ML23258A105
From kanterella
Jump to navigation
Jump to search
Letter Sequence Request | |
|---|---|
EPID:L-2018-LRM-0076, (Open) | |
Initiation Administration Results
Other: | |
MONTHYEARML19130A1672019-05-14014 May 2019
[Table View]May 8, 2019 Summary of Teleconference with Northern States Power Company, Doing Business as Xcel Energy, to Discuss a Response to a Request for Additional Information Related to the License Amendment Request to Adopt 10 CFR 50.69 Project stage: RAI ML23087A0222023-03-15015 March 2023 Submittal of X Energy, LLC (X-energy) Xe-100 Slide Deck, Control Room Operator Qualification Discussion Project stage: Request PMNS20230299, Meeting with X Energy, LLC Regarding the Structure of the Xe-100 Construction Permit Application2023-03-22022 March 2023 Meeting with X Energy, LLC Regarding the Structure of the Xe-100 Construction Permit Application Project stage: Meeting PMNS20230339, Meeting with X Energy, LLC Regarding the Xe-100 Slide Deck Control Room Operator Qualification Discussion2023-04-0505 April 2023 Meeting with X Energy, LLC Regarding the Xe-100 Slide Deck Control Room Operator Qualification Discussion Project stage: Request ML23104A4352023-04-14014 April 2023 Submittal of X Energy, LLC (X-energy) Slides for Xe-100 White Paper, Graphite Material Qualification Project stage: Request PMNS20230413, Discussion of the X-energy White Paper, Graphite Qualification Methodology2023-04-18018 April 2023 Discussion of the X-energy White Paper, Graphite Qualification Methodology Project stage: Request ML23159A0202023-06-13013 June 2023 Letter and Enclosure 1 - Summary of the April 17, 2023, Closed Meeting with X-Energy, LLC Regarding the XE-100 Slide Deck Control Room Operator Qualification Discussion Project stage: Meeting ML23172A2352023-06-21021 June 2023 Summary of Meeting with X-Energy, LLC Regarding the Structure of the XE-100 Construction Permit Application Project stage: Meeting ML23207A1882023-07-0808 July 2023 Summary for April 24, 2023 Partially-closed Meeting with X-energy Regarding the Graphite Material Qualification Methodology White Paper - Redacted Project stage: Meeting ML23212B2112023-07-31031 July 2023 Submittal of X Energy, LLC (X-energy) Xe-100 Graphite Qualification Regulatory Engagement Plan Project stage: Request ML23258A1052023-09-15015 September 2023 X-Energy, LLC, Xe-100 Spent Fuel Management Licensing Approach White Paper Project stage: Request PMNS20231062, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-09-21021 September 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting PMNS20231063, Pre-Application Meeting with X-energy to Discuss the Proposed White Paper on Spent Fuel Management for the Xe-100 High Temperature Gas Reactor2023-09-25025 September 2023 Pre-Application Meeting with X-energy to Discuss the Proposed White Paper on Spent Fuel Management for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML23271A2562023-10-12012 October 2023 X-Energy, LLC, Xe-100 Graphite Engagement: Xe-100 Graphite Engagement: Ignis Graphite Modeling Toolset Used in Xe-100 Analyses and Qualification Approach Project stage: Request PMNS20231069, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-10-12012 October 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting PMNS20231213, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-11-0606 November 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML23303A2082023-11-0909 November 2023 X-Energy, LLC, Xe-100 Graphite Engagement: ASME Service Level Definition, LBE Mapping, and Design Loadings for Graphite Core Assembly Project stage: Request ML23325A2412023-11-21021 November 2023 X-Energy, LLC, Xe-100 Preliminary Safety Analysis Report (PSAR) Chapter 2 Site Characteristics and Environmental Report Project stage: Request PMNS20231302, Notice of Meeting with X Energy, LLC2023-11-29029 November 2023 Notice of Meeting with X Energy, LLC Project stage: Request ML23319A2392023-11-30030 November 2023 October 5 2023 Meeting Summary Public Meeting with X-Energy to Discuss Graphite Qualification Project stage: Meeting ML23332A7652023-12-12012 December 2023 X-Energy, LLC, Xe-100 Principal Design Criteria (PDC) Project stage: Request ML23244A2732023-12-31031 December 2023 Enclosure 2: X-Energy, LLC, Presentation Materials - Xe-100 Graphite Engagement: Material Model Project stage: Request ML23319A3592024-01-0404 January 2024 Summary of Public Meeting with X-Energy, Llc., to Discuss Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting ML23355A0762024-01-0404 January 2024 Summary of Public Meeting with X-Energy, Llc., to Discuss Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting ML24004A0212024-01-10010 January 2024 Summary of Public Meeting with X-Energy, Llc., Spent Fuel Management White Paper Project stage: Meeting ML24002B1662024-01-17017 January 2024 Enclosure 2: Xe-100 Graphite Engagement: Transient, Fatigue, and Seismic Assessment Methodology Presentation - Open Meeting - Non-Proprietary (Public) Project stage: Request PMNS20231413, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2024-01-17017 January 2024 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML24011A2402024-01-25025 January 2024 X-Energy, LLC - Xe-100 Fuel Qualification Update Project stage: Request PMNS20231412, Pre-Application Meeting with X-energy to Discuss Their Fuel Qualification Plan for the Xe-100 High Temperature Gas Reactor2024-01-25025 January 2024 Pre-Application Meeting with X-energy to Discuss Their Fuel Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML24017A2552024-01-31031 January 2024 X-Energy, LLC, Use of Meteorological Data for Project Long Mott Project stage: Request ML24060A0012024-02-29029 February 2024 Meeting Summary - December 7, 2023 Public Meeting with X-Energy to PSAR Chapter 2 Project stage: Meeting ML24067A3002024-03-25025 March 2024 Letter - Request for Withholding Information from Public Disclosure for X Energy, LLC XE-100 Pre-Application Engagement Presentation Materials (EPID No. L-2018-RM-0076) Project stage: Withholding Request Acceptance ML24093A0852024-04-15015 April 2024 Summary of the January, 2024, Public Meeting with X Energy, LLC (X-Energy), XE-100 Fuel Qualification Update Project stage: Meeting ML24109A2872024-04-25025 April 2024 December 12 2023 Meeting Summary of Public Meeting with X-Energy to Discuss Principal Design Criteria Project stage: Meeting ML24109A2932024-04-25025 April 2024 January 31 2024 Meeting Summary of Public Meeting with X-Energy to Meteorological Data for Project Long Mott (1).docx Project stage: Meeting ML24122A9922024-05-23023 May 2024 Summary of the January 17, 2024 Public Meeting with X Energy, Llc. Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting 2023-06-21 |
| ML23258A105 | |
| Person / Time | |
|---|---|
| Site: | 99902071 |
| Issue date: | 09/15/2023 |
| From: | X-Energy |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML23258A103 | List: |
| References | |
| 2023-XE-NRC-032 | |
| Download: ML23258A105 (1) | |
Similar Documents at 99902071 | |
|---|---|
Retrieved from "https://kanterella.com/w/index.php?title=ML23258A105&oldid=5527304"