-f -Entery Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway, Suite 1 R0. Box 249 Buchanan, NY 10511-0249 Tel 914 734 5340 Fax 914 734 5718 Fred Dacimo Vice President, Operations June 12, 2003 NL-03-1 00 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001
Subject:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operating Report for May 2003
Dear Sir:
The attached monthly operating report, for the month of May 2003, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 5.6.4.
Entergy is making no commitments in this letter. Should you have any questions regarding this submittal, please contact Mr. John McCann, Manager, Licensing, Indian Point Entergy Center at (914) 734-5074.
Sin
- yours, Fred R. Dacimo Vice President, Operations Indian Point Energy Center cc: See next page
-/X34
Docket No. 50-286 NL-03-1 00 Page 2 of 2 Attachment cc:
Mr. Hubert J. Miller Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point 3 Nuclear Power Plant P.O. Box 337 Buchanan, NY 10511-0337 INPO Records Center 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO:
LETTER NO:
50-286 Indian Point 3 T. Orlando (914) 736-8340 NL-03-1 00 ATTACHMENT PAGE 1 of 4 OPERATING STATUS OPERATING DATA REPORT
- 1.
Unit Name:
Indian Point No. 3 Nuclear Power Plant
- 2.
Reporting Period:
May 2003
- 3.
Licensed Thermal Power (MWt):
3067.4
- 4.
Nameplate Rating (Gross MWe):
1013
- 5.
Design Electrical Rating (Net MWe):
979
- 6.
Maximum Dependable Capacity (Gross MWe):
1014
- 7.
Maximum Dependable Capacity (Net MWe):
979
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:
- 9.
Power Level to Which Restricted, If Any (Net MWe):
- 10.
Reasons for Restrictions, If Any:
-.Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours
!8ours Generator On-Line XiJnit Reserve Shutdown Hours
-iross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
-Unit Service Factor J,J nit Availabilfty Factor Unit Capacity factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 744 744 0
744 0
2,274,102 763,357 739,305 100 100 101.5 101.5 0
Yr-to-Date 3,623 2,999.97 0
2,913.12 0
8,712,323 2,913,930 2,821,420 80.4 80.4 79.5 79.5 3.1 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
If Shut Down At End Of Report Period. Estimated Date of Startup:
Umifts In Test Status (Prior to Commercial Operation):
Forecast Ach INITIAL CRITICALITY INlTIAL ELECTRICITY COMMERCIAL OPERATION
- weighted averages (irReflects 0.2 correction from April 2003
.3,-.
Cumulative 234,904 149,238.13 0
146,320.97 0
421,437,207 135,514,103 130,858,294 62.3 62.3 58.4*
57.7* (1) 22.6 ieved 11.
12.
13.
14.
15.
q6.
a7.
88.
19.
a 4
21.
22.
1 4'.
24.
26.
I5.
-46.
K.
1.
21.
DOCKET NO.
50-286 UNIT:
Indian Point 3 DATE:
6-0403 COMPLETED BY: T. Orlando TELEPHONE NO: (914) 736-8340 LETTER NO:
NL-03-100 ATTACHMENT PAGE 2of 4 AVERAGE DAILY UNIT POWER LEVEL AVERAGE DAILY POWER LEVE (MWe-Net) 898 988 997 997 999 996 998 998 998 998 997 998 998 998 998 999 MONTH May 2003
-L DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 998 18 998 19 998 20 998 21 997 22 996 23 996 24 996 25 996 26 996 27 996 28 997 29 996 30 996 31 996
'INSTRUCTIONS: On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
..c
- DAY, 2
3 4
5 8
9, 10 12 13 14 15 16
DOCKET NO.
, r 'lUNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.
LETTER NO:
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Ma 50-286
-Indian Point 3 6-0403 T. Orlando (914) 736-8340 NL-03-1 00 ATTACHMENT PAGE 3 of 4 (1) Type: F: Forced S: Scheduled (2) Reason: A-Equipment (3) Meth 1-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensee Examination F-Administrative G-Operaftonal Error H-Other (Explain) od: 1-Manual 2-Manual Scram 3-Automatic Scra 4-Oer (Explain)
(4) Exhibit G - Instructlons for Preparation of Data Entry Sheets for Licensee Event m
Report (LER) File (NUREG -0161)
(5) ExhIlbit 1 - Same Source I_
METHOD OF NO.
DATE TYPE DURATION REASON SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1
(HOURS) 2 DOWN EVENT CODE CODE PREVENT RECURRENCE REACTOR 3 REPORT #
4 5
NONE
~
~ ~
II-P
{rT
DOCKET NO.
UNIT:
DATE:
COMPLETED BY:
TELEPHONE NO.:
LETTER NO.
50-286 Indian Point 3 6-04-03 T. Orlando (914) 736-8340 NL-03-100 ATTACHMENT PAGE 4 of 4
SUMMARY
OF OPERATING EXPERIENCE May 2003 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical energy generation of 763,357 MWH.
The unit began the reporting period at approximately 72% reactor power following synchronization to the bus on April 30, 2003, at 0736 hours0.00852 days <br />0.204 hours <br />0.00122 weeks <br />2.80048e-4 months <br />. Load escalation continued to the 80% reactor power hold point for Reactor Engineering testing. On May 1, 2003, at 1242 hours0.0144 days <br />0.345 hours <br />0.00205 weeks <br />4.72581e-4 months <br />, load escalation to full power commenced. The unit achieved full load on May 3, 2003, and remained on line at full load for remainder of the reporting period.