February 29, 2024 MEMORANDUM TO:
Michael Wentzel, Chief Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Jorge Hernandez, Project Manager
/RA/
Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE DECEMBER 7, 2023, PUBLIC MEETING WITH X ENERGY, LLC. (X-ENERGY), XE-100 PSAR CHAPTER 2 SITE CHARACTERISTICS AND ENVIRONMENTAL REPORT (EPID NO. L-2018-LRM-0076)
Meeting Information:
Applicant: X ENERGY, LLC. (X-energy)
Docket/Project No.(s): 99902071 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML23333A056 Applicant Presentation Slides ADAMS Accession No.: ML23325A241 Meeting Attendees: See the enclosure for a list of meeting attendees.
CONTACT:
Jorge Hernandez, NRR/DANU 301-287-9096
Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271).
The purpose of this meeting was for X-energy to describe (1) the Preliminary Safety Analysis Report (PSAR) external flooding and seismic hazards analysis activities, and (2) the scope of groundwater and meteorological data sets to support PSAR Chapter 2 and Environmental Report content related to the proposed construction permit (CP) application for an Xe-100 high temperature gas reactor at the Dow Chemical Company (Dow) Seadrift site, in Seadrift, Texas.
The X-energys staff presentation discussed the following topics:
Description of a site feasibility study performed by X-energy.
Description of the scope that X-energy plans to cover in selected sections of PSAR Chapter 2 related to hydrology, external flooding events, and tsunami hazards, ice hazards, geology, seismology, and geotechnical engineering.
The NRC staff made the following questions/observations (including X-energys responses):
Clarify what is meant by supplement to the initial submittal in the X-energys presentation materials. X-energy indicated that it means subsequent to its CP application.
Clarify if X-energy intends to deviate from the regulatory guidance listed in Slide 8 of its presentation materials. X-energy stated that the intent is to follow existing guidance and that Chapter 2 of the PSAR will look like a typical Chapter 2 that follows NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition.
Will the site be backfilled? How is this consideration accounted for liquefaction and other geotechnical studies? X-energy indicated that the site grading will have an effect on liquefaction but that this risk is eliminated by locating the safety-related scope below grade. The NRC staff indicated liquefaction will be a focus area during the detailed review of the construction permit application.
The NRC staff noted that there is DANU-ISG-2022-02 Advanced Reactor Content of Application Project Chapter 2, Site Information Draft Interim Staff Guidance (ML22048B541) related to the time frame for the meteorological datasets. X-energy should look into the acceptance criteria for less than 2 years of data in the draft guidance.
Is there a plan to characterize groundwater with monitoring data for the conceptual model transport pathways? X-energy indicated that for the initial submittal there will not be sufficient data, but that supplements will include additional data to support the conclusion of no impact to the reactor building.
The NRC staff observed that the Chapter 2 section structure is different from the structure presented in the Advanced Reactor Content of Application interim staff guidance (DANU-ISG-2022-02). X-energy should explain these differences when submitting the licensing application.
During the closed portion of the meeting, X-energy discussed its licensing strategy, geotechnical and groundwater well installation schedule, meteorological data sources and design basis hazard levels for external flooding and seismic hazards.
No regulatory decisions were made as a result of this meeting.
