Category:Code Relief or Alternative
MONTHYEARML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 NLS2020053, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-042020-08-26026 August 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-04 NLS2019034, 10 CFR 50.55a Relief Request RP5-02 and RI5-02, Revision 22019-06-28028 June 2019 10 CFR 50.55a Relief Request RP5-02 and RI5-02, Revision 2 ML19092A1402019-04-29029 April 2019 Proposed Inservice Inspection Alternative PR5-02 NLS2018029, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RR5-032018-05-16016 May 2018 Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RR5-03 NLS2017032, 10 CFR 50.55a Request Number RI-21, Revision 12017-03-29029 March 2017 10 CFR 50.55a Request Number RI-21, Revision 1 ML16034A4792016-02-17017 February 2016 Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML16014A1742016-02-12012 February 2016 Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) ML16034A3032016-02-12012 February 2016 Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 ML15134A2422015-05-20020 May 2015 Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval ML12313A1112013-01-22022 January 2013 Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12233A1762012-08-28028 August 2012 Relief Request Nos. RV-07, Revision 0, and RV-01, Revision for Fourth 10-Day Inservice Inspection Interval Regarding Weld Overlay Repair NLS2011085, Relief Request from Certain Inservice Testing Code Requirements2011-08-24024 August 2011 Relief Request from Certain Inservice Testing Code Requirements ML1101205402011-02-18018 February 2011 Relief Request RI-36 for Alternative Weld Overlay Repairs for the Fourth 10-Year Inservice Inspection Interval ML1022204492010-10-0808 October 2010 Request for Relief No. RI-04 for the Fourth 10-Year Inservice Inspection Interval Regarding Inspection of Reactor Vessel Nozzle-to-Vessel Shell Welds ML1009703402010-04-26026 April 2010 Relief, Relief Request No. RV-06 from Certain Inservice Testing Requirements Related to Valves in the Control Rod Drive System, for Fourth 10-Year IST Interval NLS2010013, Request Relief from Certain Inservice Inspection (ISI) Code Requirements2010-02-0505 February 2010 Request Relief from Certain Inservice Inspection (ISI) Code Requirements NLS2010014, Request Relief from Certain Inservice Inspection Code Requirements2010-02-0505 February 2010 Request Relief from Certain Inservice Inspection Code Requirements NLS2009038, Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 02009-06-18018 June 2009 Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 0 ML0821304832008-08-15015 August 2008 Request for Relief No. Ri - 35 for Fourth Year Inservice Inspection Interval Regarding Weld Overlay Repair ML0802302882008-02-0606 February 2008 Request for Relief No. RI-29, Revision 1, for Fourth 10-Year Inservice Inspection Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds ML0631802502006-12-0505 December 2006 Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Vessel Code, Relief Request No. RI-06, Revision 3, for Weld HMC-BB-1 ML0630402412006-11-0303 November 2006 Correction to and Clarification on Safety Evaluation - Risk Informed Inservice Inspection Program for the Fourth 10-Year Interval; Relief Request No. RI-34 ML0628500512006-10-23023 October 2006 Risk-Informed Inservice Inspection Program for Fourth 10-Year Interval; Relief Request No. RI-34 ML0626202782006-10-13013 October 2006 Fourth 10-year Interval Inservice Inspection Request for Relief No. RI-15, Examination of Peripheral Control Rod Drive Housing Welds ML0625400642006-10-11011 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief RI-02 ML0622602032006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-04 ML0622601952006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-02 ML0622602172006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-06 ML0622602202006-10-0202 October 2006 Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-11 ML0623405482006-09-0808 September 2006 Relief, Request for Relief No. RI-13 Fourth 10-Year Interval Inservice Inspection ML0405603182004-02-25025 February 2004 Code Relief-RP-06-IST, Core Spray Pump CS-P-B, MB6821 NLS2003120, Inservice Testing Program Relief Request RP-06, Revision 22003-11-25025 November 2003 Inservice Testing Program Relief Request RP-06, Revision 2 ML0309003842003-03-31031 March 2003 Relief, Inservice Testing of All Pumps as Required by Asme/Ansi OMA-1988, Part 6, Paragraph 6.1, MB6822 2022-05-13
[Table view] Category:Letter
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] Category:Safety Evaluation
MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21040A3002021-03-29029 March 2021 Issuance of Amendment No. 269 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20314A2352020-12-0202 December 2020 Issuance of Amendment No. 268 Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, Using the Consolidated Line Item Improvement Process ML20282A1762020-10-22022 October 2020 Issuance of Amendment No. 267 Regarding Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML20255A2172020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML20077L3392020-03-19019 March 2020 Proposed Inservice Inspection Alternatives RP5-02 and RI5-02 ML19352G1942020-01-28028 January 2020 Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML19238A0072019-10-30030 October 2019 Issuance of Amendment No. 263 Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML19079A0702019-05-0707 May 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4384; EPID No. L-2014-JLD-0046) ML19092A1402019-04-29029 April 2019 Proposed Inservice Inspection Alternative PR5-02 ML18348B1032019-02-21021 February 2019 Issuance of Amendment No. 262 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18218A4832018-09-0606 September 2018 Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio ML18186A5492018-08-0101 August 2018 Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) ML18183A3252018-07-31031 July 2018 Requests for Relief Associated with - the Fifth 10-year Inservice Inspection Interval Program (CAC Nos. MG0175 Through MG0179; Epids L-2017-LLR-0062 Through L-2017-LLR-0066) ML18064A1022018-03-22022 March 2018 Request No. RI-21, Revision 1 - Request for Relief Concerning Examinations for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9623; EPID L-2017-LLR-0026) ML17226A0322017-09-20020 September 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17144A0822017-06-20020 June 2017 Issuance of Amendment No. 259 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17061A0502017-03-31031 March 2017 Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, ML16272A1372016-10-17017 October 2016 Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio ML16158A0222016-07-25025 July 2016 Issuance of Amendment No. 256 to Relocate the Pressure-Temperature Curves to a Pressure-Temperature Limits Report ML16146A7492016-07-25025 July 2016 Issuance of Amendment No. 255 Replacement of Technical Specification Figure 4.1-1 with Text ML16119A4332016-07-25025 July 2016 Issuance of Amendment No. 254 Adoption of Technical Specification Task Force Change Traveler TSFT-535, Revision 0 ML16048A3402016-02-24024 February 2016 Request for Inservice Inspection Program Alternative RP5-01 for Implementation of Code Case N-795 ML16042A3262016-02-24024 February 2016 Request for Relief RR5-01, Alternative Weld Overlay Repair for a Dissimilar Metal Weld Joining Nozzle to Control Rod Drive End Cap in Lieu of Specific ASME Boiler and Pressure Vessel Code Requirements ML16034A4792016-02-17017 February 2016 Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements ML16034A3032016-02-12012 February 2016 Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 ML16014A1742016-02-12012 February 2016 Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) ML15343A3012016-01-22022 January 2016 Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function ML15216A2592015-08-27027 August 2015 Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water ML15168A1712015-07-14014 July 2015 Issuance of Amendment No. 251, Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications ML15135A0052015-05-29029 May 2015 Issuance of Amendment No. 250, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-413, Elimination of Requirements for a Post Accident Sampling System (PASS) ML15134A2422015-05-20020 May 2015 Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval ML14365A0932015-01-13013 January 2015 Correction to Safety Evaluation Dated December 12, 2014, Regarding Amendment No. 249, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14323A6442014-12-12012 December 2014 Issuance of Amendment No. 249, Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14190A0042014-07-25025 July 2014 Redacted, Review of License Renewal Commitment Review Related to Core Plate Hold Down Bolt Inspection Plan and Analysis (TAC Nos. ME9550 and MF3557) ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML13263A1532013-10-0707 October 2013 Correction to Amendment No. 247 Issued 9/12/13, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13191A1052013-09-12012 September 2013 Issuance of Amendment No. 247, Revise License Condition 2.E to Require All License Renewal Commitments Will Be Incorporated Into the Updated Safety Analysis Report ML13148A2252013-06-26026 June 2013 Issuance of Amendment No. 246, Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13143A3452013-06-0606 June 2013 Safety Assessment in Response to Information Request Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13032A5262013-02-22022 February 2013 Issuance of Amendment No. 245, Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML12313A1112013-01-22022 January 2013 Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval 2024-01-03
[Table view] |
Text
October 2, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P.O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION RE: FOURTH 10-YEAR INTERVAL INSERVICE INSPECTION REQUEST FOR RELIEF NO. PR-11 (TAC NO. MD0515)
Dear Mr. Edington:
By letter dated February 23, 2006, Nebraska Public Power District (the licensee) submitted Relief Request No. PR-11, related to the Fourth 10-Year Interval Inservice Inspection (ISI)
Program for the Cooper Nuclear Station. In Relief Request PR-11, the licensee proposed to perform a system leakage test of American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Class 1 pressure retaining components in reactor coolant pressure boundary vent, drain, and branch lines and small bore connections (#1 inch) with the isolation valves closed, which would cause a small segment of Class 1 line to be excluded from the test boundary.
