|
---|
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-IV-87-042, licensee Shutting Down Reactor Due to Increasing Temps in Thrust Bearing of Reactor Coolant Pump 2B,possibly Caused by Clogging of Lube Oil Strainer.Shutdown Expected to Exceed 48 H1987-09-0303 September 1987 PNO-IV-87-042:licensee Shutting Down Reactor Due to Increasing Temps in Thrust Bearing of Reactor Coolant Pump 2B,possibly Caused by Clogging of Lube Oil Strainer.Shutdown Expected to Exceed 48 H IR 05000358/19840041984-06-0505 June 1984 IE Insp Rept 50-358/84-04 on 840220-0426.Major Areas Inspected:Activities Re Const Welding Procedure & Welder Performance Qualifications.Addl Actions Required to Fully Determine Quality of Installed Welding PNO-III-82-072, on 820801,licensee Authorized to Reduce 100% Reinsp Program of Constructor & Subcontractor QC Insp. Program Reduced to 50% of Reinsp Plus Surveillance Program1982-08-0303 August 1982 PNO-III-82-072:on 820801,licensee Authorized to Reduce 100% Reinsp Program of Constructor & Subcontractor QC Insp. Program Reduced to 50% of Reinsp Plus Surveillance Program IR 05000358/19820071982-07-15015 July 1982 IE Mgt Meeting Rept 50-358/82-07 on 820504.No Noncompliance Noted.Major Areas Discussed:Status of Quality Confirmation program,820408 Immediate Action Ltr & Licensee Proposed Changes to Reinsp Program for Contractor IR 05000358/19820091982-07-0202 July 1982 IE Insp Repts 50-358/82-09 & 30-11989/82-01 on 820614-17. No Noncompliance Noted.Major Areas Inspected:Radiation Protection Program Including Organization,Training, Procedures,Instruments & Equipment ML20055A4901982-07-0101 July 1982 Notice of Violation from Insp on 820302-0407 IR 05000358/19820051982-06-21021 June 1982 IE Insp Rept 50-358/82-05 on 820302-0407.Noncompliance Noted:Failure to Have Adequate Procedures &/Or Follow Procedures Prescribed in 16-QA-03,Revision 2 Re Acceptable Methods for Achieving Corrective Actions ML20125B9431981-04-10010 April 1981 Draft IE Investigation Rept from 810410 Meeting.Major Areas Discussed:Qa Program,Design Control,Matl Traceability, Welding Controls,Control of Nonconformances,Corrective Action & Audits.Concerns Stem from Applegate Allegations IR 05000358/19780281978-11-20020 November 1978 IE Inspec Rept 50-358/78-28 on 781024-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Emergency,Maint & Operating Procedures IR 05000358/19780231978-11-17017 November 1978 IE Inspec Rept 50-358/78-23 on 781010-13 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Radiat Protec,Initial Training,Refresher Training, Procedures,Facil,Instru & Equip IR 05000358/19780201978-11-13013 November 1978 IE Inspec Rept 50-358/78-20 on 780911-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Preoper Testing Quality Assurance,Procurement,Safety Comm Activities & Plant Procedures IR 05000358/19780221978-10-23023 October 1978 IE Inspec Rept 50-358/78-22 on 780928-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Safety Related Hangers,Restraints & Concrete Expansion Anchor Bolts Installation IR 05000358/19780181978-10-0303 October 1978 IE Inspec Rept 50-358/78-18 on 780809-11,15,16 During Which 6 Items of Noncompliance Were Noted:Installation of Concrete Expansion Bolts for Hangers & Snubbers Not IAW Drawings ML20148K6631978-10-0303 October 1978 Notice of Violation from Inspec on 780809-11,15, & 16 IR 05000358/19780191978-09-26026 September 1978 IE Inspec Repts 50-358/78-19 on 780828-30 During Which No Items of Noncompliance Were Noted. Major Areas Inspected Incl:Examination of ISI Plan & Procedure for Presvc Inspec & Observation of NDE Activities ML20148B9371978-09-14014 September 1978 Notice of Violation from Insp on 780802-04 IR 05000358/19780161978-09-14014 September 1978 Insp Rept 50-358/78-16 on 780802-04.Noncompliance Noted: Lack of Documentation for Qualifying safety-related Electric Motors & Instruments & Inadequate Design Criteria Re Redundant Cable IR 05000358/19780151978-08-11011 August 1978 IE Inspec Rept 50-358/78-15,on 780718-21 & 780809-11 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Preoper Test Prog Organization & Status of Constr Re Preoper Test Prog ML20125A4001978-08-0202 August 1978 Insp Rept on 780523-0623.No Noncompliance Noted.Major Areas Inspected:Plant Procedures & Operational & Corporated Staffing ML20249B1881976-02-25025 February 1976 PNO-76-032:on 760223,individual Notified NRC That Receipt Insps Were Not Conducted as Required on Matls Being Received at Site IR 05000358/19740031974-10-10010 October 1974 Insp Rept 50-358/74-03 on 740916-18.No Violations Noted. Major Areas Inspected:Corrective Action Taken