Project No. 99902071
Enclosure:
List of Meeting Attendees cc: X-energy Xe-100 via GovDelivery
SUBJECT:
SUMMARY
OF THE DECEMBER 7, 2023, PUBLIC MEETING WITH X ENERGY, LLC. (X-ENERGY), XE-100 PSAR CHAPTER 2 SITE CHARACTERISTICS AND ENVIRONMENTAL REPORT (EPID NO. L-2018-LRM-0076) DATED: FEBRUARY 29, 2024 DISTRIBUTION:
PUBLIC RidsNrrDanuUal1 Resource RidsNrrDanuUal2 Resource RidsNrrDanu Resource AGhosh AMuniz BGlowacki BHayes GOberson IJung ITseng JGiacinto JPires JWhite MNagel NTiruneh ODukes PVokoun RWang STabatabai JThomson ADAMS Accession Number: ML24060A001 NRR-001 OFFICE NRR/DANU/UAL2/PM NRR/DANU/UAL2/BC NRR/DANU/UAL2/PM NAME JHernandez MWentzel JHernandez DATE 02 / 29 / 2024 02 / 29 / 2024 02 / 29 / 2024 OFFICIAL RECORD COPY
Enclosure List of Meeting Attendees For the December 7, 2023 Public Meeting With X Energy, LLC. (X-Energy), Xe-100 PSAR Chapter 2 Site Characteristics and Environmental Report Open Meeting Name Organization Jorge Hernandez Munoz U.S. Nuclear Regulatory Commission (NRC)
Ian Tseng NRC Amitava Ghosh NRC Donald Palmrose NRC Ian Jung NRC Joseph Giacinto NRC Brian Glowacki NRC Jenise Thompson NRC Michael Wentzel NRC Patricia Vokoun NRC Rosalynn Wang NRC Ondra Dukes NRC Jason White NRC Jose Pires NRC Mihaela Biro NRC Madelyn Nagel NRC Nebiyu Tiruneh NRC Charles O'Connor Dow Bobby Kunkle X-energy Dominik Muszynski X-energy Jessa Hultgren X-energy Jessica Maddocks X-energy Jon Facemire X-energy Maggie Staiger X-energy Milton Gorden X-energy Steve Vaughn X-energy CM Launi X-energy (contractor)
David Nielson X-energy (contractor)
Greg Boswell X-energy (contractor)
James Starnes X-energy (contractor)
Jeffrey Mann X-energy (contractor)
Jessica Howe X-energy (contractor)
Joshua Bickett X-energy (contractor)
Matthew Kyper X-energy (contractor)
Mehrdad Salehi X-energy (contractor)
Prater, Erwin T X-energy (contractor)
Russell Light X-energy (contractor)
Sandra Jannetty X-energy (contractor)
Tim Glover X-energy (contractor)
Valentina Montalvo X-energy (contractor)
William Elzinga X-energy (contractor)
Rachel Turney Enercon Tim Basham Enercon
2 Name Organization Woody Wodrich Enercon Stephan Moen Energy Northwest Jan Mazza Holtec Jean-Philipe Ohanessian Holtec Steven Mitchell Holtec Gary Becker NuScale Rebecka Bence Pacific Northwest National Laboratory Irv Mermelstein Terrapower Closed Meeting Name Organization Jorge Hernandez Munoz U.S. Nuclear Regulatory Commission (NRC)
Amitava Ghosh NRC Ian Jung NRC Joseph Giacinto NRC Brian Glowacki NRC Jenise Thompson NRC Michael Wentzel NRC Patricia Vokoun NRC Rosalynn Wang NRC Ondra Dukes NRC Jason White NRC Madelyn Nagel NRC Nebiyu Tiruneh NRC Bobby Kunkle X-energy Jessa Hultgren X-energy Jessica Maddocks X-energy Jon Facemire X-energy Maggie Staiger X-energy Mark Feltner X-energy Milton Gorden X-energy Steve Vaughn X-energy CM Launi X-energy (contractor)
David Nielson X-energy (contractor)
Greg Boswell X-energy (contractor)
James Starnes X-energy (contractor)
Jeffrey Mann X-energy (contractor)
Jessica Howe X-energy (contractor)
Joshua Bickett X-energy (contractor)
Matthew Kyper X-energy (contractor)
Mehrdad Salehi X-energy (contractor)
Prater, Erwin T X-energy (contractor)
Russell Light X-energy (contractor)
Sandra Jannetty X-energy (contractor)
Tim Glover X-energy (contractor)
Valentina Montalvo X-energy (contractor)
William Elzinga X-energy (contractor)