Letter Sequence Withholding Request Acceptance |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML19130A1672019-05-14014 May 2019 May 8, 2019 Summary of Teleconference with Northern States Power Company, Doing Business as Xcel Energy, to Discuss a Response to a Request for Additional Information Related to the License Amendment Request to Adopt 10 CFR 50.69 Project stage: RAI ML23087A0222023-03-15015 March 2023 Submittal of X Energy, LLC (X-energy) Xe-100 Slide Deck, Control Room Operator Qualification Discussion Project stage: Request PMNS20230299, Meeting with X Energy, LLC Regarding the Structure of the Xe-100 Construction Permit Application2023-03-22022 March 2023 Meeting with X Energy, LLC Regarding the Structure of the Xe-100 Construction Permit Application Project stage: Meeting PMNS20230339, Meeting with X Energy, LLC Regarding the Xe-100 Slide Deck Control Room Operator Qualification Discussion2023-04-0505 April 2023 Meeting with X Energy, LLC Regarding the Xe-100 Slide Deck Control Room Operator Qualification Discussion Project stage: Request ML23104A4352023-04-14014 April 2023 Submittal of X Energy, LLC (X-energy) Slides for Xe-100 White Paper, Graphite Material Qualification Project stage: Request PMNS20230413, Discussion of the X-energy White Paper, Graphite Qualification Methodology2023-04-18018 April 2023 Discussion of the X-energy White Paper, Graphite Qualification Methodology Project stage: Request ML23159A0202023-06-13013 June 2023 Letter and Enclosure 1 - Summary of the April 17, 2023, Closed Meeting with X-Energy, LLC Regarding the XE-100 Slide Deck Control Room Operator Qualification Discussion Project stage: Meeting ML23172A2352023-06-21021 June 2023 Summary of Meeting with X-Energy, LLC Regarding the Structure of the XE-100 Construction Permit Application Project stage: Meeting ML23207A1882023-07-0808 July 2023 Summary for April 24, 2023 Partially-closed Meeting with X-energy Regarding the Graphite Material Qualification Methodology White Paper - Redacted Project stage: Meeting ML23212B2112023-07-31031 July 2023 Submittal of X Energy, LLC (X-energy) Xe-100 Graphite Qualification Regulatory Engagement Plan Project stage: Request ML23258A1052023-09-15015 September 2023 X-Energy, LLC, Xe-100 Spent Fuel Management Licensing Approach White Paper Project stage: Request PMNS20231062, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-09-21021 September 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting PMNS20231063, Pre-Application Meeting with X-energy to Discuss the Proposed White Paper on Spent Fuel Management for the Xe-100 High Temperature Gas Reactor2023-09-25025 September 2023 Pre-Application Meeting with X-energy to Discuss the Proposed White Paper on Spent Fuel Management for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML23271A2562023-10-12012 October 2023 X-Energy, LLC, Xe-100 Graphite Engagement: Xe-100 Graphite Engagement: Ignis Graphite Modeling Toolset Used in Xe-100 Analyses and Qualification Approach Project stage: Request PMNS20231069, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-10-12012 October 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting PMNS20231213, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2023-11-0606 November 2023 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML23303A2082023-11-0909 November 2023 X-Energy, LLC, Xe-100 Graphite Engagement: ASME Service Level Definition, LBE Mapping, and Design Loadings for Graphite Core Assembly Project stage: Request ML23325A2412023-11-21021 November 2023 X-Energy, LLC, Xe-100 Preliminary Safety Analysis Report (PSAR) Chapter 2 Site Characteristics and Environmental Report Project stage: Request PMNS20231302, Notice of Meeting with X Energy, LLC2023-11-29029 November 2023 Notice of Meeting with X Energy, LLC Project stage: Request ML23319A2392023-11-30030 November 2023 October 5 2023 Meeting Summary Public Meeting with X-Energy to Discuss Graphite Qualification Project stage: Meeting ML23332A7652023-12-12012 December 2023 X-Energy, LLC, Xe-100 Principal Design Criteria (PDC) Project stage: Request ML23244A2732023-12-31031 December 2023 Enclosure 2: X-Energy, LLC, Presentation Materials - Xe-100 Graphite Engagement: Material Model Project stage: Request ML23319A3592024-01-0404 January 2024 Summary of Public Meeting with X-Energy, Llc., to Discuss Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting ML23355A0762024-01-0404 January 2024 Summary of Public Meeting with X-Energy, Llc., to Discuss Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting ML24004A0212024-01-10010 January 2024 Summary of Public Meeting with X-Energy, Llc., Spent Fuel Management White Paper Project stage: Meeting ML24002B1662024-01-17017 January 2024 Enclosure 2: Xe-100 Graphite Engagement: Transient, Fatigue, and Seismic Assessment Methodology Presentation - Open Meeting - Non-Proprietary (Public) Project stage: Request PMNS20231413, Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor2024-01-17017 January 2024 Pre-Application Meeting with X-energy to Discuss the Proposed Graphite Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML24011A2402024-01-25025 January 2024 X-Energy, LLC - Xe-100 Fuel Qualification Update Project stage: Request PMNS20231412, Pre-Application Meeting with X-energy to Discuss Their Fuel Qualification Plan for the