Letter Sequence Request |
---|
|
|
MONTHYEARNLS2009038, Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 02009-06-18018 June 2009 Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 0 Project stage: Request ML0918700032009-07-0606 July 2009 Acceptance Review E-mail, Relief Request No. RV-06 from Certain Inservice Testing Requirements Related to Valves in the Control Rod Drive System Project stage: Acceptance Review ML0923801012009-08-26026 August 2009 Request for Additional Information Relief Request No. RV-06 Project stage: RAI NLS2009077, Response to Request for Additional Information Regarding 10 CFR 50.55a, Request RV-06, Revision 02009-09-30030 September 2009 Response to Request for Additional Information Regarding 10 CFR 50.55a, Request RV-06, Revision 0 Project stage: Response to RAI NLS2009093, Submittal of Supplement Information Revision 1 to RV-06 and to Technical Specification Surveillance Requirements 3.1.4:3 and 3.1.4.4, in Addition to SRs 3.1.4.1 and 3.1.4.22009-11-18018 November 2009 Submittal of Supplement Information Revision 1 to RV-06 and to Technical Specification Surveillance Requirements 3.1.4:3 and 3.1.4.4, in Addition to SRs 3.1.4.1 and 3.1.4.2 Project stage: Request ML1009703402010-04-26026 April 2010 Relief, Relief Request No. RV-06 from Certain Inservice Testing Requirements Related to Valves in the Control Rod Drive System, for Fourth 10-Year IST Interval Project stage: Other 2009-07-06
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 NLS2020053, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-042020-08-26026 August 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-04 NLS2019034, 10 CFR 50.55a Relief Request RP5-02 and RI5-02, Revision 22019-06-28028 June 2019 10 CFR 50.55a Relief Request RP5-02 and RI5-02, Revision 2 ML19092A1402019-04-29029 April 2019 Proposed Inservice Inspection Alternative PR5-02 NLS2018029, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RR5-032018-05-16016 May 2018 Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RR5-03 NLS2017032, 10 CFR 50.55a Request Number RI-21, Revision 12017-03-29029 March 2017 10 CFR 50.55a Request Number RI-21, Revision 1 ML16034A4792016-02-17017 February 2016 Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML16014A1742016-02-12012 February 2016 Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) ML16034A3032016-02-12012 February 2016 Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 ML15134A2422015-05-20020 May 2015 Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval ML12313A1112013-01-22022 January 2013 Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12233A1762012-08-28028 August 2012 Relief Request Nos. RV-07, Revision 0, and RV-01, Revision for Fourth 10-Day Inservice Inspection Interval Regarding Weld Overlay Repair NLS2011085, Relief Request from Certain Inservice Testing Code Requirements2011-08-24024 August 2011 Relief Request from Certain Inservice Testing Code Requirements ML1101205402011-02-18018 February 2011 Relief Request RI-36 for Alternative Weld Overlay Repairs for the Fourth 10-Year Inservice Inspection Interval ML1022204492010-10-0808 October 2010 Request for Relief No. RI-04 for the Fourth 10-Year Inservice Inspection Interval Regarding Inspection of Reactor Vessel Nozzle-to-Vessel Shell Welds ML1009703402010-04-26026 April 2010 Relief, Relief Request No. RV-06 from Certain Inservice Testing Requirements Related to Valves in the Control Rod Drive System, for Fourth 10-Year IST Interval NLS2010013, Request Relief from Certain Inservice Inspection (ISI) Code Requirements2010-02-0505 February 2010 Request Relief from Certain Inservice Inspection (ISI) Code Requirements NLS2010014, Request Relief from Certain Inservice Inspection Code Requirements2010-02-0505 February 2010 Request Relief from Certain Inservice Inspection Code Requirements NLS2009038, Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 02009-06-18018 June 2009 Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 0 ML0821304832008-08-15015 August 2008 Request for Relief No. Ri - 35 for Fourth Year Inservice Inspection Interval Regarding Weld Overlay Repair ML0802302882008-02-0606 February 2008 Request for Relief No. RI-29, Revision 1, for Fourth 10-Year Inservice Inspection Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds ML0631802502006-12-0505 December 2006 Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Vessel Code, Relief Request No. RI-06, Revision 3, for Weld HMC-BB-1 ML0630402412006-11-0303 November 2006 Correction to and Clarification on Safety Evaluation - Risk Informed Inservice Inspection Program for the Fourth 10-Year Interval; Relief Request No. RI-34 ML0628500512006-10-23023 October 2006 Risk-Informed Inservice Inspection Program for Fourth 10-Year Interval; Relief Request No. RI-34 ML0626202782006-10-13013 October 2006 Fourth 10-year Interval