Category:Letter type:RA
MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval2023-04-24024 April 2023 Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations2023-03-30030 March 2023 Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0055, Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 22023-03-24024 March 2023 Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 2 RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-02-0909 February 2023 Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2023-01-30030 January 2023 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-23-0027, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20222023-01-30030 January 2023 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2022 RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0347, Transmittal of Core Operating Limits Report2022-12-0202 December 2022 Transmittal of Core Operating Limits Report RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2022-11-0101 November 2022 Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-22-0245, Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.162022-09-0808 September 2022 Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)2022-08-0909 August 2022 Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary) RA-22-0210, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-07-28028 July 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0179, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2022-06-15015 June 2022 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes2022-05-24024 May 2022 Duke Energy Common Emergency Plan, Revision 2, Summary of Changes RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-022022-05-19019 May 2022 Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory2022-05-16016 May 2022 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-22-0106, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-04-28028 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections 2024-02-05
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0254, Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves2021-12-0909 December 2021 Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves RA-21-0076, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-12-0909 December 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-06-0909 June 2021 Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20093J0982020-08-21021 August 2020 Issuance of Amendment No. 269 Regarding Technical Specification Change Incorporating Three New Feedwater Bypass Isolation Valves RA-20-0007, Request to Correct Administrative Renewed Facility Operating License Error2020-01-21021 January 2020 Request to Correct Administrative Renewed Facility Operating License Error RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0206, Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses2018-11-0606 November 2018 Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses RA-18-0048, Corrected Technical Specification Pages for TSTF-425 License Amendment Request2018-09-25025 September 2018 Corrected Technical Specification Pages for TSTF-425 License Amendment Request ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program ML18099A1302018-04-0505 April 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. ML18038B2892018-02-0707 February 2018 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17205A2332017-09-29029 September 2017 Issuance of Amendment Regarding Request to Modify the Licensing Basis Alternate Source Term RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RNP-RA/16-0044, Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-09-16016 September 2016 Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0057, License Amendment Request to Modify the Licensing Basis Alternate Source Term2016-09-14014 September 2016 License Amendment Request to Modify the Licensing Basis Alternate Source Term ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0003, Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report...2016-02-0303 February 2016 Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report... RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress2016-02-0101 February 2016 License Amendment Request, Change in Corporate Form of Duke Energy Progress RNP-RA/15-0117, Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-12-22022 December 2015 Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And..2015-11-19019 November 2015 Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation2014-02-10010 February 2014 License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 82013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 RNP-RA/13-0002, License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements2013-06-0707 June 2013 License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements BSEP 13-0013, License Amendment Request to Facility Operating Licenses for Change of Licensee Name2013-04-20020 April 2013 License Amendment Request to Facility Operating Licenses for Change of Licensee Name RA-12-031, Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-09-12012 September 2012 Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones ML12263A4242012-09-0606 September 2012 License Amendment Request to Delete Technical Specification Reactor Protection System Trip on Steam Generator Water Level Low Coincident with Steam Flow/Feedwater Flow Mismatch RNP-RA/12-0057, License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*)2012-08-29029 August 2012 License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/12-0028, Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2012-06-0808 June 2012 Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.502011-03-30030 March 2011 Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 RNP-RA/10-0117, Request for Technical Specification Changes to Section 3.8.3, Diesel Fuel Oil and Starting Air, and Section 3.8.5, DC Sources - Shutdown2011-01-20020 January 2011 Request for Technical Specification Changes to Section 3.8.3, Diesel Fuel Oil and Starting Air, and Section 3.8.5, DC Sources - Shutdown RA-10-011, Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan2010-07-0808 July 2010 Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan 2023-08-30
[Table view] Category:Technical Specification
MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass2005-11-30030 November 2005 Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass 2023-05-25
[Table view] Category:Bases Change
MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions RNP-RA/04-0133, Transmittal of Technical Specifications Bases Revisions2004-10-21021 October 2004 Transmittal of Technical Specifications Bases Revisions RNP-RA/03-0038, Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron2003-05-28028 May 2003 Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron RNP-RA/03-0061, Transmittal of TS Bases Revisions2003-05-0202 May 2003 Transmittal of TS Bases Revisions RNP-RA/02-0118, Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source Term2002-08-14014 August 2002 Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source Term 2023-05-25
[Table view] |
Text
( ~ DUKE Laura A. Basta H. B. Robinson Steam Electric Plant Unit 2 ENERGY Site Vice President Duke Energy 3581 West Entrance Road Hartsville, SC 29550 843 951 1701 Laura.Basta@duke-energy.com Serial: RA-23-0121 10 CFR 50.90 October 5, 2023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23
SUBJECT:
License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area Ladies and Gentlemen:
Pursuant to 10 CFR 50.90, Duke Energy Progress, LLC (Duke Energy) is submitting a request for an amendment to the Technical Specifications (TS) for H. B. Robinson Steam Electric Plant (RNP), Unit No. 2. The proposed amendment would revise TS Section 5.7, High Radiation Area, consistent with NRC-approved TS Task Force (TSTF) traveler 258 (TSTF-258-A),
Revision 4, Changes to Section 5.0, Administrative Controls.