Xe-100 High Temperature Gas Reactor2024-01-25025 January 2024 Pre-Application Meeting with X-energy to Discuss Their Fuel Qualification Plan for the Xe-100 High Temperature Gas Reactor Project stage: Meeting ML24017A2552024-01-31031 January 2024 X-Energy, LLC, Use of Meteorological Data for Project Long Mott Project stage: Request ML24060A0012024-02-29029 February 2024 Meeting Summary - December 7, 2023 Public Meeting with X-Energy to PSAR Chapter 2 Project stage: Meeting ML24067A3002024-03-25025 March 2024 Letter - Request for Withholding Information from Public Disclosure for X Energy, LLC XE-100 Pre-Application Engagement Presentation Materials (EPID No. L-2018-RM-0076) Project stage: Withholding Request Acceptance ML24093A0852024-04-15015 April 2024 Summary of the January, 2024, Public Meeting with X Energy, LLC (X-Energy), XE-100 Fuel Qualification Update Project stage: Meeting ML24109A2872024-04-25025 April 2024 December 12 2023 Meeting Summary of Public Meeting with X-Energy to Discuss Principal Design Criteria Project stage: Meeting ML24109A2932024-04-25025 April 2024 January 31 2024 Meeting Summary of Public Meeting with X-Energy to Meteorological Data for Project Long Mott (1).docx Project stage: Meeting ML24122A9922024-05-23023 May 2024 Summary of the January 17, 2024 Public Meeting with X Energy, Llc. Approach for Graphite Qualification for the XE-100 High Temperature Gas Reactor Project stage: Meeting 2023-06-21
[Table View] |
Text
Mr. Stephen Vaughn Licensing Manager, Project Long Mott X Energy, LLC 801 Thompson Avenue Rockville, MD 20852
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR X ENERGY, LLC., XE-100 PRE-APPLICATION ENGAGEMENT PRESENTATION MATERIALS (EPID NO. L-2018-LRM-0076)
Dear Mr. Vaughn,
By five letters indicated in the table below, X Energy, LLC., submitted five affidavits, requesting that the information contained in the enclosures to the letters be withheld from public disclosure pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR).
Non-proprietary copies of these documents have been placed in the U.S. Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the NRCs Agencywide Documents Access and Management System.
Letter Accession No.
Letter/Affidavit Date Affidavit Executed by Information to be Withheld ML23222A268 August 10, 2023 Travis A. Chapman ML23244A271 September 1, 2023 Travis A. Chapman ML23271A254 September 28, 2023 Travis A. Chapman ML23303A205 October 30, 2023 Travis A. Chapman ML24002B163 January 2, 2024 Stephen Vaughn The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
a.
The information sought to be withheld from public disclosure in Enclosure 3 is owned by X-energy. This information was prepared with the explicit understanding that the information itself would be treated as proprietary and confidential and has been held in confidence by X-energy.
b.
The information sought to be protected in Enclosure 3 is not available to the public.
c.
The information contained in Enclosure 3 is of the type that is customarily held in confidence by X-energy, and there is a rational basis for doing so. The information X-energy is requesting to be withheld from public disclosure includes technical information related to the design, analysis and operations March 25, 2024
S. Vaughn associated with our Xe-100 high-temperature, gas-cooled, pebble bed advanced reactor design that directly impact our business development and commercialization efforts. X-energy limits access to this proprietary and confidential information in order to maintain confidentiality.
- d. contains information about the planned activities of X-energy related to the development of the Xe-100 design bases, TRISO-X fuel design bases, forecast design development timeframes, and relate to the commercialization strategy for our Xe-100 advanced reactor. Public disclosure of the information contained in Enclosure 3 would create substantial harm to X-energy because it would reveal valuable technical information regarding X-energys design development, competitive expectations, assumptions, current position and strategy. Its use by a competitor could substantially improve the competitors position in the design, manufacture, licensing, construction, and operation of a similar competing product.
e.
The Proprietary Information contained in Enclosure 3 is transmitted to the NRC in confidence and under the provisions of 10 CFR 2.390; it is to be received in confidence by the NRC.
f.
The Export-controlled Information contained in Enclosure 3 is transmitted to the NRC in confidence and under the provisions of 10 CFR 810 and 10 CFR 110; it must be withheld from disclosure and is to be received in confidence by the NRC.
We have reviewed your applications and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
S. Vaughn If you have any questions regarding this matter, I may be reached at (301) 287-9096 or via email at Jorge.Hernandez@nrc.gov.
Sincerely, Jorge Hernandez, Project Manager Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Project No: 99902071 cc: X-Energy Xe-100 via GovDelivery Signed by Hernandez Munoz, Jorge on 03/25/24
ML24067A300 NRR-106 OFFICE NRR/DANU/UAL2:PM NRR/DANU/UAL2:PM NRR/DANU/UAL2:LA NAME JHernandez AMuniz CSmith DATE 3/11/2024 3/15/2024 3/20/2024 OFFICE NRR/DANU/UAL2:BC NRR/DANU/UAL2:PM NAME MWentzel JHernandez DATE 3/25/2024 3/25/2024