Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway, Sufte 1 Ad Entergy P.O. Box 249 Buchanan, NY 10511-0249 Tel 9147345340 Fax 914 734 5718 Fred Dacimo Vice President, Operations August 12, 2003 Re: Indian Point, Unit No. 2 Docket No. 50-247 NL-03-131 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-P1 -17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for July 2003

Dear Sir:

This letter provides the Monthly Operating Report for Indian Point 2 for the month of July 2003, in accordance with Technical Specification 6.9.1.7. There are no commitments contained in this correspondence.

Should you or your staff have any questions regarding this matter, please contact Mr. John McCann, Manager, Licensing, Indian Point Energy Center at (914) 734-5074.

Sincerely, Fred R. Dacimo Vice President, Operations Indian Point Energy Center

NL-03-131 Page 2 of 2 Attachments cc:

Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1498 Mr. Patrick D. Milano, Project Manager Project Directorate I Division of Reactor Projects I/Il U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 38 Buchanan, NY 10511-0038 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223

NL-03-1 31 Monthly Operating Report Page 1 of 4 OPERATING DATA REPORT DOCKET NO. 50-247 DATE August 5, 2003 COMPLETED BY S. Smith TELEPHONE (914)714-8304 OPERATING STATUS

1. Unit Name: INDIAN POINT UNIT No. 2 Notes
2. Reporting Period: July-2003
3. Licensed Thermal Power ( MWt): 3114.4
4. Nameplate Rating (Gross Mwe ): 1008
5. Design Electrical Rating ( Net Mwe): 993
6. Maximum Dependable Capacity ( Gross Mwe): 988
7. Maximum Dependable Capacity ( Net Mwe): 956
8. If Changes Occur in Capacity Ratings ( Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net Mwe):
10. Reasons For Restrictions , If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 5,087 254,952
12. Number Of Hours Reactor Was Critical 744 5,053.68 179,555.30
13. Reactor Reserve Shutdown Hours 0 0 4,566.64
14. Hours Generator On-Line 744 5,041.78 175,614.08
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated ( MWH) 2,316,516 15,502,058 495,945,177
17. Gross Electrical Energy Generated ( MWH) 743,063 5,082,733 155,161,089
18. Net Electrical Energy Generated ( MWH) 717,391 4,913,240 148,692,712
19. Unit Service Factor 100.0 99.1 68.9
20. Unit Availability Factor 100.0 99.1 68.9
21. Unit Capacity Factor ( Using MDC Net) 100.9 101.9 65.2
22. Unit Capacity Factor ( Using DER Net) 97.1 97.7 63.0
23. Unit Forced Outage Rate 0 0.9 13.5
24. Shutdowns Scheduled Over Next 6 Months ( Type, Date, and Duration Of Each):
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
26. Units In Test Status ( Prior to Commercial Operation ): Forecast Achieved INITIAL CRITICALITY - N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A (9/7)

NL-03-1 31 Monthly Operating Report Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-247 UNIT I.P. Unit #2 DATE August 5,2003 COMPLETED BY S. Smith TELEPHONE (914)714-8304 MONTH July-2003 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWC-Nct) (MWe-Nc) 1 974 17 963 2 972 18 963 3 971 19 962 4 971 20 962 5 967 21 960 6 968 22 962 7 968 23 962 8 964 24 962 9 965 25 961 10 966 26 962 11 966 27 963 12 963 28 962 13 966 29 959 14 963 30 960 15 964 31 959 16 963 INSTRUCTIONS On this format , list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9M77)

NL-03-1 31 Monthly Operating Report Page 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-247 UNIT I.P. Unit #2 DATE August 5, 2003 COMPLETED BY S. Smith REPORT MONTH July-2003 TELEPHONE (914)714-8304

_ 0

- ~~

o~~~ 1* Licensee No. Date Event l Cause & Corrective Action to Prevent Recurrence

. - = - - ~ . R-o r=

1 2 3 4 F: Forced Reason: Method: Exibit G - Instructions S: Scheduled A - Equipment Failure ( Explain) I - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for Licensee C - Refueling 3 - Automatic Scram Event Report ( LER) File (NUREG-0161 )

D - Regulatory Restriction 4 - Other ( Explain)

E - Operator Training & License Examination 5 F - Administrative Exibit I - Same Source G - Operational Error ( Explain)

H - Other ( Explain )

(9/77)

Docket No. 50247 NL-03-131 Monthly Operating Report Page4of4 Summary Of Operatina Experience July 2003 Indian Point Unit No. 2 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical generation of 743,063 MWH.