The Enclosure to this letter provides an evaluation of the proposed changes. Attachment 1 provides the existing TS pages marked to show the proposed changes.
The proposed changes have been evaluated in accordance with 10 CFR 50.91(a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the proposed changes involve no significant hazards consideration. The basis for this determination is included in the Enclosure.
Duke Energy requests approval of the proposed license amendment within one year of completion of the NRC's acceptance review. Once approved, Duke Energy will implement the amendment within 120 days.
This submittal contains no new regulatory commitments.
In accordance with 10 CFR 50.91, Duke Energy is notifying the state of South Carolina of this license amendment request by transmitting a copy of this letter to the designated state officials.
Should you have any questions concerning this letter, or require additional information, please contact Ryan Treadway, Director - Nuclear Fleet Licensing, at 980-373-5873.
U.S. Nuclear Regulatory Commission RA-23-0121 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on October 5, 2023.
Sincerely, Laura A. Basta Site Vice President
Enclosure:
Evaluation of the Proposed Change Attachments:
- 1. Marked-Up Technical Specifications Pages cc: (all with Enclosure/Atta chment)
L. Dudes , Regional Administrator USNRC Region II J. Zeiler, NRC Senior Resident Inspector L. Haeg , NRR Project Manager A. Wilson , Attorney General (SC)
R. S. Mack, Assistant Bureau Chief, Bureau of Environmenta l Health Services (SC)
L. Garner, Manager, Radioactive and Infectious Waste Management Section (SC)
Enclosure RA-23-0121 Page 1 of 8 Enclosure EVALUATION OF THE PROPOSED CHANGE 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION 2.1 Description of the Proposed Change 2.2 Description of Variations
3.0 TECHNICAL EVALUATION
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration Determination 4.4 Conclusions
5.0 ENVIRONMENTAL CONSIDERATION
6.0 REFERENCES
Enclosure RA-23-0121 Page 2 of 8 1.0
SUMMARY
DESCRIPTION Pursuant to 10 CFR 50.90, Duke Energy Progress, LLC (Duke Energy) is submitting a request for an amendment to the Technical Specifications (TS) for H. B. Robinson Steam Electric Plant (RNP), Unit No. 2. The proposed amendment would revise TS Section 5.7, High Radiation Area, consistent with NRC-approved TS Task Force (TSTF) traveler 258 (TSTF-258-A),
Revision 4, Changes to Section 5.0, Administrative Controls. The NRC approved TSTF-258-A, Revision 4, in a letter dated June 29, 1999 (Reference 1).
