ML18230A913

From kanterella
Jump to navigation Jump to search
General Arrangement Reactor Auxiliary Building Plan Sheet 2, 1.1-6, Amendment No. 18
ML18230A913
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/18/2018
From:
Carolina Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
1.1-6
Download: ML18230A913 (1)


Text

N CABLE SPASAOIHC P COM UNIT I'B CABLE SPHEAOING ROOM UNIT'1 4 EQUIPMEHT REHOVAL HATCH RNN 4EAT Et CHANGERS BORON INJECTION SURGE TANK BORON INJECTION RECIRCULATION PUHPS NONORAIL VOLUME CONTROL TANK RHPI. 4(AY afcHAHGI~ S BORON INJECTION SURGE TANK BORON IHJWTIDN RECIRCULATION PUHPS NDNtIRAIL VOLUME CONTROL TANK SQUIPMEHT ItBMJJtst, HATCH K

I CNILLER SURGE TANK 4VAC IUPPLY DUCT

.FEEDWATER PUHPS~

WEAII IHIWEN Alpt.FEEDMATt'R puHps ROTOR DRIVEN FIFEI CMLE CHASE I

I I

saat VATES JILT EIIC4ANINI, PENETRATION AREA BORON IHRCTWH TANK CHENICIL HIVING TAHK paKSDNHEL AIR LOCK SEAL WATER FILIER PIPE CIU'IE PENETRATION AREA CASIE CW SE SEAL WATER HEAT E1CHLHCER CABLE SPR'EAINNG ltOOIA UNITS'ABLESPATAIHHL EOOIA UHW JB sML WATEP, -J HIAT EYCIHNGEP PIPE CHASe PENETRATION AREA CABLE CHASE SCHON ELECTION ILHII CHEHICAL NUflus TANK PERSONH SL AIR LOCK REACltul CUDLAHT FILTElt MALWATER FILTER PIPED'CABLE PENETRATION AREA NDt FEEDWATER puul's STEA4 DRIVEN HVAC fUPFLY NIC AUE.FEEOWATBI PUNPS I/

NDTOR DRHIEN CI ~

DEWH.RSHOVAL IJTCH (IYR)

BAYCHIHS AHK BORIC AC D TAIJI SOR C ACH TANK HVAC a+FAULT 0

CWiAIHMENT SOLNNG 2 CMfuaR suRSE TANK VAC CLHAUSV CONTAINMEHY SUIWINGWj 4VAC CSIHULT IWCT Amendment No. 18 RECYCLE EVAP RECICLE HDLDU TANKS RECYCLE EVAP CAROLINA POWER IE LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNITS I, 2. 3 Et 4 FLOOR PLAN EL. 240.00 GENERAL ARRANGEMENT REACTOR AUXILIARY BUILDING PLAN SHEET 2

1.1-6