Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report5 February 2024Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX8 January 2024Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEXPacking leak
Offsite Dose Calculation Manual
Operating Basis Earthquake
Exemption Request
Earthquake
Pressure Boundary Leakage
Grace period
Unidentified leakage
Operational leakage
RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation14 December 2023Baffle-Former Bolt (Bfb) Subsequent Inspection Interval EvaluationFinite Element Analysis
Aging Management
Stress corrosion cracking
Affidavit
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation4 December 2023Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationExemption Request
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation16 November 2023RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes1 November 2023Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of ChangesExemption Request
Siren
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area5 October 2023License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation AreaHigh Radiation Area
Fuel cladding
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes20 September 2023Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of ChangesMet Tower
Exemption Request
RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology30 August 2023License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break MethodologySafe Shutdown Earthquake
Stress corrosion cracking
License Renewal
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
Affidavit
Operational leakage
RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks22 August 2023Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
Weld Overlay
Finite Element Analysis
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule12 July 2023Revision to Reactor Vessel Surveillance Capsule Withdrawal ScheduleLicense Renewal
Subsequent License Renewal
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require7 July 2023Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance RequireIncorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory7 June 2023Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory
RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.231 May 2023Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations30 May 2023Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 202226 April 2023Duke Energy Annual Radiological Environmental Operating Report - 2022Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.4626 April 2023Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46
RA-23-0046, Annual Radioactive Effluent Release Report - 202224 April 2023Annual Radioactive Effluent Release Report - 2022Annual Radioactive Effluent Release Report
RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval24 April 2023Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program IntervalSafe Shutdown
Boric Acid
Mission time
Stroke time
Nondestructive Examination
Incorporated by reference
FLEX
Large early release frequency
Operability Determination
Cold shutdown justification
Maintenance Rule Program
Power Operated Valves
Grace period
Manual Operator Action
RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube5 April 2023Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator TubeNondestructive Examination
RA-23-0036, Biennial Decommissioning Financial Assurance Reports30 March 2023Biennial Decommissioning Financial Assurance Reports
RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations30 March 2023Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical EvaluationsBoric Acid
Affidavit
RA-23-0040, Onsite Property Insurance Coverage30 March 2023Onsite Property Insurance Coverage
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums30 March 202310 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
RA-23-0055, Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 224 March 2023Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 2License Renewal
Subsequent License Renewal
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)17 February 2023Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Weld Overlay
Hydrostatic
Finite Element Analysis
Flow Accelerated Corrosion
Stress corrosion cracking
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.29 February 2023Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2Boric Acid
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Surveillance Frequency Control Program
Operability Determination
Earthquake
Grace period
Backfit
GOTHIC
RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2 February 2023Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)30 January 2023Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)Post Accident Monitoring
RA-23-0027, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 202230 January 2023Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2022Annual Radioactive Effluent Release Report
RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)23 January 2023Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab5 December 2022Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab
RA-22-0347, Transmittal of Core Operating Limits Report2 December 2022Transmittal of Core Operating Limits ReportShutdown Margin
RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)1 November 2022Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)Post Accident Monitoring
RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections4 October 2022Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsNondestructive Examination
Operational leakage
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.21 September 2022License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.Surveillance Frequency Control Program
Fuel cladding
RA-22-0245, Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.168 September 2022Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16
RA-22-0239, Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)9 August 2022Technical Specifications Section 5.6.6. Post Accident Monitoring Instrumentation Report for Inoperable Safety Valve Position (Primary)Post Accident Monitoring
RA-22-0210, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections28 July 2022Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsNon-Destructive Examination
Stress corrosion cracking
Affidavit
RA-22-0179, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks15 June 2022Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes24 May 2022Duke Energy Common Emergency Plan, Revision 2, Summary of ChangesExemption Request
Minimum staff
Grace period
Siren
RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-0219 May 2022Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02
RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory16 May 202210 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified LaboratoryBlind Performance Test
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility13 May 2022Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations FacilityHealth Physics Network
High winds
RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)28 April 2022Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)Safe Shutdown
Qualified Offsite Circuit
Emergency Lighting
Fuel cladding
Offsite Circuit
RA-22-0106, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections28 April 2022Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsNon-Destructive Examination
Nondestructive Examination
Stress corrosion cracking
Affidavit
Operational leakage