MONTHYEARPNO-IV-87-042, licensee Shutting Down Reactor Due to Increasing Temps in Thrust Bearing of Reactor Coolant Pump 2B,possibly Caused by Clogging of Lube Oil Strainer.Shutdown Expected to Exceed 48 H1987-09-0303 September 1987 PNO-IV-87-042:licensee Shutting Down Reactor Due to Increasing Temps in Thrust Bearing of Reactor Coolant Pump 2B,possibly Caused by Clogging of Lube Oil Strainer.Shutdown Expected to Exceed 48 H IR 05000358/19840041984-06-0505 June 1984 IE Insp Rept 50-358/84-04 on 840220-0426.Major Areas Inspected:Activities Re Const Welding Procedure & Welder Performance Qualifications.Addl Actions Required to Fully Determine Quality of Installed Welding PNO-III-82-072, on 820801,licensee Authorized to Reduce 100% Reinsp Program of Constructor & Subcontractor QC Insp. Program Reduced to 50% of Reinsp Plus Surveillance Program1982-08-0303 August 1982 PNO-III-82-072:on 820801,licensee Authorized to Reduce 100% Reinsp Program of Constructor & Subcontractor QC Insp. Program Reduced to 50% of Reinsp Plus Surveillance Program IR 05000358/19820071982-07-15015 July 1982 IE Mgt Meeting Rept 50-358/82-07 on 820504.No Noncompliance Noted.Major Areas Discussed:Status of Quality Confirmation program,820408 Immediate Action Ltr & Licensee Proposed Changes to Reinsp Program for Contractor IR 05000358/19820091982-07-0202 July 1982 IE Insp Repts 50-358/82-09 & 30-11989/82-01 on 820614-17. No Noncompliance Noted.Major Areas Inspected:Radiation Protection Program Including Organization,Training, Procedures,Instruments & Equipment ML20055A4901982-07-0101 July 1982 Notice of Violation from Insp on 820302-0407 IR 05000358/19820051982-06-21021 June 1982 IE Insp Rept 50-358/82-05 on 820302-0407.Noncompliance Noted:Failure to Have Adequate Procedures &/Or Follow Procedures Prescribed in 16-QA-03,Revision 2 Re Acceptable Methods for Achieving Corrective Actions ML20125B9431981-04-10010 April 1981 Draft IE Investigation Rept from 810410 Meeting.Major Areas Discussed:Qa Program,Design Control,Matl Traceability, Welding Controls,Control of Nonconformances,Corrective Action & Audits.Concerns Stem from Applegate Allegations IR 05000358/19780281978-11-20020 November 1978 IE Inspec Rept 50-358/78-28 on 781024-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Emergency,Maint & Operating Procedures IR 05000358/19780231978-11-17017 November 1978 IE Inspec Rept 50-358/78-23 on 781010-13 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Radiat Protec,Initial Training,Refresher Training, Procedures,Facil,Instru & Equip IR 05000358/19780201978-11-13013 November 1978 IE Inspec Rept 50-358/78-20 on 780911-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Preoper Testing Quality Assurance,Procurement,Safety Comm Activities & Plant Procedures IR 05000358/19780221978-10-23023 October 1978 IE Inspec Rept 50-358/78-22 on 780928-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Safety Related Hangers,Restraints & Concrete Expansion Anchor Bolts Installation IR 05000358/19780181978-10-0303 October 1978 IE Inspec Rept 50-358/78-18 on 780809-11,15,16 During Which 6 Items of Noncompliance Were Noted:Installation of Concrete Expansion Bolts for Hangers & Snubbers Not IAW Drawings ML20148K6631978-10-0303 October 1978 Notice of Violation from Inspec on 780809-11,15, & 16 IR 05000358/19780191978-09-26026 September 1978 IE Inspec Repts 50-358/78-19 on 780828-30 During Which No Items of Noncompliance Were Noted. Major Areas Inspected Incl:Examination of ISI Plan & Procedure for Presvc Inspec & Observation of NDE Activities ML20148B9371978-09-14014 September 1978 Notice of Violation from Insp on 780802-04 IR 05000358/19780161978-09-14014 September 1978 Insp Rept 50-358/78-16 on 780802-04.Noncompliance Noted: Lack of Documentation for Qualifying safety-related Electric Motors & Instruments & Inadequate Design Criteria Re Redundant Cable IR 05000358/19780151978-08-11011 August 1978 IE Inspec Rept 50-358/78-15,on 780718-21 & 780809-11 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Preoper Test Prog Organization & Status of Constr Re Preoper Test Prog ML20125A4001978-08-0202 August 1978 Insp Rept on 780523-0623.No Noncompliance Noted.Major Areas Inspected:Plant Procedures & Operational & Corporated Staffing ML20249B1881976-02-25025 February 1976 PNO-76-032:on 760223,individual Notified NRC That Receipt Insps Were Not Conducted as Required on Matls Being Received at Site IR 05000358/19740031974-10-10010 October 1974 Insp Rept 50-358/74-03 on 740916-18.No Violations Noted. Major Areas Inspected:Corrective Action Taken Re Containment Equipment Hatch IR 05000358/19750041974-08-14014 August 1974 Insp Rept 50-358/75-04 on 750721-23.Major Areas Inspected: Corrective Actions Taken in Response Ltr to Enforcement Items Identified in Previous Rept & Protection & Handling of Stored Equipment,Results of Audits & Qa/Qc Programs IR 05000358/19740021974-05-18018 May 1974 Insp Rept 50-358/74-02 on 740515-17.Violations Noted: Containment Equipment Hatch Delivered to Site & Installed in Containment Liner by Chicago Bridge & Iron Co Prior to Review by Sargent & Lundy Personnel IR 05000358/19740011974-03-13013 March 1974 Insp Rept 50-358/74-01 on 740207 & 08.Violations Noted: Outside Reactor Vessel Washed W/Const Water IR 05000358/19730071974-01-0707 