Summary of Meeting with X-Energy, LLC Regarding the Structure of the XE-100 Construction Permit Application
ML23172A235
Person / Time
Site: 99902071
Issue date: 06/21/2023
From: Stephanie Devlin-Gill
NRC/NRR/DANU/UAL1
To: Proffitt J
NRC/NRR/DANU/UAL1
References
EPID L-2018-LRM-0076
Download: ML23172A235 (1)


Text

June 21, 2023 MEMORANDUM TO:

Joseph A. Proffitt, Acting Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:

Stephanie Devlin-Gill, Senior Project Manager /RA/

Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE APRIL 10, 2023, MEETING WITH X ENERGY, LLC REGARDING THE STRUCTURE OF THE XE-100 CONSTRUCTION PERMIT APPLICATION (EPID L-2018-LRM-0076)

Meeting Information:

Applicant: X Energy, LLC (X-energy)

Project No.: 99902071 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)

Accession No.: ML23081A491 Applicant Presentation Slides ADAMS Accession No.: ML23080A157 Meeting Attendees: See the enclosure for a list of meeting attendees.

CONTACT:

Stephanie Devlin-Gill, NRR/DANU 301-415-5301

Meeting Summary:

The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271). The purpose of the meeting was to discuss the structure of X-energys proposed Xe-100 reactor Construction Permit Application (CPA). The meeting was conducted as a virtual meeting with attendees joining via Microsoft Teams. There were members of the public in attendance during the meeting, but they made no comments nor asked any questions.

The main points of discussion during the meeting were as follows:

The NRC staff stated that it would like to see more detail about the content of the CPA chapters during future engagements with X-energy.

The NRC staff mentioned the continued importance of pre-application engagement regarding the safety and environmental content of the CPA.

The NRC staff mentioned that there is an advantage of submitting the Environmental Report (ER) using the standard format. The NRC is familiar with reviewing ERs using the standard format and, while the NRC could review an ER that is in a different format, the standard format adds efficiencies to the NRC review.

The NRC staff encouraged X-energy to provide input and feedback to the NRC on the Technology Inclusive Content of Application Project (TICAP) and the Advanced Reactor Content of Application Project (ARCAP) when the next revisions of the documents are released for public comment.

The NRC staff requested that, as new guidance is discussed and incorporated into the preliminary safety analysis report (PSAR) and other reactor safety-related documents required for the CPA, X-energy should also engage with the environmental review staff to discuss how new guidance may affect the NRC evaluation of the ER.

X-energy stated that it plans to submit the PSAR approximately six months prior to the submittal of its ER.

X-energy indicated that specific PSAR site characterization information will likely be submitted with the ER approximately six months after the majority of the PSAR submittal. The initial PSAR site characterization information would, in some cases contain bounding site parameters that would be supplanted by site specific values upon submittal of the ER. The bounding value approach is anticipated to be consistent with that previously reviewed by the NRC staff (ML21323A159).

The NRC staff encouraged X-energy to continue to engage with the staff to discuss safety and environmental topics during the preapplication process.

No regulatory decisions were made as a result of this meeting.

Project No. 99902071

Enclosure:

List of Meeting Attendees cc: X-Energy Xe-100 via GovDelivery

ML23172A228 (Package)

ML23081A491 (Meeting Notice)

ML23172A235 (Meeting Summary)

OFFICE NRR/DANU/UAL1/PM NRR/DANU/UAL1/ABC NRR/DANU/UAL1/PM NAME SDevlin-Gill JProffitt SDevlin-Gill DATE 06/21/2023 06/21/2023 06/21/2023

Enclosure LIST OF MEETING ATTENDEES MEETING WITH X ENERGY, LLC REGARDING THE STRUCTURE OF THE XE-100 CONSTRUCTION PERMIT APPLICATION APRIL 10, 2023 U.S. Nuclear Regulatory Commission Audrain, Meg Devlin-Gill, Stephanie Erwin, Kenneth Giacinto, Joseph Jung, Ian Oberson, Greg Orenak, Michael Palmrose, Donald Proffitt, Andrew Travis, Boyce Vechioli Feliciano, Lucieann Vokoun, Patricia X Energy, LLC Chapman, Travis Bannister, David Bendt, Tim Bowers, Harlan Facemire, Jon Gorden, Milton Grant, Eddie Hultgren, Jessa Nordby, Ingrid Reames, Randall Sanderson, Marcy Staiger, Maggie van Staden, Martin U.S. Department of Energy Breuninger, James Kugler, Andy Natale, Mark Stuhldreher, Timothy Breakthrough Institute Lloveras, Leigh Smith, Charlyne CERTREC Hesebeck, Angela Electric Power Research Institute Thornsbury, Eric Information Systems Laboratories, Inc.

Pope, Steven Leidos Speicher, Jim NRG Energy, Inc Bergman, Jana Nuclear Energy Institute Lipman, Dan Radiant Nuclear Korb, Elliott S&P Global Hancock, Mary Catherine Technology Insights Silady, Fred TerraPower Kellenberger, Nick Tetra Tech, Inc.

Matis, Lisa Public Hotchkiss, Marc