Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML19130A1672019-05-14014 May 2019 May 8, 2019 Summary of Teleconference with Northern States Power Company, Doing Business as Xcel Energy, to Discuss a Response to a Request for Additional Information Related to the License Amendment Request to Adopt 10 CFR 50.69 Project stage: RAI ML23087A0222023-03-15015 March 2023 Submittal of X Energy, LLC (X-energy) Xe-100 Slide Deck, Control Room Operator Qualification Discussion Project stage: Request PMNS20230299, Meeting with X Energy, LLC Regarding the Structure of the Xe-100 Construction Permit Application2023-03-22022 March 2023 Meeting with X Energy, LLC Regarding the Structure of the Xe-100 Construction Permit Application Project stage: Meeting PMNS20230339, Meeting with X Energy, LLC Regarding the Xe-100 Slide Deck Control Room Operator Qualification Discussion2023-04-0505 April 2023 Meeting with X Energy, LLC Regarding the Xe-100 Slide Deck Control Room Operator Qualification Discussion Project stage: Request ML23104A4352023-04-14014 April 2023 Submittal of X Energy, LLC (X-energy) Slides for Xe-100 White Paper, Graphite Material Qualification Project stage: Request PMNS20230413, Discussion of the X-energy White Paper, Graphite Qualification Methodology2023-04-18018 April 2023 Discussion of the X-energy White Paper, Graphite Qualification Methodology Project stage: Request ML23159A0202023-06-13013 June 2023 Letter and Enclosure 1 - Summary of the April 17, 2023, Closed Meeting with X-Energy, LLC Regarding the XE-100 Slide Deck Control Room Operator Qualification Discussion Project stage: Meeting ML23172A2352023-06-21021 June 2023 Summary of Meeting with X-Energy, LLC Regarding the Structure of the XE-100 Construction Permit Application Project stage: Meeting ML23207A1882023-07-0808 July 2023 Summary for April 24, 2023 Partially-closed Meeting with X-energy Regarding the Graphite Material Qualification Methodology White Paper - Redacted Project stage: Meeting ML23212B2112023-07-31031 July 2023 Submittal of X Energy, LLC (X-energy) Xe-100 Graphite Qualification Regulatory Engagement Plan Project stage: Request ML23258A1052023-09-15015 September 2023 X-Energy, LLC, Xe-100 Spent Fuel Management Licensing Approach White Paper Project stage: Request PMNS20231062, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-09-21021 September 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting PMNS20231063, Pre-Application Meeting with X-energy to Discuss the Proposed White Paper on Spent Fuel Management for the Xe-100 High Temperature Gas Reactor2023-09-25025 September 2023 Pre-Application Meeting with X-energy to Discuss the Proposed White Paper on Spent Fuel Management for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML23271A2562023-10-12012 October 2023 X-Energy, LLC, Xe-100 Graphite Engagement: Xe-100 Graphite Engagement: Ignis Graphite Modeling Toolset Used in Xe-100 Analyses and Qualification Approach Project stage: Request PMNS20231069, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-10-12012 October 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting PMNS20231213, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-11-0606 November 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML23303A2082023-11-0909 November 2023 X-Energy, LLC, Xe-100 Graphite Engagement: ASME Service Level Definition, LBE Mapping, and Design Loadings for Graphite Core Assembly Project stage: Request ML23325A2412023-11-21021 November 2023 X-Energy, LLC, Xe-100 Preliminary Safety Analysis Report (PSAR) Chapter 2 Site Characteristics and Environmental Report Project stage: Request PMNS20231302, Notice of Meeting with X Energy, LLC2023-11-29029 November 2023 Notice of Meeting with X Energy, LLC Project stage: Request ML23319A2392023-11-30030 November 2023 October 5 2023 Meeting Summary Public Meeting with X-Energy to Discuss Graphite Qualification Project stage: Meeting ML23332A7652023-12-12012 December 2023 X-Energy, LLC, Xe-100 Principal Design Criteria (PDC) Project stage: Request ML23244A2732023-12-31031 December 2023 Enclosure 2: X-Energy, LLC, Presentation Materials - Xe-100 Graphite Engagement: Material Model Project stage: Request ML23319A3592024-01-0404 January 2024 Summary of Public Meeting with X-Energy, Llc., to Discuss Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting ML23355A0762024-01-0404 January 2024 Summary of Public Meeting with X-Energy, Llc., to Discuss Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting ML24004A0212024-01-10010 January 2024 Summary of Public Meeting with X-Energy, Llc., Spent Fuel Management