ML23027A052

From kanterella
Jump to navigation Jump to search
Global Nuclear Fuel- Americas, LLC, Revised ISA Summary Per 10CFR70.72(d)
ML23027A052
Person / Time
Site: 07001113
Issue date: 01/27/2023
From: Murray S
Global Nuclear Fuel - Americas
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML23027A051 List:
References
M230006
Download: ML23027A052 (1)


Text

Global Nuclear Fuel Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780, Mail Code K-84 Wilmington, NC 28402 Security-Related Information Notice USA This letter forwards sensitive security-related T 910 819 5950 information which is to be withheld from public Scott.Murray@ge.com disclosure in accordance with 10CFR2.390. The balance of this letter may be considered non-sensitive upon the removal of all of Attachments 1 and 2.

M230006 January 27, 2023 Director Office of Nuclear Material Safety & Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTN: Document Control Desk

Subject:

Revised ISA Summary per 10CFR70.72(d)

References:

(1) License SNM-1097, Docket 70-1113 (2) Letter, S.P. Murray to Director, ONMSS, 1/28/22, ISA Summary Rev. 25 Global Nuclear Fuel - Americas, LLC (GNF-A) in Wilmington, NC hereby submits this update to the Integrated Safety Analysis (ISA) Summary in order to provide revised summary pages, make corrections and modifications made to the ISA program and provide a brief summary of changes as stipulated by 10CFR70.72(d)(2) and (d)(3). This submittal replaces the January 28, 2022, ISA Summary submittal (Reference 2).

The following are provided as Attachments to this letter.

Attachment 1 contains a brief summary of all changes to the ISA records pursuant to 10CFR70.72(d)(2), and on-site documentation required by 10CFR70.62(a)(2) for the GNF-A facility excluding the Global Laser Enrichment (GLE) Test Loop.

Attachment 2 contains Revision 26 of the ISA Summary for the GNF-A facility excluding the GLE Test Loop. Within this Summary document, the pages or sections that have changed from Reference 2 above are shown with a vertical line in the right-hand margin.

GNF-A requests that Attachments 1 and 2 to this letter be withheld from public disclosure under 10 CFR 2.390 as they contain security-related information associated with our safety analyses &

risk assessments.

U.S. NRC.

Director, ONMSS Januaiy 27,2023 M230006 Page 2 of 2 Please note that the GLE Test Loop ISA summary update and summary ot-c~hangescue being - .:__O-'-

- pr:ovided*in a separate submittal. "(" * -- *

~ Please contact me on (91 0) 819-5950 if you have any questions -or woijla-_Jike to*-aisci:JsS"-tlils- c;;;:==-

- matter=-further. -- -- - -- -- - . .:.* -: .-_ -_--

Sincerely, Attachments: 1) Listing of All Changes Made During 2022 (security-related information) 2} Updated ISA Summary for the GNF-A facility, Rev. 26 (security-related information) * ,

cc:

NRC RegionaJ Administrator- Region II, Atlanta, GA J. Rowley,_NRC/NMSS/DFM/FFLB J. Rivera Ortiz, NRC/RII/DFFI SPM 23-003

-