ML23089A104

From kanterella
Jump to navigation Jump to search
Notification of Readiness for NRC 95001 Inspection
ML23089A104
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/30/2023
From: Pat Navin
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML23089A104 (1)


Text

Patrick D. Navin Site Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410-495-5200 Office 717-817-6827 Mobile www.constellation.com Pat.Navin@constellation.com March 30, 2023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 0001 Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Facility Operating License Nos. DPR-53 and DPR-69

Subject:

Notification of Readiness for NRC 95001 Inspection

References:

1. Letter from Daniel S. Collins (NRC) to David P. Rhoades (Constellation Energy Generation, LLC), Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Integrated Inspection Report 05000317/2022003 and 05000318/2022003 and Preliminary White Finding and Apparent Violation, dated November 7, 2022 (ADAMS Accession No. ML22311A045)
2. Letter from David C. Lew (NRC) to David P. Rhoades (Constellation Energy Generation, LLC), Calvert Cliffs Nuclear Power Plant, Unit 1 - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2022090, dated December 5, 2022 (ADAMS Accession No. ML22314A100)

In the Reference 1 letter, Constellation Energy Generation, LLC (CEG) was informed of an escalated enforcement action, EA-22-089, associated with a preliminary White finding and apparent violation 05000277/2022003-03, a failure to implement foreign material exclusion (FME) practices in accordance with site procedures. In the Reference 2 letter, the NRC provided a final significance determination of a White finding and notice of violation.

The NRC plans to conduct a supplemental inspection for this finding in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, following CEGs notification of readiness for this inspection.

This letter notifies the NRC that Calvert Cliffs is ready for the supplemental inspection.

There are no new regulatory commitments contained in this letter. If you should have any questions, please contact Mr. Larry Smith, Regulatory Assurance Manager, at 410-495-5219.