White Paper Project stage: Meeting ML24002B1662024-01-17017 January 2024 Enclosure 2: Xe-100 Graphite Engagement: Transient, Fatigue, and Seismic Assessment Methodology Presentation - Open Meeting - Non-Proprietary (Public) Project stage: Request PMNS20231413, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2024-01-17017 January 2024 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML24011A2402024-01-25025 January 2024 X-Energy, LLC - Xe-100 Fuel Qualification Update Project stage: Request PMNS20231412, Pre-Application Meeting with X-energy to Discuss Their Fuel Qualification Plan for the Xe-100 High Temperature Gas Reactor2024-01-25025 January 2024 Pre-Application Meeting with X-energy to Discuss Their Fuel Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML24017A2552024-01-31031 January 2024 X-Energy, LLC, Use of Meteorological Data for Project Long Mott Project stage: Request ML24060A0012024-02-29029 February 2024 Meeting Summary - December 7, 2023 Public Meeting with X-Energy to PSAR Chapter 2 Project stage: Meeting ML24067A3002024-03-25025 March 2024 Letter - Request for Withholding Information from Public Disclosure for X Energy, LLC XE-100 Pre-Application Engagement Presentation Materials (EPID No. L-2018-RM-0076) Project stage: Withholding Request Acceptance ML24093A0852024-04-15015 April 2024 Summary of the January, 2024, Public Meeting with X Energy, LLC (X-Energy), XE-100 Fuel Qualification Update Project stage: Meeting ML24109A2872024-04-25025 April 2024 December 12 2023 Meeting Summary of Public Meeting with X-Energy to Discuss Principal Design Criteria Project stage: Meeting ML24109A2932024-04-25025 April 2024 January 31 2024 Meeting Summary of Public Meeting with X-Energy to Meteorological Data for Project Long Mott (1).docx Project stage: Meeting ML24122A9922024-05-23023 May 2024 Summary of the January 17, 2024 Public Meeting with X Energy, Llc. Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting 2023-06-21
[Table View] |
Text
MEMORANDUM TO:
Michael Wentzel, Chief Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Jorge Hernandez, Project Manager Advanced Reactor Licensing Branch 2 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE JANUARY 17, 2024, PUBLIC MEETING WITH X ENERGY, LLC. (X-ENERGY), APPROACH FOR GRAPHITE QUALIFICATION FOR THE XE-100 HIGH TEMPERATURE GAS REACTOR (EPID NO. L-2018-LRM-0076)
Meeting Information:
Applicant: X ENERGY, LLC. (X-energy)
Docket/Project No.(s): 99902071 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML24017A127 Applicant Presentation Slides ADAMS Accession No.: ML24002B166 Meeting Attendees: See the enclosure for a list of meeting attendees.
CONTACT:
Jorge Hernandez, NRR/DANU (301) 287-9096 May 23, 2024 Signed by Hernandez Munoz, Jorge on 05/23/24
M. Wentzel
Background:
By letter dated July 31, 2023 (ML23212B211), X-energy transmitted a regulatory engagement plan focused on material qualification of graphite and other graphite-related matters, along with the proposed schedule for the meetings.
Prior to this meeting, the following meetings have been held, in accordance with the aforementioned regulatory engagement plan:
August 24, 2023 (ML23271A128): partially closed meeting to discuss scope of graphite qualification and methodologies that will be included in the Preliminary Safety Analysis Report (construction permit) for the Xe-100 reactor at the Dow Chemical Company facility in Long Mott, TX and referenced technical reports and the information that is planned to be provided in the Final Safety Analysis Report at the operating license application stage.
October 5, 2023 (ML23319A239): partially closed meeting to discuss X-energys modelling approach for the stress analysis of irradiated graphite components.
October 12, 2023 (ML23319A359): partially closed meeting to discuss development of X-energys proprietary computer model, named Irradiated Graphite Numerical Iterative Solver (IGNIS).
November 9, 2023 (ML23355A076): partially closed meeting to discuss the design loadings and service level definitions for the graphite core assembly.
The meeting summaries are collected in ADAMS Package No. ML23271A128, Meeting Summary - X-energy Graphite Qualification Engagement Meetings Series (2023/2024).
Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271).
This meeting was the fifth meeting included in X-energys regulatory engagement plan for graphite components.
The X-energys staff presentation discussed the following topics:
The methodologies that X-energy intends to use for the consideration of transient and seismic events that will impact the graphite core assembly.