Based on the information provided in Relief Request No. PR-11, the Nuclear Regulatory Commission (NRC) staff concluded in the enclosed safety evaluation that the licensees proposed alternative provides reasonable assurance of operational readiness, and compliance with the ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(ii), the NRC staff authorizes the ISI program alternative proposed in Relief Request No. PR-11 for the fourth 10-year ISI interval for the Cooper Nuclear Station.
Sincerely,
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosure:
Safety Evaluation cc w/encl: See next page
October 2, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P.O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION RE: FOURTH 10-YEAR INTERVAL INSERVICE INSPECTION REQUEST FOR RELIEF NO. PR-11 (TAC NO. MD0515)
Dear Mr. Edington:
By letter dated February 23, 2006, Nebraska Public Power District (the licensee) submitted Relief Request No. PR-11, related to the Fourth 10-Year Interval Inservice Inspection (ISI)
Program for the Cooper Nuclear Station. In Relief Request PR-11, the licensee proposed to perform a system leakage test of American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Class 1 pressure retaining components in reactor coolant pressure boundary vent, drain, and branch lines and small bore connections (#1 inch) with the isolation valves closed, which would cause a small segment of Class 1 line to be excluded from the test boundary.
Based on the information provided in Relief Request No. PR-11, the Nuclear Regulatory Commission (NRC) staff concluded in the enclosed safety evaluation that the licensees proposed alternative provides reasonable assurance of operational readiness, and compliance with the ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(ii), the NRC staff authorizes the ISI program alternative proposed in Relief Request No. PR-11 for the fourth 10-year ISI interval for the Cooper Nuclear Station.
Sincerely,
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosure:
Safety Evaluation cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsAcrsAcnwMailCenter JLamb, EDO RIV LPLIV R/F RidsRgn4MailCenter (KKennedy) PPatniak RidsNrrDorl (CHaney/CHolden) RidsOgcRp RidsNrrDorlLpl4 (DTerao) RidsNrrLALFeizollahi RidsNrrPMBBenney Accession Number: ML062260220 OFFICE LPL4/PM LPL4/LA CFEB/BC OGC LPL4/BC NAME BBenney LFeizollahi K Gruss TCampbell DTerao DATE 9/20/06 9/6/06 9/7/06 7/18/06 10/2/06 OFFICIAL RECORD COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FOURTH 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM REQUEST FOR RELIEF PR-11 NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298
1.0 INTRODUCTION
By letter dated February 23, 2006, Nebraska Public Power District (NPPD or the licensee) submitted Relief Request No. PR-11, related to the Fourth 10-Year Interval Inservice Inspection (ISI) Program for the Cooper Nuclear Station (CNS). In Relief Request PR-11, the licensee proposed to perform a system leakage test of American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Class 1 pressure retaining components in reactor coolant pressure boundary (RCPB) vent, drain, and branch (VTDB) lines and small bore connections (#1 inch) with the isolation valves closed, which would cause a small segment of Class 1 line to be excluded from the test boundary. The licensees request for relief is based on the hardship of making multiple entries into the drywell for the valve alignment. Multiple entries would expose personnel to high radiation and the risk of failure due to single valve isolation. The Nuclear Regulatory Commission (NRC) staff has evaluated the licensees request for relief pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(a)(3)(ii) and has determined that compliance with the Code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.0 REGULATORY EVALUATION
10 CFR 50.55a(g) requires that ISI of ASME Code Class 1, 2, and 3 components be performed in accordance with Section XI of the ASME Code and applicable addenda, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i).