2.0 DETAILED DESCRIPTION 2.1 Description of the Proposed Change As shown in the TS markups provided in Attachment 1, TS Section 5.7 is replaced in its entirety with rewritten text. The proposed TS 5.7.1 describes the requirements for areas with dose rates less than or equal to 1.0 rem/hour at 30 centimeters (cm) from the radiation source, consistent with the current TS 5.7.1. The proposed TS 5.7.2 describes the requirements for areas with dose rates greater than 1.0 rem/hour at 30 cm from the radiation source, but less than 500 rads/hour at 1 meter from the radiation source, consistent with the current TS 5.7.2. There are no Bases for Section 5.7; therefore, there are no Bases changes required for this amendment request.
The significant changes proposed in Attachment 1, with respect to the current RNP TS, are summarized below:
- 1. The proposed TS 5.7.1 specifies its applicability is for areas not exceeding dose rates of 1.0 rem/hour at 30 cm from the radiation source. The current TS 5.7.1 specifies an equivalent radiation level of 1000 mrem/hour but is silent regarding distance from the radiation source.
- 2. The current TS 5.7.2 invokes the requirements of TS 5.7.1 by reference, whereas the proposed TS 5.7.1 and 5.7.2 each state their requirements explicitly.
- 3. The proposed TS 5.7.1.a specifies that barricades may be opened as necessary to permit entry or exit of personnel or equipment. Current TS are silent in this regard.
- 4. The proposed TS 5.7.1.b and 5.7.2.b specify that the Radiation Work Permit (RWP) includes specification of radiation dose rates and other radiation protection equipment and measures. The current TS are silent in this regard.
- 5. The current TS 5.7.1.b specifies that entry into the high radiation area may be made after dose rates in the area have been established and personnel are aware of them. In addition, current TS 5.7.1.c allows the option of being escorted by a radiation control technician performing periodic radiation surveillance to permit entry into the high radiation area. In the proposed TS, these two requirements are combined under TS 5.7.1.e (as well as under corresponding TS 5.7.2.e), with the exception that the proposed TS 5.7.1.e / 5.7.2.e does not specify performance of a periodic radiation surveillance. Furthermore, the proposed TS 5.7.1.e / 5.7.2.e specifies that the escorted personnel will receive a pre-job brief and that the dose rate determination, knowledge, and pre-job briefing requirements described in TS 5.7.1.e / 5.7.2.e do not require documentation prior to initial entry. The current TS are silent in this regard.
- 6. The proposed TS 5.7.1.d items 3 and 4 as well as TS 5.7.2.d items 2 and 3 are additional options to permit entry into the high radiation area that are not specified in the current TS.
- 7. The proposed TS 5.7.2.a allows the option of a continuously guarded door or gate in place of a locked door. The current TS does not specify this as an allowable option.
Enclosure RA-23-0121 Page 3 of 8
- 8. The proposed TS 5.7.2.a item 2 specifies that doors and gates shall remain locked except during periods of personnel or equipment entry or exit. The current TS are silent in this regard.
- 9. The proposed TS 5.7.2.d item 4 specifies a radiation monitoring device that continuously displays dose rates is an option if items 2 and 3 are impractical or inconsistent with the As Low As is Reasonably Achievable principle. The current TS allows this device as an option with no restrictions.
- 10. The proposed TS 5.7.2.c provides an exemption to RWP requirements for individuals qualified in radiation protection procedures. The current TS 5.7.2 specifies that this exemption is not allowed for areas with dose rates greater than 1000 mrem/hour.
- 11. The proposed TS 5.7.2.f provides requirements for a larger area where no enclosure exists or can reasonably be constructed. Current TS are silent in this regard.
2.2 Description of Variations Differences between the proposed RNP TS and the markups provided in TSTF-258-A are listed below:
- 1. The proposed TS 5.7.1.d item 1 utilizes a comma (,) after area instead of the semi-colon (;) utilized in TSTF-258-A. This punctuation change is an editorial difference to be consistent with other items in the TS 5.7.1.d list and does not affect the applicability of TSTF-258-A to the proposed change.
- 2. The proposed TS 5.7.2.a item 1 utilizes the title shift manager instead of the title shift supervisor utilized in TSTF-258-A. This is a change to reflect the title of the position who would be designated for the key control function at Duke Energy and does not affect the applicability of TSTF-258-A to the proposed change. See Section 3.0 for further discussion.