An introduction to the Price model, the fatigue analysis method that will be used, and homologous stress as used in the model.
A description of the effects of temperature, volume, and irradiation on graphite fatigue life.
The seismic qualification framework and reasoning behind the use of the intended approach.
A description of how X-energy will validate and verify the seismic model through software commercial grade dedication and testing.
M. Wentzel The NRC staff made the following questions/observations (including X-energys responses):
The NRC staff asked X-energy what quality assurance programs they will be committing to for data quality and software. X-energy indicated that this will be addressed in future technical report submittals.
The NRC staff asked about the use of test data to model fatigue of graphite components.
X-energy responded that it does not expect fatigue to be a significant degradation mechanism; however, it acknowledged the question to address in future licensing submittals.
The NRC staff discussed the topic of low-frequency and high-consequence seismic event sequences to be analyzed as part of the probabilistic risk assessment as the design matures when implementing the Licensing Modernization Project process in RG 1.233, Guidance for Technology-Inclusive, Risk-Informed, and Performance-Based Approach to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors (ML20091L698). X-energy stated that it understands the issue, which is an industrys generic challenge, and will work with the NRC staff in the future as necessary.
The NRC staff questioned if Miner's Rule can be applied to graphite. X-energy responded in the affirmative.
No regulatory decisions were made as a result of this meeting.
Project No. 99902071
Enclosure:
List of Meeting Attendees cc: X-energy Xe-100 via GovDelivery
ML24122A992 NRR-106 OFFICE NRR/DANU/UAL2/PM NRR/DANU/UTB1/BC NRR/DANU/UAL2/BC NAME JHernandez GOberson MWentzel DATE 05/01/2024 05/23/2024 05/23/2024 OFFICE NRR/DANU/UAL2/PM NAME JHernandez DATE 05/23/2024
Enclosure List of Meeting Attendees For the January 17, 2024 Public Meeting With X Energy, LLC. (X-Energy), Approach for Graphite Qualification for the Xe-100 High Temperature Gas Reactor Open Meeting Name Organization Christopher Welch U.S. Nuclear Regulatory Commission (NRC)
Dan Beacon NRC Greg Oberson NRC Ian Jung NRC James Gaslevic NRC Jorge Hernandez Munoz NRC Jose Pires NRC Joseph Bass NRC Madhumita Sircar NRC Matthew Gordon NRC Vince Voltaggio NRC Doug Kalinousky X-energy Emna Sghaier X-energy FJ van Zanten X-energy Jaime A Cano X-energy James Roll X-energy Jasmine Wang X-energy Jim Fogarty X-energy Jon Facemire X-energy Maggie Staiger X-energy Sam Baylis X-energy Steve Vaughn X-energy Tim Lucas X-energy Alex Dean X-energy (contractor)
Gwennael Beirnaert X-energy (contractor)
Michael Saitta X-energy (contractor)
Mark Feltner Dow William E. Windes Idaho National Laboratory Addison Hall Dominion Energy Chuck Marks Dominion Energy David Gross Dominion Energy James A. Brownell Energy Northwest Lisa L. Williams Energy Northwest Steven Pope Information Systems Laboratory Nicole Schlichting Kairos Power Ali Member of Public Chong Chen Member of Public Douglas J. Roll Member of Public Raja sekhar Tripuraneni Member of Public Tom Roberts Member of Public Nassia Tzelepi National Nuclear Laboratory Benjamin D. Kosbab SGH Jordan M. Seawright SGH
2 Name Organization Michael Scott DeFilippis Tennessee Valley Authority Keith W. Means Westinghouse Zefeng Yu Westinghouse Closed Meeting Name Organization Alexander Chereskin NRC Christopher Welch NRC Dan Beacon NRC Greg Oberson NRC Ian Jung NRC James Gaslevic NRC Jorge Hernandez Munoz NRC Joseph Bass NRC Jose Pires NRC Madhumita Sircar NRC Yamir Diaz-Castillo NRC Doug Kalinousky X-energy Emna Sghaier X-energy FJ van Zanten X-energy Jaime A Cano X-energy James Roll X-energy Jasmine Wang X-energy Jim Fogarty X-energy Jon Facemire X-energy Maggie Staiger X-energy Sam Baylis X-energy Steve Vaughn X-energy Tim Lucas X-energy Alex Dean X-energy (contractor)
Benjamin D. Kosbab X-energy (contractor)
Gwennael Beirnaert X-energy (contractor)
Jordan M. Seawright X-energy (contractor)
Michael Saitta X-energy (contractor)