Inservice Inspection Request for Relief No. RI-15, Examination of Peripheral Control Rod Drive Housing Welds ML0625400642006-10-11011 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief RI-02 ML0622602032006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-04 ML0622601952006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-02 ML0622602172006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-06 ML0622602202006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-11 ML0623405482006-09-0808 September 2006 Relief, Request for Relief No. RI-13 Fourth 10-Year Interval Inservice Inspection ML0405603182004-02-25025 February 2004 Code Relief-RP-06-IST, Core Spray Pump CS-P-B, MB6821 NLS2003120, Inservice Testing Program Relief Request RP-06, Revision 22003-11-25025 November 2003 Inservice Testing Program Relief Request RP-06, Revision 2 ML0309003842003-03-31031 March 2003 Relief, Inservice Testing of All Pumps as Required by Asme/Ansi OMA-1988, Part 6, Paragraph 6.1, MB6822 2022-05-13
[Table view] Category:Letter type:NLS
MONTHYEARNLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022048, Management Change and Correspondence Update2022-11-0101 November 2022 Management Change and Correspondence Update NLS2022047, Core Operating Limits Report, Cycle 33, Revision 02022-10-14014 October 2022 Core Operating Limits Report, Cycle 33, Revision 0 NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2022-10-0707 October 2022 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2022037, Emergency Plan, Revision 80, Summary of 50.54(q) Analyses2022-08-18018 August 2022 Emergency Plan, Revision 80, Summary of 50.54(q) Analyses NLS2022035, Evacuation Time Estimate Report for Cooper Nuclear Station2022-08-16016 August 2022 Evacuation Time Estimate Report for Cooper Nuclear Station NLS2022031, Licensee Guarantees of Payment of Deferred Premiums2022-07-19019 July 2022 Licensee Guarantees of Payment of Deferred Premiums NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2022025, Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring2022-06-0606 June 2022 Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring NLS2022016, Annual Radiological Environmental Report2022-05-10010 May 2022 Annual Radiological Environmental Report NLS2022020, Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report2022-05-0202 May 2022 Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report NLS2022014, Annual Radioactive Effluent Release Report2022-04-27027 April 2022 Annual Radioactive Effluent Release Report NLS2022010, Annual Report of Individual Exposure Monitoring2022-04-0505 April 2022 Annual Report of Individual Exposure Monitoring NLS2022009, Property Insurance Coverage2022-03-23023 March 2022 Property Insurance Coverage NLS2022011, Preparation and Scheduling of Operator Licensing Examinations2022-03-18018 March 2022 Preparation and Scheduling of Operator Licensing Examinations NLS2022004, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 12022-02-0707 February 2022 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 1 NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20212022-01-20020 January 2022 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 NLS2021067, ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-16016 December 2021 ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan NLS2021069, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-12-15015 December 2021 Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021066, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 32021-12-10010 December 2021 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 3 NLS2021065, Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-012021-12-0606 December 2021 Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-01 NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements 2024-01-25
[Table view] |
Text
N Nebraska Public Power District "Always there when you need us" 10 CFR 50.55a NLS2009038 June 18, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
10 CFR 50.55a Request Number RV-06, Revision 0 Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
The purpose of this letter is to request that the Nuclear Regulatory Commission (NRC) grant Nebraska Public Power District (NPPD) relief from certain inservice test (IST) code requirements for Cooper Nuclear Station (CNS) pursuant to 10 CFR 50.55a. Specifically, this request provides relief from certain IST valve testing requirements as they pertain to check valves, solenoid operated valves, and air operated valves within the Control Rod Drive system.
10 CFR 50.55a Request Number RV-06, Revision 0 is applicable to the fourth ten-year IST interval, which began March 1, 2006. NPPD requests NRC approval of the attached request by June 28, 2010, which represents a standard twelve-month review period following the submittal.