- 3. The TSTF-258-A TS 5.7.2.e contains an editorial error of an additional period (.) after the first sentence. This additional period is not included in the proposed TS. This is an editorial change and does not affect the applicability of TSTF-258-A to the proposed change.
3.0 TECHNICAL EVALUATION
The NRC approved TSTF-258-A, Revision 4, in a letter dated June 29, 1999 (Reference 1).
The justification provided in TSTF-258-A is repeated below with a disposition of applicability to the proposed RNP TS.
TSTF-258-A Section 5.7 Justification (first paragraph)
Section 5.7 is revised in accordance with 10 CFR 20.1601(c) and updates the acceptable alternate controls to those given in 10 CFR 20.1601. These changes are consistent (with the exception provided below) with the draft Generic Letter (93-XX) on proposed changes to STS NUREGs based on the new 10 CFR 20 and the letter from C. Grimes, NRC, to J. Davis, NEI dated April 9, 1997. (The NRC proposed version of Section 5.7 provided in the April 9, 1997 letter is included in this traveler with the recommended changes marked.)
Duke Energy disposition This justification applies to the proposed TS without exception. Furthermore, although the current RNP TS are different than the original TS that were modified by TSTF-258-A, the entire Section 5.7 is replaced with requirements that are consistent with the approved requirements in TSTF-258-A. The proposed TS Section 5.7 requirements are also consistent with the TS
Enclosure RA-23-0121 Page 4 of 8 Section 5.7 requirements in NUREG-1431, Standard Technical Specifications Westinghouse Plants. None of the differences between the current TS and the original TS modified by TSTF-258-A affect the applicability of TSTF-258-A to the proposed change.
TSTF-258-A Section 5.7 Justification (first bullet regarding exceptions)
- Changes to 5.7.1d.4.(ii): In the event that communications are lost between an individual worker, and the Radiation Protection staff providing the remote surveillance, the worker should be able to continue to work in the area provided that the worker can communicate with other workers in the same area who are working on the same job and under the same RWP, and provided that the communications remain satisfactory between these workers and the RP staff providing the remote surveillance..
Duke Energy disposition This justification applies to the proposed TS without exception.
TSTF-258-A Section 5.7 Justification (second bullet regarding exceptions)
- Changes to 5.7.1.e and 5.7.2.e: Revised to allow any individual or group of individuals to enter a high-high radiation area (dose rates > 1 Rem/hr at 30 cm) when accompanied by an individual qualified in radiation protection procedures with a radiation dose rate monitoring device. The qualified individual is responsible for providing positive control and shall perform periodic radiation surveillances at the frequency specified in the RWP.
Furthermore, these continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry. Many plants CTS requirements allow this option, which compliments the plants practices of requiring qualified individual escort at all times during the work in a high-high radiation area. This option would provide adequate protection while (keeping with ALARA practices) minimizing exposure to the qualified individual.
Duke Energy disposition This justification applies to the proposed TS without exception.
TSTF-258-A Section 5.7 Justification (third bullet regarding exceptions)
- Changes to 5.7.2a: Section 5.7.2a is revised to state Each entryway to such an area shall be conspicuously posted as a high radiation area and shall be provided with a locked or continuously guarded door or gate ... This change is consistent with RG 8.38 Section 2.5 which indicates that the use of a locked door or one control point where positive control over personnel entry is exercised. Posting an individual to monitor a door provides positive controls over a high radiation area.
Duke Energy disposition This justification applies to the proposed TS without exception.
Enclosure RA-23-0121 Page 5 of 8 TSTF-258-A Section 5.7 Justification (fourth bullet regarding exceptions)
- Changes to 5.7.2.a.1: The Shift Foreman is only one of the many possible operations shift management positions who may be designated for the key control function. This change is similar to the wording of the NRC 7-28-95 letter to the Owner's Group Chairmen which identifies key control responsibility with the "shift supervisor, radiation protection manager, or his or her designee."
