Letter Sequence Other |
---|
EPID:L-2022-DOT-0007, E-61283 Enclosure 5, Orano NPS Statement of Proprietary Information for the Application for the Validation Request for the FCC-3 Package (Approved, Closed) |
Results
Other: ML22271A186, ML22271A189, ML22271A190, ML22271A450, ML22271A452, ML22271A454, ML22271A455, ML22271A458, ML22271A460, ML22271A461, ML22271A463, ML22271A465, ML22271A466, ML22271A468, ML22271A470, ML22271A471, ML22271A472, ML22271A474, ML22271A476, ML22271A477, ML22271A479, ML22271A481, ML22271A482, ML22271A484, ML22271A486, ML22271A487, ML22271A636, ML22271A637, ML22271A638, ML22271A639, ML22271A640, ML22271A641, ML22271A642, ML22271A643, ML22271A644, ML22271A645, ML22271A646, ML22271A647, ML22271A648, ML22271A649, ML22271A650, ML22271A675, ML22271A677, ML22271A678, ML22271A686, ML22271A688, ML22271A790, ML22271A791, ML22271A792, ML22271A793... further results
|
MONTHYEARML22271A6411998-08-19019 August 1998 E-61283 Enclosure 4, 009h1 Ap 2.1-8 TFXDC2108EN Npv, Revision B, Modified RCC Container - Proto 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A6392004-05-0404 May 2004 E-61283 Enclosure 4, 009G1 AP 2.1-7 TFXEDC2104-NPV, Rev. E, Modification of FCC Containers Choice of Prototype 2 Drop Configurations for Regulatory Tests (Public) Project stage: Other ML22271A8002004-10-29029 October 2004 E61283, Enclosure 4, 013c1 Appendix 2.5-3, Document No. FF/DC/01106 Revision a, E0, Safety/Criticality Study of FCC3v2 Containers 14 X 14 8 Foot and 14 X 14 10 Foot Assemblies (Public) Project stage: Other ML22271A8022007-12-19019 December 2007 E61283, Enclosure 4, 013d1 Appendix 2.5-4, FF DC 04191, Revision B, Safety/Criticality Study for FCC4 Packages & 17x17XL Assemblies Justification for an Increased Cavity Cross Section (Public) Project stage: Other ML22271A6462009-01-0101 January 2009 E-61283 Enclosure 4, 009c1 Ap 2.1-3 Document No. NTC-08-00135891E-NPV, Revision No. 01E, Analysis of the Fatigue Strength of the FCC3/FCC4 Containers (Public) Project stage: Other ML22271A4702009-05-0101 May 2009 E-61283 Enclosure 4, 009a1 Appendix 2.1-1, FFDC05090-A EN Npv, FCC3 Containers - Lashing Diagrams (Public) Project stage: Other ML22271A8162009-06-27027 June 2009 E-61283 Enclosure 4, 010d1 Appendix 2.2-4, NTC-08-00118662E-NPV, Rev. 1E, Note on the Characterization of Resin Fs 69 Project stage: Other ML22271A6442010-07-0101 July 2010 E-61283 Enclosure 4, 009b1 Ap 2.1-2 F2, Document No. NEEL-F 2008 DC 117EN, Revision B, FCC3 Containers for Fresh Fuel Assemblies Data for the Fatigue Strength Analysis of the Lifting Boxes and Upper Shell (Public) Project stage: Other ML22271A8152012-04-0202 April 2012 E-61283 Enclosure 4, 010d Appendix 2.2-4 DOS-13-00081778-204-NPV, Rev. 00, Reference to 10373-B-1, Revision 3, Summary Note on the Characterization of Fs 69 Resin Project stage: Other ML22271A4712012-04-30030 April 2012 E-61283 Enclosure 4, 009b Appendix 2.1-2, Document No. DOS-13-00081779-102-NPV, Revision 00, FCC3 Containers for Fresh Fuel Assemblies – Data for Fatigue Resistance Analysis of Lifting Boxes and Upper Shell (Public) Project stage: Other ML22271A4682012-04-30030 April 2012 E-61283 Enclosure 4, 009a Appendix 2.1-1, Document No. DOS-13-00081779-101-NPV, Revision 00, Table of Contents, FCC3 Containers - Tie-down Diagrams, Areva (Public) Project stage: Other ML22271A4542012-04-30030 April 2012 E-61283 Enclosure 4, 003d Appendix 1.4-4, Document No. DOS-13-00081779-044-NPV, Revision 00, Table of Contents, Photographs of the FCC3 