Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area5 October 2023License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation AreaHigh Radiation Area
Fuel cladding
ML23145A16025 May 2023Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 January 2022Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Recently irradiated fuel
Power Uprate
RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections6 January 2022Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsStress corrosion cracking
Eddy Current Testing
RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .27 May 2021Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .
RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.12 October 2017Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.
RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions23 May 2017Transmittal of Technical Specifications Bases RevisionsOffsite Circuit
RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces27 September 2016Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement ProcessPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process23 June 2016Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement ProcessTime of Discovery
Fire Barrier
Tornado Missile
Internal Flooding
Incorporated by reference
Turbine Missile
ML16116A03324 April 2016Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2Anticipated operational occurrence
RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 51 February 2016Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5
RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions8 October 2015Transmittal of Technical Specifications Bases Revisions
RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication1 September 2015Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position IndicationPost Accident Monitoring
ML14188B01520 June 2014Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance CriterionOperational leakage
RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions29 April 2014Transmittal of Technical Specifications Bases RevisionsShutdown Margin
Nondestructive Examination
Missed surveillance
Operational leakage
RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication24 April 2013Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication
RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions17 September 2012Transmittal of Technical Specifications Bases RevisionsSafe Shutdown
Boric Acid
Stroke time
RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process10 February 2012Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement ProcessTime of Discovery
Incorporated by reference
Missed surveillance
RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions12 January 2011Transmittal of Technical Specifications Bases RevisionsQualified Offsite Circuit
RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation5 March 2010Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation InstrumentationOffsite Dose Calculation Manual
Recently irradiated fuel
RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions30 October 2007Transmittal of Technical Specifications Bases RevisionsSafe Shutdown
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Stress corrosion cracking
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Unidentified leakage
Operational leakage
ML07024048319 January 2007H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair CriteriaPost Accident Monitoring
Nondestructive Examination
Affidavit
Operational leakage
RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions6 April 2006Transmittal of Technical Specifications Bases RevisionsGrab sample
Anticipated operational occurrence
Hydrostatic
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Unidentified leakage
Operational leakage
RNP-RA/04-0133, Transmittal of Technical Specifications Bases Revisions21 October 2004Transmittal of Technical Specifications Bases Revisions
RNP-RA/03-0038, Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron28 May 2003Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved BoronFuel cladding
Depleted uranium
RNP-RA/03-0061, Transmittal of TS Bases Revisions2 May 2003Transmittal of TS Bases RevisionsTime to boil
Foreign Material Exclusion
Recently irradiated fuel
Power Uprate
RNP-RA/02-0118, Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source Term14 August 2002Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source TermOffsite Dose Calculation Manual
Recently irradiated fuel
Manual Operator Action