Duke Energy disposition This justification applies to the proposed TS with the exception that the title shift manager is utilized in the proposed TS instead of shift supervisor or Shift Foreman. This is a change to reflect the title of the operations shift management position who would be designated for the key control function at Duke Energy and does not affect the applicability of TSTF-258-A to the proposed change.
TSTF-258-A Section 5.7 Justification (fifth bullet regarding exceptions)
- Changes to 5.7.2f. (deleting that is controlled as a high radiation area): The 5.7.2.f provision has applied (in previous STS as well as ISTS NUREGs) without the added constraint of having the larger area controlled as a high radiation area. It is not always practical to control such areas as a High Radiation Area (outside of these High-High Radiation Areas). The proposed change to the NRC proposed Model Specification would restore the requirement as it exists in ISTS NUREG Rev1.
Duke Energy disposition This justification applies to the proposed TS without exception.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria Section 20.1101, Radiation protection programs, of 10 CFR Part 20, Standards for Protection Against Radiation, requires licensees to develop, document, and implement a radiation protection program commensurate with the scope of licensed activities and sufficient to ensure compliance with the provisions of 10 CFR Part 20.
The regulations in 10 CFR 20.1601 establish requirements for controlling access to high radiation areas (HRAs). Paragraph (c) of 10 CFR 20.1601 allows for licensees to apply to the Commission for approval of alternative methods for controlling access to HRAs.
Regulatory Guide (RG) 8.38, Revision 1, Control of Access to High and Very High Radiation Areas in Nuclear Power Plants, describes methods the NRC staff finds acceptable for implementing the requirements applicable to the control of access to high and very high radiation areas (VHRAs) in nuclear power plants. Section 2.2 of RG 8.38 describes acceptable methods of exerting positive access control over entries into HRAs. Section 2.4 of RG 8.38 describes an acceptable alternative method to 10 CFR 20.1601(a) for access control to HRAs.
The regulations in 10 CFR 50.36, Technical specifications, establish the regulatory requirements related to the content of TS. In accordance with 10 CFR 50.36(c)(5), the TS must include administrative controls, which are the provisions relating to organization and
Enclosure RA-23-0121 Page 6 of 8 management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner.
NUREG-1431, Revision 5, Standard Technical Specifications Westinghouse Plants, is the NRC's approved standard TS for Westinghouse-designed nuclear power plants such as RNP.
The proposed TS are consistent with NUREG-1431 as described in Section 3.0 above.
This change does not affect plant compliance with the above regulations / guidance.
4.2 Precedent The proposed change is consistent with the current version of the Standard Technical Specifications, NUREG-1431, which includes TSTF-258-A. An example of plant-specific NRC approval of the changes in TSTF-258-A, Revision 4, related to high radiation area controls are the amendments for Indian Point Nuclear Generating Units 2 and 3 approved under safety evaluation dated December 13, 2006 (Reference 2). Note that the Indian Point amendments include TSTF-258-A changes beyond the high radiation area controls and are thus not in scope of this proposed change.
4.3 No Significant Hazards Consideration Determination Pursuant to 10 CFR 50.90, Duke Energy Progress, LLC (Duke Energy) is submitting a request for an amendment to the Technical Specifications (TS) for H. B. Robinson Steam Electric Plant (RNP), Unit No. 2. The proposed amendment would revise TS Section 5.7, High Radiation Area, consistent with NRC-approved TS Task Force (TSTF) traveler 258 (TSTF-258-A),
Revision 4, Changes to Section 5.0, Administrative Controls. The NRC approved TSTF-258-A, Revision 4, in a letter dated June 29, 1999 (Reference 1).
Duke Energy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, Issuance of amendment, as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change is related to the control of access to high radiation areas for controlling dose to plant personnel. The proposed change does not impact any accident initiators and does not alter the design, configuration, operation, or function of any plant structure, system, or component. The outcomes of previously evaluated accidents are unaffected. There is no impact on the source term or pathways assumed in accidents previously assumed. No analysis assumptions are violated and there are no adverse effects on the factors that contribute to offsite or onsite dose as the result of an accident.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
Enclosure RA-23-0121 Page 7 of 8
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change is related to the control of access to high radiation areas for controlling dose to plant personnel. No new accident scenarios, failure mechanisms, or limiting single failures are introduced as a result of the proposed change. The proposed change does not challenge the performance or integrity of any safety related system.
