July 2003 Monthly Operating Report for Indian Point Unit 2
ML032260278
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/12/2003
From: Dacimo F
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-131
Download: ML032260278 (6)


Text

Ad Entergy Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway, Sufte 1 P.O. Box 249 Buchanan, NY 10511-0249 Tel 9147345340 Fax 914 734 5718 Fred Dacimo Vice President, Operations August 12, 2003 Re:

Indian Point, Unit No. 2 Docket No. 50-247 NL-03-131 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-P1 -17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for July 2003

Dear Sir:

This letter provides the Monthly Operating Report for Indian Point 2 for the month of July 2003, in accordance with Technical Specification 6.9.1.7. There are no commitments contained in this correspondence.

Should you or your staff have any questions regarding this matter, please contact Mr. John McCann, Manager, Licensing, Indian Point Energy Center at (914) 734-5074.

Sincerely, Fred R. Dacimo Vice President, Operations Indian Point Energy Center

NL-03-131 Page 2 of 2 Attachments cc:

Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1498 Mr. Patrick D. Milano, Project Manager Project Directorate I Division of Reactor Projects I/Il U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 38 Buchanan, NY 10511-0038 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223

NL-03-1 31 Monthly Operating Report Page 1 of 4 OPERATING DATA REPORT DOCKET NO.

50-247 DATE August 5, 2003 COMPLETED BY S. Smith TELEPHONE (914)714-8304 OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

8.

Unit Name:

INDIAN POINT UNIT No. 2 Notes Reporting Period:

July-2003 Licensed Thermal Power ( MWt):

3114.4 Nameplate Rating (Gross Mwe ):

1008 Design Electrical Rating ( Net Mwe):

993 Maximum Dependable Capacity ( Gross Mwe):

988 Maximum Dependable Capacity ( Net Mwe):

956 If Changes Occur in Capacity Ratings ( Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, If Any (Net Mwe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated ( MWH)
17. Gross Electrical Energy Generated ( MWH)
18. Net Electrical Energy Generated ( MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor ( Using MDC Net)
22. Unit Capacity Factor ( Using DER Net)
23. Unit Forced Outage Rate 744 744 0

744 0

2,316,516 743,063 717,391 100.0 100.0 100.9 97.1 0

5,087 5,053.68 0

5,041.78 0

15,502,058 5,082,733 4,913,240 99.1 99.1 101.9 97.7 0.9 254,952 179,555.30 4,566.64 175,614.08 0

495,945,177 155,161,089 148,692,712 68.9 68.9 65.2 63.0 13.5

24. Shutdowns Scheduled Over Next 6 Months ( Type, Date, and Duration Of Each):
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
26. Units In Test Status ( Prior to Commercial Operation ):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

- N/A N/A N/A N/A N/A N/A (9/7)

NL-03-1 31 Monthly Operating Report Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-247 UNIT I.P. Unit #2 DATE August 5,2003 COMPLETED BY S. Smith TELEPHONE (914)714-8304 MONTH July-2003 DAY AVERAGE DAILY POWER LEVEL (MWC-Nct) 1 974 2

972 3

971 4

971 5

967 6

968 7

968 8

964 9

965 10 966 11 966 12 963 13 966 14 963 15 964 16 963 DAY AVERAGE DAILY POWER LEVEL (MWe-Nc) 17 963 18 963 19 962 20 962 21 960 22 962 23 962 24 962 25 961 26 962 27 963 28 962 29 959 30 960 31 959 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9M77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH July-2003 NL-03-1 31 Monthly Operating Report Page 3 of 4 DOCKET NO.

50-247 UNIT I.P. Unit #2 DATE August 5, 2003 COMPLETED BY S. Smith TELEPHONE (914)714-8304 0

o~~~

~~

1*

Licensee No.

Date Event l

Cause & Corrective Action to Prevent Recurrence

=

~

R-o r=

1 F: Forced S: Scheduled 2

Reason:

A - Equipment Failure ( Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error ( Explain)

H - Other ( Explain )

3 Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Other ( Explain) 4 Exibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report ( LER) File (NUREG-0161 )

5 Exibit I - Same Source (9/77)

Docket No. 50247 NL-03-131 Monthly Operating Report Page4of4 Summary Of Operatina Experience July 2003 Indian Point Unit No. 2 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical generation of 743,063 MWH.