Entergy Nuclear Northeast Entergy Nuclear Operations, Inc 440 Hamilton Avenue E. teW fP 0 Box 5029 White Plains, NY 10601-5029 Tel 914 272 3500 January 15, 2003 NL-03-011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001
Subject:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operating Report for December 2002
Dear Sir:
The attached monthly operating report, for the month of December 2002, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4. Please be advised that by NRC letter dated November 26, 2002, a 1.4% power uprate, Amendment 213 was issued by the NRC for the Indian Point 3 Facility Operating License and Technical Specifications. The 1.4% power uprate amendment was implemented in the December reporting period.
Entergy is making no commitments in this letter. Should you have any questions regarding this submittal, please contact Mr. John McCann, Manager of Licensing, Indian Point Entergy Center at (914) 734-5074.
Sincerely yours, Fred Dacimo Vice President Indian Point Entergy Center cc: See next page
Docket No. 50-286 NL-03-011 Page 2 of 2 Attachment cc:
Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 U.S. Nuclear Regulatory Commission ATTN: Director, Office of Information Resource Management Washington, D.C. 20555 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
50-286 Indian Point 3 1-07-03 T. Orlando (914) 736-8340 NL-03-011 ATTACHMENT PAGE 1 of 4 OPERATING DATA REPORT OPERATING STATUS Unit Name:
Indian Point No. 3 Nuclear Power Plant Reporting Period:
December 2002 Licensed Thermal Power (MWt):
3067.4 Nameplate Rating (Gross MWe):
1013 Design Electrical Rating (Net MWe):
965 Maximum Dependable Capacity (Gross MWe):
1014 Maximum Dependable Capacity (Net MWe):
979 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons: Item numbers 3, 6 and 7 changed due to a plant power uprate (Amendment 213) initiated on December 22, 2002.
- 9.
Power Level to Which Restricted, If Any (Net MWe):
- 10.
Reasons for Restrictions, If Any:
This Month
- 11.
Hours In Reporting Period 744
- 12.
Number Of Hours Reactor Was Critical 744
- 13.
Reactor Reserve Shutdown Hours 0
- 14.
Hours Generator On-Line 744
- 15.
Unit Reserve Shutdown Hours 0
- 16.
Gross Thermal Energy Generated (MWH) 2,156,516
- 17.
Gross Electrical Energy Generated (MWH) 728,450
- 18.
Net Electrical Energy Generated (MWH) 704,984
- 19.
Unit Service Factor 100
- 20.
Unit Availability Factor 100
- 21.
Unit Capacity factor (Using MDC Net) 97.7
- 22.
Unit Capacity Factor (Using DER Net) 98.2
- 23.
Unit Forced Outage Rate 0
Yr-to-Date 8,760 8,731.05 0
8,711.23 0
25,893,944 8,716,710 8,432,649*
98.3 98.3 99.7 99.8 1.7 Cumulative 231,281 146,238.78 0
143,408.23 0
412,724,884 132,600,173 128,036,874*
62.0 62.0 58.1 **
57.4 23.0
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refueling Outage 12 is scheduled to commence March 28, 2003. Estimated duration: 22 days If Shut Down At End Of Report Period. Estimated Date of Startup:
Units In Test Status (Prior to Commercial Operation):
Forc INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Reflects 2 MWH correction from February 2002
- Weighted average ecast Achieved
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.
- 25.
26.
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
50-286 Indian Point 3 1-07-03 T. Orlando (914) 736-8340 NL-03-011 ATTACHMENT PAGE 2 of 4 AVERAGE DAILY UNIT POWER LEVEL MONTH December 2002 AVERAGE DAILY POWER 987 986 986 986 986 987 987 988 984 986 881 630 528 756 814 984 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 986 986 987 987 987 992 1000 999 1000 999 998 999 999 999 998 INSTRUCTIONS: On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.
LETTER NO:
ATTACHMENT PAGE 3 of 4 50-286 Indian Point 3 1-07-03 T. Orlando (914) 736-8340 NL-03-011 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 2002 1
F: Forced S: Scheduled 2
3 Reason:
Method:
A-Equipment 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG - 0161) 5 Exhibit 1 Same Source
'1 METHOD OF NO.
DATE TYPE DURATION REASON SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1
(HOURS) 2 DOWN EVENT CODE CODE PREVENT RECURRENCE REACTOR 3 REPORT#
4 5
3 021211 F
N/A A
N/A N/A XX XXXXXX Several load reductions and ascensions over a three (3) day period due to a thermal anomaly found on the 345 KV Buchanan Substation.
DOCKET NO.
50-286 UNIT:
Indian Point 3 DATE:
1-07-03 COMPLETED BY:
T. Orlando TELEPHONE NO.:
(914) 736-8340 LETTER NO.
NL-03-011 ATTACHMENT PAGE 4 of 4
SUMMARY
OF OPERATING EXPERIENCE December 2002 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical energy generation of 728, 450 MWH.
On December 11, 2002, at 1510 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.74555e-4 months <br />, a load reduction (derate) commenced due to a thermal anomaly found on the 345 KV disconnect 4B located in the Buchanan Substation. Over the course of a three (3) day period, the unit reached its lowest derate at 450 MWe on December 13, at 1511 hours0.0175 days <br />0.42 hours <br />0.0025 weeks <br />5.749355e-4 months <br />. On December 14, at approximately 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, a load escalation commenced and the unit was stabilized at 840 MWe at 0635 hours0.00735 days <br />0.176 hours <br />0.00105 weeks <br />2.416175e-4 months <br />. Following successful completion of repairs to the substation equipment, a load escalation commenced on December 16, at 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br />, and the unit reached full power on December 17, at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
The unit received a 1.4% power uprate by NRC letter dated November 26, 2002, which issued Amendment 213 to the Facility Operating License (No. DPR-64) and Technical Specifications.
This power uprate resulted in licensed thermal power (MWt) increasing to 3067.4 MWt and the maximum dependable capacity (Gross MWe) increasing to 979 MWe. The power uprate commenced on December 22, at 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br />, and was completed at 1610 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.12605e-4 months <br />. The unit remained on line at full power for the remainder of the reporting period.