The proposed change neither installs nor removes any plant equipment, nor alters the design, physical configuration, or mode of operation of any plant structure, system, or component. No physical changes are being made to the plant, so no new accident causal mechanisms are being introduced.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
Margin of safety is related to the confidence in the ability of the fission product barriers to perform their design functions during and following an accident. These barriers include the fuel cladding, the reactor coolant system boundary, and the containment system.
The proposed change is related to the control of access to high radiation areas for controlling dose to plant personnel. The proposed change will have no effect on the availability, operability, or performance of the safety related systems and components.
The proposed change does not alter the design, configuration, operation, or function of any plant structure, system, or component. The ability of any operable structure, system, or component to perform its designated safety function is unaffected by the proposed change. There is no impact on the fission product barriers or parameters associated with licensed safety limits.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Duke Energy concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Enclosure RA-23-0121 Page 8 of 8
5.0 ENVIRONMENTAL CONSIDERATION
The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or a significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
6.0 REFERENCES
- 1. NRC letter regarding various TSTF traveler approvals, dated June 29, 1999 (ADAMS Accession Number ML16237A030)
- 2. NRC letter, Indian Point Nuclear Generating Unit Nos. 2 and 3 - Issuance of Amendments Re: Technical Specification Changes - Adoption of TSTF-258, TSTF-308, and Related Administrative Control Changes based on NUREG-1431 (TAC Nos.
MC9475 AND MC9476), dated December 13, 2006 (ADAMS Accession Number ML063050208)
RA-23-0121 Attachment 1 Marked-Up Technical Specifications Pages (6 Pages Follow)
High Radiation Area 5.7 5.0 ADMINISTRATI E CONTROLS 5.7 High Radiation Area In I ieu of the "control device" or "alarm signal" required by paragraph 20 ;1601(a) of 10 CFR 20 , each High Radi~tion Area in hich the intensity of radiation is 1000 mRem/hour or less s I be barricaded and conspicuously posted as a High Radiation rea and entrance thereto shall be control led by requiring is ance of Radiation Work Permit (RWP).
Rad tjon control personnel or personnel escorted y radiation contr personnel shall be exempt from the RWP
- suance requirem ts during the performance of their ssigned duties ithin the CA, provided they comply ith
protection p cedures for entry into Hi Radiation Areas.
Any individual or roup of individu s permitted to enter such areas shall be prov ed companied by one or more of the fol lo ing:
- a. A radiation mo that continuously indicates the radiation area.
- b. A radiation mo 1toring devic individual that contin usly integrates t radiation dose rate in the area and arms hen a preset . int rated .dose is received.
Entry i o such areas ith this mon or ing device may be made ter the dose rate levels in the rea have been I ished and personnel are a are oft m.
An individual qualified as a radiation contra technician ith a radiation dose rate monitoring device, is responsible for providing positive control overt activities ithin the area and shall perform period1 radiation surveillance at the frequency specified by t radiation control supervisor in the RWP .
Replace with new Section 5.7.1 and text above Section 5.7.1 from Insert 1 (continued)
HBRSEP Unit No. 2 5.0-29 Amendment No . m
High Radiation Area 5.7 5.7 High Radiation Area (continued)
The requirements of 5,7.1 shall apply to each Hi Area in hich the intensity of radiation is mRem/hour at 30 centimeters (12 i
- source or from any surf the Iess than 500 ter from the ra netrated by the radiat1 s shal I be provided to preven areas and the keys shal I strative control of the SS I supervisor.
sha 11 a Iso requiring an RWP . The exempt1
ements discussed in 5.7.1 is n any High Radiation Area in hich the intensit is greater than 1000 mRem/hour.
