""%-%En tergby Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Indian Point Energy Center RO Box 308 Buchanan, NY 10511 Tel 914 736 8001 Fax 914 7368012 Robert J. Barrett Vice President, Operations Indian Point 3 September 12, 2002 IPN-02-074 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1 -17 Washington, D.C. 20555-0001
Subject:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operating Report for August 2002
Dear Sir:
The attached monthly operating report, for the month of August 2002, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4.
Indian Point 3 is making no commitments in this letter.
Very (esident, Operations Point 3 Nuclear Power Plant cc: See next page
Docket No. 50-286 IPN-02-074 Page 2 of 2 Attachment cc:
Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 U.S. Nuclear Regulatory Commission ATTN: Director, Office of Information Resource Management Washington, D.C. 20555 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
OPERATING DATA REPORT 50-286 Indian Point 3 9-04-02 T. Orlando (914) 736-8340 IPN-02-074 ATTACHMENT PAGE 1 of 4 OPERATING STATUS Unit Name:
Indian Point No. 3 Nuclear Power Plant Reporting Period:
August 2002 Licensed Thermal Power (MWt):
3025 Nameplate Rating (Gross MWe):
1013 Design Electrical Rating (Net MWe):
965 Maximum Dependable Capacity (Gross MWe):
1000 Maximum Dependable Capacity (Net MWe):
965 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:
- 9.
Power Level to Which Restricted, If Any (Net MWe):
- 10.
Reasons for Restrictions, If Any:
- 11.
Hours In Reporting Period
- 12.
Number Of Hours Reactor Was Critical
- 13.
Reactor Reserve Shutdown Hours
- 14.
Hours Generator On-Line
- 15.
Unit Reserve Shutdown Hours
- 16.
Gross Thermal Energy Generated (MWH)
- 17.
Gross Electrical Energy Generated (MWH)
- 18.
Net Electrical Energy Generated (MWH)
- 19.
Unit Service Factor
- 20.
Unit Availability Factor
- 21.
Unit Capacity factor (Using MDC Net)
- 22.
Unit Capacity Factor (Using DER Net)
- 23.
Unit Forced Outage Rate This Month 744 744 0
744 0
2,226,680 741,393 714,871 100 100 99.6 99.6 0
Yr-to-Date 5,831 5,831 0
5,831 0
17,609,045 5,925,815 5,734,793 100 100 101.9 101.9 0
Cumulative 228,352 143,438.73 0
140,628 0
404,439,985 129,809,278 125,339,018 61.6 61.6 57.6*
56.9 23.2
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Durati
- 25.
If Shut Down At End Of Report Period. Estimated Date of Startup:.
- 26.
Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Weighted Average on of Each):
Forecast
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.
Achieved
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
AVERAGE DAILY UNIT POWER LEVEL MONTH August 2001 AVERAGE DAILY POWER DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 50-286 Indian Point 3 9-04-02 T. Orlando (914) 736-8340 IPN-02-074 ATTACHMENT PAGE 2 of 4 AVERAGE DAILY POWER LEVEL (MWe-Net) 969 967 968 970 970 970 970 971 973 973 973 974 974 730 879 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 973 972 972 971 972 973 974 974 975 974 974 972 971 970 970 967
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.
LETTER NO:
50-286 Indian Point 3 8-04-02 T. Orlando (914) 736-8340 IPN-02-074 ATTACHMENT PAGE 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH August 2002 2
3 Reason:
Method:
A-Equipment 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain) 4 5
Exhibit G"- Instructions Exhibit 1 for Preparation of Data Same Source Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) i METHOD OF NO.
DATE TYPE DURATION REASON SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1
(HOURS) 2 DOWN EVENT CODE CODE PREVENT RECURRENCE REACTOR 3 REPORT#
4 5
1 020830 F
N/A A
N/A N/A IE INSTRUI Turbine runback due to PR NI 43 falsely indicating a dropped rod. Unit load was stabilized at 75% reactor power.
1 F: Forced S: Scheduled
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.:
LETTER NO.
50-286 Indian Point 3 9-04-02 T. Orlando (914) 736-8340 IPN-02-074 ATTACHMENT PAGE 4 of 4
SUMMARY
OF OPERATING EXPERIENCE August 2002 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical energy generation of 741,393 MWH.
On August 30, at 0142 hours0.00164 days <br />0.0394 hours <br />2.347884e-4 weeks <br />5.4031e-5 months <br />, the unit experienced a turbine runback. This was due to PR NI 43 falsely indicating a dropped rod. The unit was stabilized at 75% reactor power. Following successful replacement and testing of PR NI 43, a load escalation to 90% reactor power commenced on August 31, at 0410 hours0.00475 days <br />0.114 hours <br />6.779101e-4 weeks <br />1.56005e-4 months <br />. This was done to support the performance of surveillance test 3PT-Q107, "Main Turbine Stop and Control Valve Exercise and Vibration Monitoring Test." Following successful completion of this test, a load escalation commenced at 1316 hours0.0152 days <br />0.366 hours <br />0.00218 weeks <br />5.00738e-4 months <br />, and the unit achieved full load at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />.
The unit remained on line at full power for the remainder of the reporting period.