Approval of this request is not needed to support currently scheduled work at CNS. However, it is needed to make the fourth ten-year interval IST program consistent with NUREG 1482, Revision 1. The NUREG states, in part, that specific relief is required to implement the guidance of Generic Letter 89-04 for those plants that are updating to later editions of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants.
The need for this request was identified during a recent self assessment and has been entered into the CNS corrective action program for resolution.
The underlying intent of the NUREG has and continues to be met. NPPD is submitting this request in order to ensure that the documentation requirements of the latest NRC guidance are met. RV-06, including the basis and details of this request, is provided in the attachment.
COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811/.Fax: (402) 825-5211 vww' .nppd.com
NLS2009038 Page 2 of 2 If you have any questions concerning this matter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.
Sincerely, Brian J. O'Grady Site Vice President
/dnm Attachment cc: Regional Administrator w/ attachment USNRC - Region IV Cooper Project Manager w/ attachment USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/ attachment USNRC - CNS NPG Distribution w/ attachment CNS Records w/ attachment
NLS2009038 Attachment Page 1 of 4 10 CFR 50.55a Request Number RV-06, Revision 0 CRD Technical Specification Testing Cooper Nuclear Station Docket No. 50-298, DPR-46 Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i)
--Alternative Provides Acceptable Level of Quality and Safety--
- 1. ASME Code Component(s) Affected Valve Class Category System CRD-SOV-SO120* 2 B CRD CRD-SOV-SO121* 2 B CRD CRD-SOV-SO122* 2 B CRD CRD-SOV-SO123* 2 B CRD CRD-AOV-CV126* 2 B CRD CRD-AOV-CV127* 2 B CRD CRD-CV-114CV* 2 C CRD CRD-CV-138CV* 2 C CRD
- Typical of 137 Hydraulic Control Units (HCUs)
- 2. Applicable Code Edition and Addenda American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) 2001 Edition through 2003 Addenda.
- 3. Applicable Code Requirement ASME OM Code ISTC-3500 Valve Testing Requirements - Active and passive valves in the categories defined in ISTC-1300 shall be tested in accordance with the paragraphs specified in Table ISTC-3500-1 and the applicable requirements of ISTC-5100 and ISTC-5200.
ISTC-3510 Exercising Test Frequency - Active Category A, Category B, and Category C check valves shall be exercised nominally every three (3) months except as provided by ISTC-3520, ISTC-3540, ISTC-3550, ISTC-3560, ISTC-5221, and ISTC-5222.
ISTC-3560 Fail-Safe Valves - Valves with fail-safe actuators shall be tested by observing the operation of the actuator upon loss of valve actuating power in accordance with the exercising frequency of ISTC-3510.
NLS2009038 Attachment Page 2 of 4 ISTC-5131 (a) Valve Stroke Testing - Active valves shall have their stroke times measured when exercised in accordance with ISTC-3500.
ISTC-5 15.1(a) Valve Stroke Testing - Active valves shall have their stroke times measured when exercised in accordance with ISTC-3500.
ISTC-522 1(a) Valve Actuator Movement - The necessary valve actuator movement during exercise testing shall be demonstrated by performing both an open and a close test.
- 4. Reason for Request Pursuant to 10 CFR 50.55a, "Codes and Standards," paragraph (a)(3), relief is requested from the requirements of ASME OM Code ISTC-3500, ISTC-3510, ISTC-3560, ISTC-5131 (a), ISTC-5151 (a), and ISTC-5221 (a). The proposed alternative would provide an acceptable level of quality and safety.
This relief is needed to make the fourth ten-year inservice test (IST) program consistent with NUREG 1482, Revision 1.
- 5. Proposed Alternative and Basis for Use Background Information It is typical for Boiling Water Reactors to perform the subject Control Rod Drive (CRD) testing per their respective plant Technical Specifications. However, the guidance for how this testing should be documented in the IST programs has changed. Generic Letter (GL) 89-04 and NUREG 1482, Revision 0, both stated that licensees were to document the use of GL 89-04, Position 7, in the IST program, but did not require that the documentation be in the form of a 10 CFR 50.55a request. Initially, for the fourth ten-year IST interval, Nebraska Public Power District (NPPD) continued to follow the guidance from GL 89-04 and NUREG 1482, Revision 0, by documenting the subject CRD testing in a Technical Position at Cooper Nuclear Station (CNS). However, during a recent self assessment, NPPD determined that CNS did not meet the latest Nuclear Regulatory Commission (NRC) guidance, NUREG 1482, Revision 1 (published January 2005). This NUREG states, in part, that specific relief is required to implement the guidance in GL 89-04 for those plants that are updating to later editions of the Code.
