NL-03-046, February 2003 Monthly Operating Report for Indian Point 3
| ML030770559 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/13/2003 |
| From: | Dacimo F Entergy Nuclear Northeast |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-03-046 | |
| Download: ML030770559 (6) | |
Text
AE
--"EnteWg Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway, Suite 1 PO Box 249 Buchanan, NY 10511-0249 Tel 914 734 5340 Fax 914 734 5718 Fred Dacimo Vice President, Operations March 13, 2003 NL-03-046 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1 -17 Washington, D.C. 20555-0001
Subject:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operating Report for February 2003
Dear Sir:
The attached monthly operating report, for the month of February 2003, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4.
Entergy is making no commitments in this letter. Should you have any questions regarding this submittal, please contact Mr. John McCann, Manager, Licensing, Indian Point Entergy Center at (914) 734-5074.
Sin Fred R. Dacimo Vice President, Operations Indian Point Energy Center cc: See next page
Docket No. 50-286 NL-03-046 Page 2 of 2 Attachment cc:
Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
50-286 Indian Point 3 3-04-03 T. Orlando (914) 736-8340 NL-03-046 ATTACHMENT PAGE 1 of 4 OPERATING DATA REPORT OPERATING STATUS Unit Name:
Indian Point No. 3 Nuclear Power Plant Reporting Period:
February 2003 Licensed Thermal Power (MWt):
3067.4 Nameplate Rating (Gross MWe):
1013 Design Electrical Rating (Net MWe):
979 Maximum Dependable Capacity (Gross MWe):
1014 Maximum Dependable Capacity (Net MWe):
979 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:
Power Level to Which Restricted, If Any (Net MWe):
Reasons for Restrictions, If Any:
Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 672 672 0
672 0
2,032,787 692,221 670,836 100 100 102 102 0
Yr-to-Date 1,416 1,390.82 0
1,385.1 0
4,174,973 1,421,280 1,377,333 97.8 97.8 99.4 99.4 2.2 Cumulative 232,697 147,628.98 0
144,793.33 0
416,899,857 134,021,453 129,414,207 62.2 62.2 58.3*
57.6*
22.8 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refueling Outage 12 is scheduled to commence March 28, 2003. Estimated duration: 22 days If Shut Down At End Of Report Period. Estimated Date of Startup:
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Weighted averages
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
26:
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
50-286 Indian Point 3 3-04-03 T. Orlando (914) 736-8340 NL-03-046 ATTACHMENT PAGE 2 of 4 AVERAGE DAILY UNIT POWER LEVEL MONTH February 2003 AVERAGE DAILY POWER 998 998 998 999 998 997 998 998 998 998 998 999 999 999 999 998 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 997 998 998 998 998 999 998 998 999 999 999 999 INSTRUCTIONS: On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.
LETTER NO:
50-286 Indian Point 3 3-04-03 T. Orlando (914) 736-8340 NL-03-046 ATTACHMENT PAGE 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH FebruarV 2003 F: Forced S: Scheduled Reason:
Method:
A-Equipment 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG - 0161)
Exhibit 1 Same Source METHOD OF NO.
DATE TYPE DURATION REASON SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1
(HOURS) 2 DOWN EVENT CODE CODE PREVENT RECURRENCE REACTOR 3 REPORT#
4 5
None S4. A
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.:
LETTER NO.
50-286 Indian Point 3 3-04-03 T. Orlando (914) 736-8340 NL-03-046 ATTACHMENT PAGE 4 of 4
SUMMARY
OF OPERATING EXPERIENCE February 2003 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 672 hours0.00778 days <br />0.187 hours <br />0.00111 weeks <br />2.55696e-4 months <br />, producing a gross electrical energy generation of 692, 221 MWH.