Re Containment Equipment Hatch IR 05000358/19750041974-08-14014 August 1974 Insp Rept 50-358/75-04 on 750721-23.Major Areas Inspected: Corrective Actions Taken in Response Ltr to Enforcement Items Identified in Previous Rept & Protection & Handling of Stored Equipment,Results of Audits & Qa/Qc Programs IR 05000358/19740021974-05-18018 May 1974 Insp Rept 50-358/74-02 on 740515-17.Violations Noted: Containment Equipment Hatch Delivered to Site & Installed in Containment Liner by Chicago Bridge & Iron Co Prior to Review by Sargent & Lundy Personnel IR 05000358/19740011974-03-13013 March 1974 Insp Rept 50-358/74-01 on 740207 & 08.Violations Noted: Outside Reactor Vessel Washed W/Const Water IR 05000358/19730071974-01-0707 January 1974 Insp Rept 50-358/73-07 on 731119-21.Violations Noted:Matl Determined to Have Document Deficiency & Not Tagged as Required by Receiving Procedure & Documentation Unavailable to Establish That Fly Ash Delivered Met ASTM Spec C618 IR 05000358/19730061973-09-28028 September 1973 Insp Rept 50-358/73-06 on 730806-08.Violations Noted.Major Areas Inspected:Fabrication of Primary Steam Piping for Plant Reactor Facility at Associated Piping & Engineering Plant in Compton,Ca IR 05000358/19730051973-08-0303 August 1973 Insp Rept 50-358/73-05 on 730803.No Violations Noted.Major Areas Inspected:Reactor Pressure Vessel at CBI Nuclear Co Plant in Memphis,Tn IR 05000358/19730031973-05-0202 May 1973 Insp Rept 50-358/73-03 on 730410-11.Violations Noted.Major Areas Inspected:Disposition of Previously Identified Unresolved Matters & Implementation of QA Program Re Concrete Production,Placement & Testing Activities IR 05000358/19730021973-02-0707 February 1973 Insp Rept 50-358/73-02 on 730125.No Violations Noted.Major Areas Inspected:Audit Procedures & Techniques Used at Inland-Ryerson Const Products Co Plant IR 05000358/19730011973-02-0101 February 1973 Insp Rept 50-358/73-01 on 730118-19.No Violations Noted. Major Areas Inspected:Qa & Site Const Activities IR 05000358/19720031972-10-12012 October 1972 Insp Rept 50-358/72-03 on 720907.No Items of Noncompliance Noted.Major Areas Inspected:Qa & Site Preparation Activities.Incomplete AEC Forwarding Rept to Util Encl 1987-09-03
[Table view] |
TU@MMMM'nMeh60M#hBM @fMAbr LW %39@9/A (WCMMicL2;--lN-UUE-G8-72 li) ate: Auaust 3i 1982 l
1 This preli::insry nstificatica crnaitutes EARLY notice of svants oi POSSIBLE safety or '
public intersat significznca. Tha informstion is ss initially receivad without vari-
'ficstion or evaluation, and is basically-all that is known by the staff on this date.
Facility: Cincinnati Gas & Elec. Licensee Emergency Classification:
Zimmer Nuclear Power Station Notification of Unusual Event Docket No. 50-358 Alert
-Moscow, OH 45153 Site Area Emergency General Emergency XX Not Applicable
Subject:
LICENSEE AUTHORIZED TO REDUCE 100% REINSPECTION PROGRAN A; of August 1,1982, the licensee has been authorized by Region III to reduce its 100 percent rainspection program of constructor and subcontractor Quality Control inspections. The Licsnsee was required to perform 100 percent reinspections in an Immediate Action Letter 5
(IAL) on April 8, 1981. The IAL was in response to numerous instances of QA/QC deficiencies at the Zi ener plant.
2 Tha licensee has asked that this 100 percent reinspection program be reduced. It bases its 1 rsquist on its revised quality assurance program and the revised QA programs of its constructor, Kaiser Engineering, and contractors. Region III is satisfied with the licensee's
> offerts thus far, and has approved the Licensee's request, allowing a reduction to 50 percent cf reinspections plus a surveillance program. The levels of inspection and surveillance wiLL be edjusted monthly, depending on findings. The constructor, Kaiser Engineering, and rubcontractors will continue their full inspection programs.
N2ws media interest is anticipated. Region III (Chicago) does not plan a press ' release at this time, but will respond to inquiries. The State of Ohio will be notified.
. This information is current as of 1 p.m. (CDT) on August 3, 1982.
Contact:
m>
R. Warnick E. Schweibinz
. 384-2673 384-2542 s ,
m ~
- I
- Z3ICUCD PICIIIAL Certifica E7 __
i DISTRIBUTIpN:
! H. St. a ds_ MSBB M N Phillips/// d' 'E/W h O Willste /
Chairman Palladino EDO NRR IE NMSS Comm. Gilinsky PA OIA . RES Cc==. Ahearne MPA AEOD Co:2. Roberts ELD Air Eights /.s d MAIL:
Co:2. Asselstine SP INPO /j g._ ADM:DMB FECY 8304280339 820803 NSAC u#/ DOT: Trans Only ACRS PDR 18cE PNO-III-82-072 PDR CA
?3E . Regions I # 7 , II ,) ff , IVh w , V o g LicenseeL(Corporate Office) / g b(
\- -