Package (Public) Project stage: Other ML22271A4522012-04-30030 April 2012 E-61283 Enclosure 4, 003c Appendix 1.4-3, Document No. DOS-13-00081778-043-NPV, Revision 00, Table of Contents, Summary of Toughness Tests Project stage: Other ML22271A4772012-04-30030 April 2012 E-61283 Enclosure 4, 002a Appendix 1.3-1,Document No. DOS-13-00081779-031-NPV, Revision 00, Appendix 1.3-1 - Description of Fuel Rod Boxes for FCC3 Containers (Public) Project stage: Other ML22271A4792012-04-30030 April 2012 E-61283 Enclosure 4, 002b Ap 1.3-2 DOS-13-00081779-032-NPV, Revision 00, Appendix 1.3-2 - Drawing of Fuel Rod Boxes for FCC3 Containers (Public) Project stage: Other ML22271A6432012-04-30030 April 2012 E-61283 Enclosure 4, 009j Ap 2.1-10 DOS-13-00081778-110-NPV, Revision 00, Container Prototype No. 2, Drop Test Report (Public) Project stage: Other ML22271A6422012-04-30030 April 2012 E-61283 Enclosure 4, 009i Ap 2.1-9 DOS-13-00081778-109-NPV, Revision 00, Container Prototype No. 1, Drop Test Report (Public) Project stage: Other ML22271A6402012-04-30030 April 2012 E-61283 Enclosure 4, 009h Ap 2.1-8 DOS-13-00081778-108-NPV, Revision 00, Modified RCC Container - Prototype 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A4842012-04-30030 April 2012 E-61283 Enclosure 4, 002d Appendix 1.3-4, Document No. DOS-13-00081778-034-NPV, Revision 00, Appendix 1.3-4 - Test Report Leaching of Enriched Reprocessed Uranium (Eru) Pellets (Public) Project stage: Other ML22271A6382012-04-30030 April 2012 E-61283 Enclosure 4, 009g Ap 2.1-7 DOS-13-00081778-107-NPV, Modification of RCC Containers - Selection of Drop Configurations for Prototype 2 in the Context of Regulatory Tests (Public) Project stage: Other ML22271A8012012-09-0303 September 2012 E61283, Enclosure 4, 013d Appendix 2.5-4 (FCC3-FCC4), DOS-13-00081778-504-00-NPV, Rev. 00, Reference to Ffdc 04191, Rev. B, Safety/Criticality Study for FCC4 Packages and 17x17 Xl Assemblies Justification for an Increased Cavity Cross Secti Project stage: Other ML22271A4502012-09-30030 September 2012 E-61283 Enclosure 4, 003b Appendix 1.4-2. Document No. DOS-13-00081779-042-NPV, Revision 1, Drawings of the FCC3 Package, Version 2 (Public) Project stage: Other ML22271A6452013-04-30030 April 2013 E-61283 Enclosure 4, 009c Ap 2.1-3, Document No. DOS-13-00081778-103-NPV, Revision 00, Analysis of the Fatigue Behaviour of FCC3/FCC4 Containers, Tn International Document (Public) Project stage: Other ML22271A7902016-03-31031 March 2016 E-61283 Enclosure 4, 010e Appendix 2.2-5, Document No. DOS-13-00081778-205-NPV, Revision 00, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes (Public) Project stage: Other ML22271A8092017-09-0101 September 2017 E-61283 Enclosure 4, 009m Ap 2.1-13 DOS-13-00081778-113-NPV, Revision 2, Appendix 2.1-13 Complimentary Analysis of FCC Package Behaviour in Accidental Drop Conditions (Public) Project stage: Other ML22271A6372021-10-0808 October 2021 E-61283 Enclosure 4, 009f1 Ap 2.1-6 FFDC04223-EN Npv Revision 4.0, Transportation in FCC Container Mechanical Aspects Related to a Change in the Fuel Assembly Materias (Public) Project stage: Other ML22271A7992022-04-29029 April 2022 E-61283, Enclosure 4, 013c Appendix 2.5-3, Document No. DOS-13-00081778-503-NPV, Revision 00, Reference Document No. Ffdc 01106, Rev. a, Criticality-safety Analysis of FCC3 Containers Version 2 – Assembly Types 14x14 8-foot and 14x14 10-foo Project stage: Other ML22271A1892022-05-10010 May 2022 E-61283 Enclosure 1, Certificate of the French