According to 10 CFR 50.55a(a)(3), alternatives to the requirements of section 50.55a(g) may be used, when authorized by the NRC, if an applicant demonstrates that the proposed alternatives would provide an acceptable level of quality and safety or if the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components, to the extent practical within the
limitations of design, geometry, and materials of construction of the components. The regulations require that ISI of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ISI Code of Record for the fourth 10-year inspection interval for CNS is the 2001 Edition through the 2003 Addenda of the ASME Code,Section XI.
3.0 BACKGROUND
DISCUSSION System/Component(s) for Which Relief is Requested RCPB VTDB lines and small bore connections (#1 inch).
ASME Code Requirements The 2001 Edition through the 2003 Addenda of ASME Code,Section XI, Table IWB-2500-1, Examination Category B-P (B15.50 and B15.70) requires the system leakage test include all ASME Code Class 1 piping and valves within the pressure retaining boundary.
Licensees Request for Relief Relief is requested from performing the system leakage test in accordance with the requirements of the 2001 Edition of the ASME Code, 2003 Addenda, Subsection IWB-2500, Table 2500-1 for the portion of the ASME Code Class 1 RCPB VTDB line and connection with the isolation valves closed, which would cause a small segment of Class 1 line to be excluded from the test boundary.
Licensees Basis for Requesting Relief The VTDB lines and connections 1-inch nominal pipe size and smaller off the RCPB are equipped with manual valves, which provide double valve isolation of the RCPB. Repositioning the inboard manual valves before and after the test will take considerable time and will result in an unnecessary increase in dose to plant personnel. Manual operation (opening and closing) of the VTDB valves is estimated to expose plant personnel to 0.5 man-rem per test. The requirement to extend the system leakage test boundary for the leakage test conducted at or near the end of each inspection interval to the outboard valve on these VTDB connections results in a hardship without a compensating increase in the level of quality and safety.
The 1-inch nominal pipe size and smaller VTDB connections are normally closed during plant operation. The outboard valves would only experience pressure if the inboard valve is open or leaks by the seat. Seat leakage, although undesirable, is not indicative of a flaw in the pressure boundary. Furthermore, these valves are in close proximity to the main runs of pipe. The non-isolable portion of these VTDB connections is pressurized and VT-2 examined during the test.
The VT-2 examination performed each refueling outage extends to the outboard valve, even though it is not pressurized.
The CNS technical specifications (TSs) for RCPB leakage monitoring require appropriate actions, including plant shutdown if leakage exceeds specified limits. Based on the above,
NPPD requests approval to use the proposed alternative in lieu of the ASME Section XI, IWB-5222(b), requirements.
Licensees Proposed Alternative The RCPB VTDB lines and connections 1-inch nominal pipe size and smaller will be visually examined for leakage with the inboard isolation valves in the normally closed position during the system leakage test conducted at or near the end of each inspection interval IWB-5222(b).
This test provides reasonable assurance of the structural integrity of the VTDB lines and connections.
4.0 TECHNICAL EVALUATION
The ASME Code,Section XI of Record requires that all Class 1 components within the reactor coolant system (RCS) boundary undergo a system leakage test at the end of each refueling outage and a system hydrostatic test at or near the end of each inspection interval. In Relief Request No. PR-11, the licensee proposed an alternative to the required testing of the RCPB VTDB lines, which would cause some line segments to be excluded from the test boundary.
