NL-03-176, October 2003 Monthly Operating Report for Indian Point 3

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Indian Point 3
ML033220347
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 11/13/2003
From: Dacimo F
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-176
Download: ML033220347 (6)


Text

f-wEntegy Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway. Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 734 5340 Fax 914 734 5718 Fred Dacimo Vice President. Operations November 13, 2003 Re:

Indian Point, Unit No. 3 Docket No. 50-286 NL-03-176 Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-P1-17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for October 2003

Dear Sir:

In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Indian Point 3 Monthly Operating Report for the month of October 2003.

There are no commitments contained in this correspondence.

Should you or your staff have any questions regarding this matter, please contact Mr. William S.

Blair, Manager, Licensing, Indian Point Energy Center at (914) 734-5074.

Si Fred R. Dacimo Vice President, Operations Indian Point Energy Center

--I (

NL-03-176 Page 2 of 2 Attachments cc:

Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Project Manager Project Directorate I Division of Reactor Projects I/Il U.S. Nuclear Regulatory Commission Mail Stop 0-8-C2 Washington, DC 20555-0001 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 38 Buchanan, NY 10511-0038 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223

LETTER NO:

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

OPERATING DATA REPORT NL-03-176 Monthly Operating Report Page 1 of 4 50-286 Indian Point 3 11-04-03 T. Orlando (914) 736-8340 1.

2.

3.

4.

5.

6.

7.

8.

OPERATING STATUS Unit Name:

Indian Point No. 3 Nuclear Power Plant Reporting Period:

October 2003 Licensed Thermal Power (MWt):

3067.4 Nameplate Rating (Gross MWe):

1013 Design Electrical Rating (Net MWe):

979 Maximum Dependable Capacity (Gross MWe):

1014 Maximum Dependable Capacity (Net MWe):

979 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons for Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 745 745 0

745 0

2,291,672 767,232 741,643 100 100 101.7 101.7 0

Yr-to-Date 7,296 6,402.83 0

6,285.33 0

19,016,400 6,359,058 6,148,956 86.2 86.2 86.1 86.1 4.3 Cumulative 238,577 152,640.99 0

149,693.18 0

431,741,284 138,959,231 134,185,830 62.7 62.7 58.9*

58.2*

22.3 24.

25.

26.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):_

If Shut Down At End Of Report Period. Estimated Date of Startup:

Units In Test Status (Prior to Commercial Operation):

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Weighted averages Achieved

LETTER NO:

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

NL-03-176 Monthly Operating Report Page 2 of 4 50-286 Indian Point 3 11-04-03 T. Orlando (914) 736-8340 AVERAGE DAILY UNIT POWER LEVEL MONTH October 2003 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 996 2

995 3

996 4

996 5

996 6

996 7

995 8

994 9

993 10 995 11 996 12 995 13 995 14 995 15 996 16 995 DAY AVERAGE 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DAILY POWER LEVEL (MWe-Net) 995 995 997 996 996 995 996 996 994 994 993 998 997 997 997 INSTRUCTIONS: On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

LETTER NO:

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO.

NL-03-1 76 Monthly Operating Report,

Page 3 of 4 50-286 Indian Point 3 1 1-04-03 T. Orlando (914) 736-8340 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH October 2003 l

TYPE TREA METHOD OF NO.

DATE TYPE DURATION REASON SHUTTING LICENSEE EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1

(HOURS) 2 DOWN REPORT#

CODE CODE PREVENT RECURRENCE REACTOR 3 4

5 NONE (1) Type: F: Forced S: Scheduled (2) Reason: A-Equipment (3) Meth B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain) od: 1-Manual 2-Manual Scram 3-Automatic Scra 4-Other (Explain)

(4) Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event m

Report (LER) File (NUREG - 0161)

(5) Exhibit 1 - Same Source

t. -

Letter No.

Docket No.

Unit:

Date:

Completed By:

Telephone No.:

NL-03-176 Monthly Operating Report Page 4of4 50-286 Indian Point 3 11-04-03 T. Orlando (914) 736-8340

SUMMARY

OF OPERATING EXPERIENCE October 2003 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 745 hours0.00862 days <br />0.207 hours <br />0.00123 weeks <br />2.834725e-4 months <br />, producing a gross electrical energy generation of 767,232 MWH.