NL-03-175, October 2003 Monthly Operating Report for Indian Point Unit 2

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Indian Point Unit 2
ML033220350
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 11/13/2003
From: Dacimo F
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-175
Download: ML033220350 (6)


Text

-- Entergy Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway. Suite 1 RO. Box 249 Buchanan, NY 10511-0249 Tel 914 734 5340 Fax 914 734 5718 Fred Dacimo Vice President, Operations November 13, 2003 Re:

Indian Point, Unit No. 2 Docket No. 50-247 NL-03-175 Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-P1-17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for October 2003

Dear Sir:

In accordance with Technical Specification 6.9.1.7, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Indian Point 2 Monthly Operating Report for the month of October 2003.

There are no commitments contained in this correspondence.

Should you or your staff have any questions regarding this matter, please contact Mr. William S.

Blair, Manager, Licensing, Indian Point Energy Center at (914) 734-5074.

Sincerely, Fred R. Dacimo Vice President, Operations Indian Point Energy Center

NL-03-175 Page 2 of 2 Attachments cc:

Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Project Manager Project Directorate I Division of Reactor Projects I/Il U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 38 Buchanan, NY 10511-0038 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223

NL-03-1 75 Monthly Operating Report Page 1 of 4 OPERATING DATA REPORT DOCKET NO.

50-247 DATE November 6,2003 COMPLETED BY S. Smith TELEPHONE (914)736-8304 OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

8.

Unit Name:

INDIAN POINT UNIT No. 2 Notes Reporting Period:

October-2003 Licensed Thermal Power ( MWt ):

3114.4 Nameplate Rating ( Gross Mwe ):

1008 Design Electrical Rating (Net Mwe ) :

993 Maximum Dependable Capacity ( Gross Mwe ):

988 Maximum Dependable Capacity ( Net Mwe ):

956 If Changes Occur in Capacity Ratings ( Items Number 3 Through 7 ) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, If Any (Net Mwe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 745 7,296
12. Number Of Hours Reactor Was Critical 745 7,200.86
13. Reactor Reserve Shutdown Hours 0

0

14. Hours Generator On-Line 745 7,134.65
15. Unit Reserve Shutdown Hours 0

0

16. Gross Thermal Energy Generated ( MWH) 2.320.178 21.972.261
17. Gross Electrical Energy Generated ( MWH) 760.407 7.167.267
18. Net Electrical Energy Generated ( MWH) 734.782 6.922.551
19. Unit Service Factor 100.0 97.8
20. Unit Availability Factor 100.0 97.8
21. Unit Capacity Factor (Using MDC Net) 103.2 99.8
22. Unit Capacity Factor ( Using DER Net) 99.3 95.9
23. Unit Forced Outage Rate 0

2.2

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration Of Each ):

257,161 181,702.48 4,566.64 177.706.95 0

502.415.380 157,245.623 150,702,023 69.1 69.1 65.5 63.3 13.4

25. If Shut Down At End Of ReportPeriodEstimated Date Of Startup:
26. Units In Test Status ( Prior to Commercial Operation ):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION N/A N/A N/A N/A N/A N/A (9/77)

NL-03-1 75 Monthly Operating Report Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-247 UNIT I.P. Unit #2 DATE November 6.2003 COMPLETED BY S. Smith TELEPHONE (914)736-8304 October-2003 MONTH DAY AVERAGE DAILY POWER LEVEL

( MWe-Nct )

1 978 2

980 3

980 4

981 5

982 6

984 7

984 8

983 9

984 10 988 11 982 12 984 13 985 14 984 15 986 16 990 DAY AVERAGE DAILY POWER LEVEL (MWCNet )

17 988 18 981 19 988 20 988 21 989 22 989 23 989 24 990 25 991 26 991 27 989 28 990 29 991 30 992 31 992 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9M)

NL-03-1 75 Monthly Operating Report Page 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH October-2003 DOCKET NO.

50-247 UNIT I.P. Unit #2 DATE November 6,2003 COMPLETED BY S. Smith TELEPHONE (914)736-8304 C~~~~ N O~~~~~~~1O1 Licensee 0

-~~~

No. Date 0

C4 Event

~~~~~~~~~~~~~~~Cause

& Corrective Action to Prevent Recurrence F-O~~~

C Report#

2 oU NONE 1

2 3

F: Forced S: Scheduled Reason:

A - Equipment Failure ( Explain )

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error ( Explain)

H - Other (Explain)

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Other ( Explain) 4 Exibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report ( LER ) File ( NUREG-0161 )

5 Exibit I - Same Source (9n7)

Letter No.

NL-03-175 Monthly Operating Report Page 4 of 4 Docket No.

50-247 Unit:

IP Unit # 2 Date:

November 6, 2003 Completed by:

S. Smith Telephone No.:

(914) 736-8304 Summary Of Operating Experience October 2003 Indian Point Unit No. 2 was synchronized to the bus for a total of 745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br /> producing a gross electrical generation of 760,407 MWH.