January 1974 Insp Rept 50-358/73-07 on 731119-21.Violations Noted:Matl Determined to Have Document Deficiency & Not Tagged as Required by Receiving Procedure & Documentation Unavailable to Establish That Fly Ash Delivered Met ASTM Spec C618 IR 05000358/19730061973-09-28028 September 1973 Insp Rept 50-358/73-06 on 730806-08.Violations Noted.Major Areas Inspected:Fabrication of Primary Steam Piping for Plant Reactor Facility at Associated Piping & Engineering Plant in Compton,Ca IR 05000358/19730051973-08-0303 August 1973 Insp Rept 50-358/73-05 on 730803.No Violations Noted.Major Areas Inspected:Reactor Pressure Vessel at CBI Nuclear Co Plant in Memphis,Tn IR 05000358/19730031973-05-0202 May 1973 Insp Rept 50-358/73-03 on 730410-11.Violations Noted.Major Areas Inspected:Disposition of Previously Identified Unresolved Matters & Implementation of QA Program Re Concrete Production,Placement & Testing Activities IR 05000358/19730021973-02-0707 February 1973 Insp Rept 50-358/73-02 on 730125.No Violations Noted.Major Areas Inspected:Audit Procedures & Techniques Used at Inland-Ryerson Const Products Co Plant IR 05000358/19730011973-02-0101 February 1973 Insp Rept 50-358/73-01 on 730118-19.No Violations Noted. Major Areas Inspected:Qa & Site Const Activities IR 05000358/19720031972-10-12012 October 1972 Insp Rept 50-358/72-03 on 720907.No Items of Noncompliance Noted.Major Areas Inspected:Qa & Site Preparation Activities.Incomplete AEC Forwarding Rept to Util Encl 1987-09-03
[Table view] |
Text
.
1 s q ., ,
Appendix e s 9-
,1[- NOTICE OF VIOLATION t
T / Cincinnati Gas and Electric Company Docket No. 50-358 As a result of tho inspection conducted during the period of March 2-5, 8-12, i 15-19 22-26, 29-31, April 1-2, and 5-7, 1982, and in accordance with the NRC -
l Enforcement Policy, 47 FR 9987 (March 9, 1982), the following violations were l identified:
- 1. 10 CFR 50, Appendix B, Criterion V states, in part, " Activities affecting quality shall be prescribed by documented instructions, pro-
'. j cedures, or drawings, of a type appropriate to'the circumstances and
- shall be accomplished in accordance with these instructions, procedures, e or drawings." '
i
. The Cincinnati Cas and Electric Company Quality Assurance Manual, Paragraph 5.1 states, " Construction, fabrication, and manufacturing activities which affect the quality of the facility are accomplished in accordance with written instructions, procedures, and drawings which prescribe acceptable methods of carrying out those activities."
s- Contrary to the above, CG6E Quality Assurance Procedure 16-QA-03,
" Corrective Action Reports," was not appropriate to the circumstances and did not prescribe acceptable methods of achieving corrective action to identified problems as evidenced by lack of timely corrective action and lack of procedure adherence on the part of those administering the procedure. This condition existed from the time Revision 2 to 16-QA-03 was issued (August 28, 1981) until the corrective actions detailed in Inspection Report No. 50-358/82-05 were instituted by the licensee.
This is a Severity Level,V violation (Supplement II).
l 2. 10 CFR'50, Appendix B, Criterion V states, in part, " Activities affecting quality shall be prescribed by documented instructions, pro-cedures, or drawings, of a type appropriate to the circumstances and s shall be accomplished in accordance with these instructions, procedures, or drawings."
The Cincinnati Gas and Electric Company Quality Assurance Manta:
Paragraph 5.1 states, " Construction, fabrication, and manufactur og D, activities which affect the quality of the facility are accomplished s in accordance with written instructions, procedures, and drawings
?,
which prescribe acceptable methods of carrying out those activities."
,( '
q y
li J
/ 8207190070 820701 PDR ADOCK 05000358 o PDR
'. {} s ' ')
f u w
i Appendix 2 Contrary to the above, the personnel responsible for administering the Cincinnati Gas and Electric Company Owners Project Procedure (OPP)-7.1, "NRC 10 CFR 21 and 50.55(e) Reports," failed to follow the procedure in that the results of prompt reviews for reportability were not documented, ,
the forms (Attachment 7.3 to OPP-7.1) were not properly filled out, and
~
l the log of activities under OPP-7.1 was not maintained as described on the procedure flow chart (Attachment 7.5 to PP-7.1). This failure to l follow procedure resulted in the lack of documentary evidence of
This is a Severity Level V violation (Supplement,II).
With respect to Item 1, the inspection showed that action had been taken to correct the identified items of noncompliance and to prevent recdrrence.
Consequently, no reply to this item of noncompliance is required and we have i no further questions regarding this matter. With respect to Item 2, pursuant j to the provisions of 10 CFR 2.201 you are required to submit to this office within thirty days of the date of this Notice a written statement or explana-tion in reply, including for each item of noncompliance: (1) corrective 4
action taken and results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be l achieved. Consideration may be given to extending your response time for good cause shown.
QUb _
! Dated R. L. Spessard, Director l
Division of Project and Resident Programs t