The line segments include two manually operated valves separated by a short pipe that is connected to the RCS. The line configuration, as outlined, provides double-isolation of the RCS. Under normal plant operating conditions, the subject line segments would experience RCS temperature and pressure only if leakage through the inboard valves occurs. For the licensee to perform the ASME Code-required test, it would be necessary to manually open the inboard valves to pressurize the line segments. Pressurization by this method would preclude the RCS double valve isolation and may cause safety concerns for the personnel performing the examination.
Typical line/valve configurations are in close proximity of the RCPB main runs of pipe and thus, would require personnel entry into high radiation areas within the containment. Manual actuation (opening and closing) of these valves is estimated to expose plant personnel to 0.5 man-rem per test. The licensee proposed to visually examine the isolation valves in the normally closed position for leaks and any evidence of past leakage during system leakage test after each refueling outage. Also, the RCS vent and drain connections will be visually examined with the isolation valves in the normally closed position during the 10-year system hydrostatic test. The NRC staff believes that the licensees proposed alternative will provide reasonable assurance of operational readiness for the RCPB VTDB line segments while keeping personnel radiation exposure as low as reasonably achievable. The NRC staff has further determined that compliance with the Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
5.0 CONCLUSION
Based on the NRC staffs evaluation of the request for relief, the licensees proposed alternative provides reasonable assurance of operational readiness, and compliance with the ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(ii), the proposed alternative in Relief Request No. PR-11 is authorized for the fourth 10-year ISI interval of CNS.
All other requirements of the ASME Code,Section XI for which relief has not been specifically
requested remain applicable, including a third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: P. Patniak Date: October 2, 2006
Cooper Nuclear Station cc:
Mr. William J. Fehrman Senior Resident Inspector President and Chief Executive Officer U.S. Nuclear Regulatory Commission Nebraska Public Power District P. O. Box 218 1414 15th Street Brownville, NE 68321 Columbus, NE 68601 Regional Administrator, Region IV Mr. Gene Mace U.S. Nuclear Regulatory Commission Nuclear Asset Manager 611 Ryan Plaza Drive, Suite 400 Nebraska Public Power District Arlington, TX 76011 P.O. Box 98 Brownville, NE 68321 Director, Missouri State Emergency Management Agency Mr. John C. McClure P. O. Box 116 Vice President and General Counsel Jefferson City, MO 65102-0116 Nebraska Public Power District P. O. Box 499 Chief, Radiation and Asbestos Columbus, NE 68602-0499 Control Section Kansas Department of Health Mr. Paul V. Fleming and Environment Licensing Manager Bureau of Air and Radiation Nebraska Public Power District 1000 SW Jackson P.O. Box 98 Suite 310 Brownville, NE 68321 Topeka, KS 66612-1366 Mr. Michael J. Linder, Director Mr. Daniel K. McGhee Nebraska Department of Environmental Bureau of Radiological Health Quality Iowa Department of Public Health P. O. Box 98922 Lucas State Office Building, 5th Floor Lincoln, NE 68509-8922 321 East 12th Street Des Moines, IA 50319 Chairman Nemaha County Board of Commissioners Mr. Keith G. Henke, Planner Nemaha County Courthouse Division of Community and Public Health 1824 N Street Office of Emergency Coordination Auburn, NE 68305 930 Wildwood P.O. Box 570 Jefferson City, MO 65102 Ms. Julia Schmitt, Manager Radiation Control Program Jerry C. Roberts, Director of Nuclear Nebraska Health & Human Services R & L Safety Assurance Public Health Assurance Nebraska Public Power District 301 Centennial Mall, South P.O. Box 98 P.O. Box 95007 Brownville, NE 68321 Lincoln, NE 68509-5007 Mr. John F. McCann, Director Mr. H. Floyd Gilzow Licensing, Entergy Nuclear Northeast Deputy Director for Policy Entergy Nuclear Operations, Inc.
Missouri Department of Natural Resources 440 Hamilton Avenue P. O. Box 176 White Plains, NY 10601-1813 Jefferson City, MO 65102-0176 February 2006