Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22111A138 | 13 May 2022 | Proposed Inservice Testing Alternative RS-01, Revision 0 | Incorporated by reference Grace period |
NLS2020053, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-04 | 26 August 2020 | Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, Relief Request RR5-04 | Incorporated by reference |
NLS2019034, 10 CFR 50.55a Relief Request RP5-02 and RI5-02, Revision 2 | 28 June 2019 | 10 CFR 50.55a Relief Request RP5-02 and RI5-02, Revision 2 | VT-2 Through-Wall Leak |
ML19092A140 | 29 April 2019 | Proposed Inservice Inspection Alternative PR5-02 | VT-2 Through-Wall Leak |
NLS2018029, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RR5-03 | 16 May 2018 | Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RR5-03 | |
NLS2017032, 10 CFR 50.55a Request Number RI-21, Revision 1 | 29 March 2017 | 10 CFR 50.55a Request Number RI-21, Revision 1 | VT-2 Liquid penetrant |
ML16034A479 | 17 February 2016 | Request for Relief RI5-02, Alternative to Use Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of Specific ASME Code Requirements | Incorporated by reference Aging Management |
ML16014A174 | 12 February 2016 | Request for Relief RP-01 Through RP-09, RV-01 Through RV-05, and RG-01 Alternative to ASME OM Code Requirements for Inservice Testing for the Fifth Ten-Year Program Interval (CAC Nos. MF5911, MF5913, MF5914, MF5915, MF5916, Etc.) | Stroke time Incorporated by reference Power-Operated Valves Grace period |
ML16034A303 | 12 February 2016 | Request for Relief RC3-01 for Alignment of Inservice Inspection and Containment Inservice Inspection (CAC No. MF6333 | Incorporated by reference |
ML15134A242 | 20 May 2015 | Relief Request RI-08, Revision 0, Relief from Reactor Vessel Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections, for the Fourth 10-Year Inservice Inspection Interval | Incorporated by reference |
ML12313A111 | 22 January 2013 | Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval | Incorporated by reference |
ML12233A176 | 28 August 2012 | Relief Request Nos. RV-07, Revision 0, and RV-01, Revision for Fourth 10-Day Inservice Inspection Interval Regarding Weld Overlay Repair | Stroke time Weld Overlay Incorporated by reference |
NLS2011085, Relief Request from Certain Inservice Testing Code Requirements | 24 August 2011 | Relief Request from Certain Inservice Testing Code Requirements | Power-Operated Valves |
ML110120540 | 18 February 2011 | Relief Request RI-36 for Alternative Weld Overlay Repairs for the Fourth 10-Year Inservice Inspection Interval | Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Finite Element Analysis Dissimilar Metal Weld |
ML102220449 | 8 October 2010 | Request for Relief No. RI-04 for the Fourth 10-Year Inservice Inspection Interval Regarding Inspection of Reactor Vessel Nozzle-to-Vessel Shell Welds | Incorporated by reference |
ML100970340 | 26 April 2010 | Relief, Relief Request No. RV-06 from Certain Inservice Testing Requirements Related to Valves in the Control Rod Drive System, for Fourth 10-Year IST Interval | Stroke time |
NLS2010013, Request Relief from Certain Inservice Inspection (ISI) Code Requirements | 5 February 2010 | Request Relief from Certain Inservice Inspection (ISI) Code Requirements | Non-Destructive Examination Weld Overlay Hydrostatic Finite Element Analysis Liquid penetrant Dissimilar Metal Weld |
NLS2010014, Request Relief from Certain Inservice Inspection Code Requirements | 5 February 2010 | Request Relief from Certain Inservice Inspection Code Requirements | |
NLS2009038, Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 0 | 18 June 2009 | Relief Request from Certain Inservice Test Code Requirements, RV-06, Revision 0 | Stroke time |
ML082130483 | 15 August 2008 | Request for Relief No. Ri - 35 for Fourth Year Inservice Inspection Interval Regarding Weld Overlay Repair | Non-Destructive Examination Weld Overlay Hydrostatic Dissimilar Metal Weld |
ML080230288 | 6 February 2008 | Request for Relief No. RI-29, Revision 1, for Fourth 10-Year Inservice Inspection Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds | Hydrostatic Operator Manual Action Incorporated by reference Large early release frequency |
ML063180250 | 5 December 2006 | Request for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Vessel Code, Relief Request No. RI-06, Revision 3, for Weld HMC-BB-1 | Incorporated by reference |
ML063040241 | 3 November 2006 | Correction to and Clarification on Safety Evaluation - Risk Informed Inservice Inspection Program for the Fourth 10-Year Interval; Relief Request No. RI-34 | Probabilistic Risk Assessment Large early release frequency Exemption Request |
ML062850051 | 23 October 2006 | Risk-Informed Inservice Inspection Program for Fourth 10-Year Interval; Relief Request No. RI-34 | Probabilistic Risk Assessment Large early release frequency Exemption Request |
ML062620278 | 13 October 2006 | Fourth 10-year Interval Inservice Inspection Request for Relief No. RI-15, Examination of Peripheral Control Rod Drive Housing Welds | VT-2 Incorporated by reference |
ML062540064 | 11 October 2006 | Fourth 10-Year Interval Inservice Inspection Request for Relief RI-02 | |
ML062260203 | 2 October 2006 | Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-04 | Hydrostatic VT-2 Incorporated by reference |
ML062260195 | 2 October 2006 | Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-02 | Hydrostatic VT-2 Incorporated by reference |
ML062260217 | 2 October 2006 | Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-06 | VT-2 Incorporated by reference Through-Wall Leak |
ML062260220 | 2 October 2006 | Fourth 10-Year Interval Inservice Inspection Request for Relief No. PR-11 | High Radiation Area Hydrostatic VT-2 Incorporated by reference |
ML062340548 | 8 September 2006 | Relief, Request for Relief No. RI-13 Fourth 10-Year Interval Inservice Inspection | Incorporated by reference |
ML040560318 | 25 February 2004 | Code Relief-RP-06-IST, Core Spray Pump CS-P-B, MB6821 | Incorporated by reference |
NLS2003120, Inservice Testing Program Relief Request RP-06, Revision 2 | 25 November 2003 | Inservice Testing Program Relief Request RP-06, Revision 2 | |
ML030900384 | 31 March 2003 | Relief, Inservice Testing of All Pumps as Required by Asme/Ansi OMA-1988, Part 6, Paragraph 6.1, MB6822 | Incorporated by reference |