Replace with new Section 5.7.2 from Insert 1 HBRSEP Unit No. 2 5.0-30 Amendment No. 2
INSERT 1 As provided in paragraph 20.1601(c) of 10 CFR Part 20, the following controls shall be applied to high radiation areas in place of the controls required by paragraph 20.1601(a) and (b) of 10 CFR Part 20:
5.7.1 High Radiation Areas with Dose Rates Not Exceeding 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation
- a. Each entryway to such an area shall be barricaded and conspicuously posted as a high radiation area. Such barricades may be opened as necessary to permit entry or exit of personnel or equipment.
- b. Access to, and activities in, each such area shall be controlled by means of Radiation Work Permit (RWP) or equivalent that includes specification of radiation dose rates in the immediate work area(s) and other appropriate radiation protection equipment and measures.
- c. Individuals qualified in radiation protection procedures and personnel continuously escorted by such individuals may be exempted from the requirement for an RWP or equivalent while performing their assigned duties provided that they are otherwise following plant radiation protection procedures for entry to, exit from, and work in such areas.
- d. Each individual or group entering such an area shall possess:
- 1. A radiation monitoring device that continuously displays radiation dose rates in the area, or
- 2. A radiation monitoring device that continuously integrates the radiation dose rates in the area and alarms when the device's dose alarm setpoint is reached, with an appropriate alarm setpoint, or
- 3. A radiation monitoring device that continuously transmits dose rate and cumulative dose information to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area, or
INSERT 1 5.7.1 High Radiation Areas with Dose Rates Not Exceeding 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation (continued)
- 4. A self-reading dosimeter (e.g., pocket ionization chamber or electronic dosimeter) and, (i) Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring device that continuously displays radiation dose rates in the area; who is responsible for controlling personnel exposure within the area, or (ii) Be under the surveillance as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with individuals in the area who are covered by such surveillance.
- e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be made only after dose rates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry.
5.7.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation
- a. Each entryway to such an area shall be conspicuously posted as a high radiation area and shall be provided with a locked or continuously guarded door or gate that prevents unauthorized entry, and, in addition:
- 1. All such door and gate keys shall be maintained under the administrative control of the shift manager, radiation protection manager, or his or her designee.
- 2. Doors and gates shall remain locked except during periods of personnel or equipment entry or exit.
INSERT 1 5.7.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation (continued)
- b. Access to, and activities in, each such area shall be controlled by means of an RWP or equivalent that includes specification of radiation dose rates in the immediate work area(s) and other appropriate radiation protection equipment and measures.
- c. Individuals qualified in radiation protection procedures may be exempted from the requirement for an RWP or equivalent while performing radiation surveys in such areas provided that they are otherwise following plant radiation protection procedures for entry to, exit from, and work in such areas.
- d. Each individual or group entering such an area shall possess:
- 1. A radiation monitoring device that continuously integrates the radiation rates in the area and alarms when the device's dose alarm setpoint is reached, with an appropriate alarm setpoint, or
- 2. A radiation monitoring device that continuously transmits dose rate and cumulative dose information to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area with the means to communicate with and control every individual in the area, or
- 3. A self-reading dosimeter (e.g., pocket ionization chamber or electronic dosimeter) and, (i) Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring device that continuously displays radiation dose rates in the area; who is responsible for controlling personnel exposure within the area, or (ii) Be under the surveillance as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with and control every individual in the area.
INSERT 1 5.7.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation (continued)
- 4. In those cases where options (2) and (3), above, are impractical or determined to be inconsistent with the "As Low As is Reasonably Achievable" principle, a radiation monitoring device that continuously displays radiation dose rates in the area.
- e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be made only after dose rates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry.
- f. Such individual areas that are within a larger area where no enclosure exists for the purpose of locking and where no enclosure can reasonably be constructed around the individual area need not be controlled by a locked door or gate, nor continuously guarded, but shall be barricaded, conspicuously posted, and a clearly visible flashing light shall be activated at the area as a warning device.