-Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Indian Point Energy Center P.O Box 308 Buchanan, NY 10511 Tel 914 736 8001 Fax 914 736 8012 Robert J. Barrett Vice President, Operations Indian Point 3 August 8, 2002 IPN-02-065 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001
Subject:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operating Report for July 2002
Dear Sir:
The attached monthly operating report, for the month of July 2002, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4.
Indian Point 3 is making no commitments in this letter.
Very trul our o
J.J rrett Vic President, Operations In an Point 3 Nuclear Power Plant cc: See next page
Docket No. 50-286 IPN-02-065 Page 2 of 2 Attachment cc:
Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 U.S. Nuclear Regulatory Commission ATTN: Director, Office of Information Resource Management Washington, D.C. 20555 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
50-286 Indian Point 3 8-05-02 T. Orlando (914) 736-8340 IPN-02-065 ATTACHMENT PAGE 1 of 4 OPERATING DATA REPORT OPERATING STATUS Unit Name:
Indian Point No. 3 Nuclear Power Plant Reporting Period:
July 2002 Licensed Thermal Power (MWt):
3025 Nameplate Rating (Gross MWe):
1013 Design Electrical Rating (Net MWe):
965 Maximum Dependable Capacity (Gross MWe):
1000 Maximum Dependable Capacity (Net MWe):
965 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:
- 9.
Power Level to Which Restricted, If Any (Net MWe):
- 10.
Reasons for Restrictions, If Any:
- 11.
Hours In Reporting Period
- 12.
Number Of Hours Reactor Was Critical
- 13.
Reactor Reserve Shutdown Hours
- 14.
Hours Generator On-Line
- 15.
Unit Reserve Shutdown Hours
- 16.
Gross Thermal Energy Generated (MWH)
- 17.
Gross Electrical Energy Generated (MWH)
- 18.
Net Electrical Energy Generated (MWH)
- 19.
Unit Service Factor
- 20.
Unit Availability Factor
- 21.
Unit Capacity factor (Using MDC Net)
- 22.
Unit Capacity Factor (Using DER Net)
- 23.
Unit Forced Outage Rate This Month 744 744 0
744 0
2,249,789 752,784 726,442 100 100 101.2 101.2 0
Yr-to-Date 5,087 5,087 0
5,087 0
15,382,365 5,184,422 5,019,922 100 100 102.3 102.3 0
Cumulative 227,608 142,694.73 0
139,884 0
402,213,305 129,067,885 124,624,147 61.5 61.5 57.5*
56.7 23.3
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25.
If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26.
Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Weighted Average Forecast
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.
Achieved
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
50-286 Indian Point 3 8-05-02 T. Orlando (914) 736-8340 IPN-02-065 ATTACHMENT PAGE 2 of 4 AVERAGE DAILY UNIT POWER LEVEL MONTH July 2001 AVERAGE DAILY POWER 981 980 978 978 978 979 977 983 979 979 979 979 980 977 978 978 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 978 977 976 970 962 975 974 974 973 975 974 975 974 974 974 INSTRUCTIONS: On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.
LETTER NO:
50-286 Indian Point 3 8-05-02 T. Orlando (914) 736-8340 IPN-02-065 ATTACHMENT PAGE 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH July 2002 1
F: Forced S: Scheduled 2
3 Reason:
Method:
A-Equipment 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain) 4 5
Exhibit G - Instructions Exhibit 1 for Preparation of Data Same Source Entry Sheets for Licensee Event Report (LER) File (NUREG - 0161)
I '
CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE I
I I ________
I ______
I ___________________
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.:
LETTER NO.
50-286 Indian Point 3 8-05-02 T. Orlando (914) 736-8340 IPN-02-065 ATTACHMENT PAGE 4 of 4
SUMMARY
OF OPERATING EXPERIENCE July 2002 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical energy generation of 752,784 MWH.