ML14141A056

From kanterella
Jump to navigation Jump to search
Attachment 2, Kld TR-637, Rev. 0, Development of Evacuation Time Estimates. Part 3 of 4
ML14141A056
Person / Time
Site: Byron  
Issue date: 04/21/2014
From:
KLD Engineering, PC
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14141A046 List:
References
RS-14-151 KLD TR-637, Rev. 0
Download: ML14141A056 (27)


Text

APPENDIX H Evacuation Regions

H. EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i) and maps of all Evacuation Regions (Figure H-1 through Figure H-23). The percentages presented in Table H-1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.

Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

H-i KLD Engineering, P.c.

Byron Generating Station Evacuation Time Estimate H-1 KLD Engineering, P.C.

Rev. 0

Table H-1. Percent of Sub-area Population Evacuating for Each Region Sub-Area F

r 1

23 1

25 1

27 1281 39 I I

Sub-Area Region Wind Direction Toward:

10 I 12 1 14 1 17 1

19 I

R04 NW, NNW, N, NNE, NE 20%

20%

20%

20 25 27 2839 40 20%

20%

20%

20% 120% J20%

N/A W, WNW, ENE, E, ESE REFER TO R05 SE 20%

20%

20%

20%

R06 SSE, S 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

-2na/-

2no/

R07 SSW. SW. WSW 20% 120%

20% 1 20%

Region Sub-Area Wind Direction Toward:

10 12 141 17 1

R08 NNW, N 20%

20%

R09 N NE 20%

20%

20%

RIO NE 20%

20%

20%

R11 ENE 20%

20%

20%

R12 E, ESE 20%

20%

20%

R13 SE, SSE 20%

20%

20%

19 20 23 25 27 28 39 20%

20%

20%

20%

20%

himiiiL 20%

40 I

N/A S

4 I.

R14 SSW R15 SW, WSW R16 W

R17 WNW R18 NW 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

Byron Generating Station Evacuation Time Estimate H-2 KLD Engineering, P.C.

Rev. 0

Stage Evacatio 2-l Raiu EvcaethnEauteD w

wn.t ie

_______Sub-Area Region Wind Direction Toward:

10o 12 1 14 R19 5-Mile Ring 20%

20%

20%

R20 NW, NNW, N, NNE, NE 20%

20%

20%

27 28 39 40 20%

20%

20%

20%

20%

20%

20%

20%

N/A W, WNW, ENE, E, ESE 20%

1 REFER TO R0O "2no IO_

R21 SE 20%

20%

20%

20%

R22 SSE, 5 20%

20%

20%

20%

R23 SSW, SW, WSW 20% 1 20%

20% 1 20%

Sub-area(s) Shelter-in-Place Byron Generating Station Evacuation Time Estimate H-3 KLD Engineering, P.C.

Rev. 0

Figure H-1. Region RO0 H-4 KLD Engineering, P.C.

Byron Generating Station Evacuation Time Estimate H-4 KLD Engineering, P.C.

Rev. 0

Figure H-2. Region R02 Byron Generating Station Evacuation Time Estimate H-5 KLD Engineering, P.C.

Rev. 0

Figure H-3. Region R03 Byron Generating Station Evacuation Time Estimate H-6 KLD Engineering, P.C.

Rev. 0

Figure H-4. Region R04 Byron Generating Station Evacuation Time Estimate H-7 KLD Engineering, P.C.

Rev. 0

I Figure H-5. Region R05 Byron Generating Station Evacuation Time Estimate H-8 KLD Engineering, P.C.

Rev. 0

I Figure H-6. Region R06 Byron Generating Station Evacuation Time Estimate H-9 KLD Engineering, P.C.

Rev. 0

Figure H-7. Region R07 Byron Generating Station Evacuation Time Estimate H-10 KLD Engineering, P.C.

Rev. 0

I Figure H-8. Region R08 Byron Generating Station Evacuation Time Estimate H-I1 KLD Engineering, P.C.

Rev. 0

Figure H-9. Region R09 Byron Generating Station Evacuation Time Estimate H-12 KLD Engineering, P.C.

Rev. 0

I Figure H-10. Region RIO Byron Generating Station Evacuation Time Estimate H-13 KLD Engineering, P.C.

Rev. 0

Figure H-11. Region Rll Byron Generating Station H-14 Evacuation Time Estimate KLD Engineering, P.C.

Rev. 0

I Figure H-12. Region R12 Byron Generating Station H-1S Evacuation Time Estimate KLD Engineering, P.C.

Rev. 0

Figure H-13. Region R13 Byron Generating Station H-16 Evacuation Time Estimate KLD Engineering, P.C.

Rev. 0

Figure H-14. Region R14 Byron Generating Station Evacuation Time Estimate H-17 KLD Engineering, P.C.

Rev. 0

Figure H-15. Region R15 Byron Generating Station Evacuation Time Estimate H-18 KLD Engineering, P.C.

Rev. 0

Figure H-16. Region R16 Byron Generating Station Evacuation Time Estimate H-19 KLD Engineering, P.C.

Rev. 0

I Figure H-17. Region R17 Byron Generating Station Evacuation Time Estimate H-20 KLD Engineering, P.C.

Rev. 0

I Figure H-18. Region R18 Byron Generating Station Evacuation Time Estimate H-21 KLD Engineering, P.C.

Rev. 0

Figure H-19. Region R19 Byron Generating Station Evacuation Time Estimate H-22 KLD Engineering, P.C.

Rev. 0

Figure H-20. Region R20 Byron Generating Station Evacuation Time Estimate H-23 KLD Engineering, P.C.

Rev. 0

Figure H-21. Region R21 Byron Generating Station Evacuation Time Estimate H-24 KLD Engineering, P.C.

Rev. 0

Figure H-22. Region R22 Byron Generating Station Evacuation Time Estimate H-25 KLD Engineering, P.C.

Rev. 0

Figure H-23. Region R23 Byron Generating Station Evacuation Time Estimate H-26 KLD Engineering, P.C.

Rev. 0