Although the underlying intent of the NUREG has and continues to be met, NPPD is submitting this request in order to ensure that the documentation requirements of the latest NRC guidance are met. The proposed alternatives and the basis for use are discussed in further detail below.
NLS2009038 Attachment Page 3 of 4 CRD-CV-138CV; CRD-SOV-SO120, SO121, S0122, S0123:
The CRD cooling water header check valve (typical of 137 HCUs) has a safety function to close in the event of a scram to prevent diversion of pressurized HCU accumulator water to the cooling water header. The withdrawal and exhaust solenoid valves (typical of 137) have a safety function to close in order to provide a boundary to non-code class piping.
Normal control rod motion will verify that the associated cooling water check valve has moved to its safety function position of closed. Industry experience has shown that rod motion may not occur if this check valve were to fail in the open position.
The solenoid valves listed above have a safety function to close in order to provide a class 2 to non-code class boundary isolation. During normal operation, these solenoid valves are used for control rod insertion and withdrawal. They are exercised open and closed during normal operation of the associated CRD. They are not equipped with position indication or control switches. They automatically change position to affect control rod movement.
Therefore, control rod exercising in accordance with the CNS Technical Specifications, Surveillance Requirement (SR) 3.1.3.2 and SR 3.1.3.3, will provide an acceptable level of quality and safety for these valves. This testing method is consistent with GL 89-04, Position 7, and NUREG 1482, Revision 1, Section 4.4.6.
CRD-AOV-CV 126, CRD-AOV-CV127, and CRD-CV-l 14CV:
These valves operate as an integral part of their respective HCU to rapidly insert the control rods in support of a scram. The CRD scram inlet valve, CRD-AOV-CV126 (typical of 137), opens with a scram signal to pressurize the lower side of the Control Rod Drive Mechanism (CRDM) pistons from the accumulator or from the charging water header. The CRD outlet isolation valve, CRD-AOV-CV127 (typical of 137), opens with scram signal to vent the top of the CRDM piston to the scram discharge header. The CRD scram outlet check valve, CRD-CV- 114CV (typical of 137), opens to allow flow from the top of the CRDM piston to the scram discharge header.
Individual stroke time measurements of air-operated valves CRD-AOV-CV126 and CRD-AOV-CV127 are impractical due to their rapid acting operation and they are not equipped with position indication. Therefore, valve stroke times will not be measured.
Additionally, the air-operated valves fail-open on a loss of air or power. Normal opening removes power to the pilot solenoid valve, simulating a loss of power. On loss of power, the solenoid vents the air operator and CRD-AOV-CV126 and CRD-AOV-CV 127 are spring-driven open. Thus, each time a scram signal is given, the valves "experience" a loss of air/power to verify each valve's fail-safe open feature.
NLS2009038 Attachment Page 4 of 4 Testing these valves simultaneously would result in a full reactor scram. An excess number of scrams performed routinely could cause thermal and reactivity transients, which could lead to fuel, vessel, CRD, or piping damage. The CRDs cannot be tested during cold shutdown because the control rods are inserted and must remain inserted.
Therefore, control rod scram time testing in accordance with the CNS Technical Specifications, SR 3.1.4.1 and SR 3.1.4.2, will provide an acceptable level of quality and safety for these valves. This testing method for these valves is consistent with GL 89-04, Position 7, and NUREG 1482, Revision 1, Section 4.4.6.
- 6. Duration of Proposed Alternative This proposed alternative will be utilized for the entire fourth ten-year interval.
- 7. Precedents This 10 CFR 50.55a request combines previously approved relief requests (RV-02, RV-03, and RV-05) for the third ten-year interval at CNS (TAC No. M94530, February 19, 1997). Other approved industry 10 CFR 50.55a requests also exist for similar alternative testing: Fermi-2 Request VRR-009 (TAC No. MA6390, February 17, 2000) and Perry-I Request VR-I (TAC No. MB1300, June 7, 2001).
ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS@
Correspondence Number: NLS2009038 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any, associated regulatory commitments.
COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None N/A N/A t I A