ML18230A907
From kanterella
Jump to navigation
Jump to search
ML18230A907 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 08/18/2018 |
From: | Carolina Power & Light Co |
To: | Office of Nuclear Reactor Regulation |
References | |
9.5-1 | |
Download: ML18230A907 (1) | |
Similar Documents at Harris | |
---|---|
Category:Drawing
MONTHYEARRA-20-0134, Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 2 of 22020-05-15015 May 2020
[Table view]Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 2 of 2 ML20147A0422020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 1 of 2 RA-19-0160, Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 32019-03-29029 March 2019 Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 3 ML18230A9082018-08-18018 August 2018 Emergency Core Cooling System, 6.1-1, Amendment No. 15, Sheet 1 of 2 ML18230A9492018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Reactor Vessel Schematic, 4.2-2 ML18230A9482018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Geologic Map of Moore County, North Carolina, Mineral Resources ML18230A9472018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Map, Geologic Plan, Fault Intersection with West Dike 3 and West Dike 3S, Plate 5 ML18230A9462018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Map, Geologic Section at Fault, West Side of Plant Excavation, Plate 3 ML18230A9452018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Plan View, Site Fault Investigation, Plate 2 ML18230A9432018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Side-Looking Airborne Radar Imagery Locations of Lineaments, Plate C-3 ML18230A9422018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Map, Side-Looking Airborne Radar Imagery Locations of Lineaments, Plate C-4 ML18230A9412018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Map, Side-Looking Airborne Radar Imagery Lineaments, Plate C-6 ML18230A9402018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Side-Looking Airborne Radar Imagery Locations of Lineaments, Plate C-5 ML18230A9392018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Map, Remote Sensing Lineaments, Composite Map, Place C-10 ML18230A9092018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Reactor Auxiliary Building Sections, 1.1-9, Amendment No. 18 ML18230A9102018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Reactor Auxiliary Building Plan Sheet 4, 1.1-8, Amendment No. 18 ML18230A9072018-08-18018 August 2018 Component Cooling Water System, 9.5-1, Amendment No. 10 ML18230A9042018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Single Unit Main One Line Diagram, 8.4-2, Amendment No. 15 ML18230A9302018-08-18018 August 2018 Figure A-4A, Site Geologic Map, Amendment 29 ML18230A9292018-08-18018 August 2018 Figure A-4B, Site Geologic Map Showing Reservoir and Class-1 Structures, Amendment No. 29 ML18230A9062018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Sampling System, 9.7-1, Amendment No. 10 ML18230A9192018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Service Water System, 9.8-1, Amendment No. 10 ML18230A9182018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Subsurface Investigation Plan, Auxiliary Dam and Spillway Sheet No. 4, 2.6-1f, Amendment No. 17 ML18230A9172018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Subsurface Investigation Auxiliary Dam - Sheet No. 3, 2.6-1e, Amendment No. 17 ML18230A9162018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Map, Subsurface Investigation Plan Plant Area - Sheet No. 2, 2.6-1d, Amendment No. 19 ML18230A9152018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Subsurface Investigation Plan Plant Area Sheet No. 1, 2.6-1c, Amendment No. 17 ML18230A9142018-08-18018 August 2018 Figure 3.2-28, Fuel Assembly Outline ML18230A9132018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Reactor Auxiliary Building Plan Sheet 2, 1.1-6, Amendment No. 18 ML18230A9122018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Reactor Auxiliary Building Plan Sheet 1, 1.1-5, Amendment No. 18 ML18230A9112018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Reactor Auxiliary Building Plan Sheet 3, 1.1-7, Amendment No. 18 ML18230A8942018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Fuel Handling Building Plan, 1.1-14, Amendment No. 18 ML18230A8782018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Reactor Auxiliary Building Sections, 1.1-9 ML18230A8862018-08-18018 August 2018 Drawing 2.6-1g, Subsurface Investigation Plan, Main Dam - Sheet No. 5. ML18230A8872018-08-18018 August 2018 Drawing 2.6-1h, Subsurface Investigation Plan, Main Dam Spillway - Sheet No. 6. ML18230A8822018-08-18018 August 2018 Drawing 2.6-1h, Subsurface Investigation Plan, Main Dam Spillway - Sheet No. 6. ML18230A8882018-08-18018 August 2018 Figure A-4B, Site Geologic Map Showing Reservoir and Class-I Structures, (Refer to Figure A-4A for Geologic Details) ML18230A8842018-08-18018 August 2018 Drawing 10.2-1, Steam and Feedwater Systems. ML18230A8892018-08-18018 August 2018 Figure A-4A, Site Geologic Map ML18230A8832018-08-18018 August 2018 Auxiliary Separating Dike, 2.6-30, Amendment No. 17 ML18230A8972018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, General Arrangement Turbine Building Operating Floor Plan Sheet 3, 1.1-18 ML18230A8902018-08-18018 August 2018 Auxiliary Dam - Plan, 2.6-28, Amendment No. 17 ML18230A8912018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Main Dam Profile Section and Materials, 2.6-27a, Amendment No. 17 ML18230A8922018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Subsurface Investigation Plan, Main Dam Sheet No. 5, 2.6-1g, Amendment No. 17 ML18230A9052018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Drawing, Multi-Unit Main One Line Diagram, 8.4-1, Amendment No. 17 ML18230A8952018-08-18018 August 2018 Diesel Fuel Oil System, 9.14-1, Amendment No. 15 ML18230A8962018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Turbine Building Mezzanine Floor Plan, Sheet 2, 1.1-17 ML18230A8932018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - General Arrangement Fuel Handling Building Sections, 1.1-15, Amendment No. 18 ML18230A8982018-08-18018 August 2018 Carolina Power & Light Co., Shearon Harris Units 1, 2, 3, & 4 - Map, General Arrangement Turbine Building Ground Floor Plan, Sheet 1, 1.1-16 ML18230A9002018-08-18018 August 2018 Carolina Power & Light Co., - Extraction Steam System, 10.2-2, Amendment No. 10 ML18230A8992018-08-18018 August 2018 Containment Spray System, 6.3-1, Amendment No. 13 2020-05-15 |
Text
~
~ Ikmieil e
8 e
r'RAK IS '+ oo'Q I-
~ I' V
I
'i O Qe e 6 '"I 6 0
e ~X(~jK+Zi I I
~ ~ ~~
Retrieved from "https://kanterella.com/w/index.php?title=ML18230A907&oldid=2399727"