NL-03-120, June 2003 Monthly Operating Report for Indian Point Unit 2
| ML031980167 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 07/15/2003 |
| From: | Dacimo F Entergy Nuclear Northeast |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-03-120 | |
| Download: ML031980167 (6) | |
Text
`Entergy Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway, Suite 1 RO. Box 249 Buchanan, NY 10511-0249 Tel 914 734 5340 Fax 914 734 5718 Fred Dacimo Vice President, Operations July 15, 2003 NL-03-120 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station O-P1 -17 Washington, DC 20555-0001
Subject:
Indian Point Unit No. 2 Docket No. 50-247 License No. DPR-26 Monthly Operatina Renort for June 2003
Dear Sir:
Enclosed is the Monthly Operating Report for Indian Point 2 for the month of June 2003 that is being submitted in accordance with Technical Specification 6.9.1.7.
Entergy is making no commitments in this letter. Should you have any questions regarding this submittal, please contact Mr. John McCann, Manager, Licensing, Indian Point Energy Center at (914) 734-5074.
Sin
- ours, Fred R. Dacimo -
Vice President, Operations Indian Point Energy Center cc: see next page
- 576'Dq
Docket No. 50-247 NL-03-120 Page 2 of 2 Attachment cc:
Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1498 Resident Inspector U.S. Nuclear Regulatory Commission Indian Point 2 P.O. Box 38 Buchanan, NY 10511 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223
NL-03-120 Attachment Page 1 of 4 OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY TELEPHONE 50-247 July 3, 2003 S. Smith (914)714-8304 OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
Unit Name:
INDIAN POINT UNIT No. 2 Notes Reporting Period:
June-2003 Licensed Thermal Power ( MWt ):
3114.4 Nameplate Rating ( Gross Mwe ):
1008 Design Electrical Rating ( Net Mwe ):
993 Maximum Dependable Capacity ( Gross Mwe ):
988 Maximum Dependable Capacity (Net Mwe ):
956 If Changes Occur in Capacity Ratings ( Items Number 3 Through 7 ) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net Mwe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 1,6-Gross Thermal Energy Generated ( MWH)
- 17. Gross Electrical Energy Generated ( MWH)
- 18. Net Electrical Energy Generated ( MWH)
- 19. Unit Service Factor
-2;. Unit Availabilit Factor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacit Factor (Using DER Net)
- 23. Unit Forced Outage Rate 720 720 0
720 0
2,241,246 732,495 707,459 100.0 100.0 102.8 99.0 0
4,343 4,309.68 0
4,297.78 0
13,185,542 4,339,670 4,195,849 99.0 99.0 102.0 97.8 1.0 254,208 178,811.30 4,566.64 174,870.08 0
493,628,661 154,418,026 147,975,321 68.8 68.8 65.1 62.9 13.6
- 24. Shutdowns Scheduled Over Next 6 Months ( Type, Date, and Duration Of Each ):
- 20. If Shut Down At End Of Report Period, Estimated Date Of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION N/A N/A N/A N/A N/A NIA (9177)
NL-03-120 Attachment Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-247 UNIT I.P. Unit #2 DATE July 3,2003 COMPLETED BY S. Smith TELEPHONE (914)714-8304 June-2003 MONTH DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 AVERAGE DAILY POWER LEVEL (MWc-Net) 988 989 988 989 987 987 987 987 987 986 984 984 984 983 982 981 DAY AVERAGE DAILY POWER LEVEL (MW-Net) 17 982 18 980 19 979 20 979 21 978 22 982 23 983 24 980 25 980 26 979 27 976 28 976 29 977 30 974 31 INSTRUCTIONS On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(917
L4 l> J1 NL-03-120 Attachment Page 3 of 4 I
{
.;UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-247 I.P. Unit #2 July 3, 2003 S. Smith (914)714-8304 REPORT MONTH June-2003
\\
-0 I0 C~a 0.1 8 Licensee WI No.
Date Event Cause & Corrective Action to Prevent Recurrence N
I I
a o
I NONE III=_
1 F: Forced S : Scheduled 2
3 Reason:
A - Equipment Failure ( Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error ( Explain )
H - Other ( Explain )
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Other (Explain) 4 Exibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report ( LER ) File ( NUREG-0161 )
5 Exibit I - Same Source (9n7)
Docket No. 50-247 NL-03-1 20 Attachment Page 4 of 4 Summary Of Operating Experience June 2003 Indian Point Unit No. 2 ran at full power for the entire month of June producing a gross electrical generation of 732,495 MWH.