuation Time Estimate H-24 KLD Engineering, P.C.
Rev. 0
Figure H-22. Region R22 Byron Generating Station Evacuation Time Estimate H-25 KLD Engineering, P.C.
Rev. 0
Figure H-23. Region R23 Byron Generating Station Evacuation Time Estimate H-26 KLD Engineering, P.C.
Rev. 0