Competent Authority F/347/AF-96 (Gy), FCC-3 Transport Package (English Version) Project stage: Other ML22271A1902022-05-10010 May 2022 E-61283 Enclosure 2, Certificate of the French Competent Authority F/347/AF-96 (Gy), FCC-3 Transport Package (French Version) (Public) Project stage: Other ML22271A6502022-05-13013 May 2022 E-61283 Enclosure 4, 009e1 Ap 2.1-5, Framatome, Document No. D02-ARV-01-186-616, Revision a, FCC 3 - Containers for Fresh Fuel Assemblies - Stacking Behaviour (Non-proprietary) Project stage: Other ML22271A4742022-05-16016 May 2022 E-61283 Enclosure 4, DOS-19-021165-001-NPV, Version 2.0, Chapter 1.2, Administrative Information (Public) Project stage: Other ML22271A4762022-05-18018 May 2022 E-61283 Enclosure 4, 002 DOS-19-021165-002-NPV, Chapter 1.3, Specifications Relating to Radioactive Content (Public) Project stage: Other ML22271A8072022-05-18018 May 2022 E-61283 Enclosure 4, 009k Appendix 2.1-11, Document No. DOS-19-021165-011-NPV, Version 1.o, Justification of the Performance of the FCC3 Shell Fasteners During a 9m Vertical Drop (Public) Project stage: Other ML22271A4822022-06-0303 June 2022 E-61283 Enclosure 3, 002c1 Ap 1.3-3 Dwg FFDC05098-EN Npv, Revision 3.0, STR - Study Report (Public) Project stage: Other ML22271A1862022-07-21021 July 2022 E-61283 Enclosure 6, Document No. DOS-18-016471-000, Versions 1.0 and 5.0, Summary of Changes Between Version 1.0 to Version 2.0 for Safety Analysis Report for FCC-3 (File: Nte 22-005637-000-2.0-FCC3) (Public) Project stage: Other ML22271A4552022-08-0202 August 2022 E-61283 Enclosure 4, 003e Appendix 1.4-5, Document No. DOS-19-021166-010-NPV, Revision 0, Analysis of the Ageing Mechanisms of the Fcc3 and FCC4 Package Models (Public) Project stage: Other ML22271A1842022-08-0202 August 2022 E-61283 Enclosure 5, Orano NPS Statement of Proprietary Information for the Application for the Validation Request for the FCC-3 Package Project stage: Request ML22271A8142022-08-0303 August 2022 E-61283 Enclosure 4, 010c Appendix 2.2-3, FS1-0062270, Rev. 1 (DOS-18-016472-017 (En), Rev. 1), Behavior of Rod Made of M5 Framatome or Zircaloy-4 Alloy Subjected to the IAEA Thermal Test in FCC Packaging (Public) Project stage: Other ML22271A1882022-08-0303 August 2022 E-61283, Transmittal Letter from Orano to DOT, Application for Validation of French Competent Authority Certificate F/347/AF-96 for Model No. FCC-3 Transport Package Project stage: Request ML22271A8112022-08-0303 August 2022 E-61283 Enclosure 4, 010 Chapter 2.2, Document No. DOS-19-021165-013-NPV, Version 1.0, Thermal Analysis (New Reference DOS-19-021165-013, Revision 1.0) (Public) Project stage: Other ML22271A7912022-08-0303 August 2022 E-61283 Enclosure 4, 010f Appendix 2.2-6 Document No. DOS-13-00081778-206-NPV, Revision 0, Thermal Behaviour of the FCC Packaging Under Normal Conditions of Transport (Public) Project stage: Other ML22271A8132022-08-0303 August 2022 E-61283, Enclosure 4, 010a1 Ap 2.2.1 FFP_D02-ARV-01-198-455, Revision a, Justification by CFO Simulation of the Thermal Behavior of the FCC Container; Replacing Former Chapters 2.2-1 (Pved DC 04 055) and 2.2-2 (NEPL-F 2018 DC 152) (Public) Project stage: Other ML22271A8122022-08-0303 August 2022 E-61283, Enclosure 4, 010a Appendix 2.2-1, DOS-19-021165-018-NPV, Version 1.0, Reference to D02-ARV-01-198-455 (Translation of D02-ARV-01- 167-814), Justification by Cfd Simulation of the Thermal Behavior of the FCC Container Project stage: Other ML22271A6772022-08-0303 August 2022 E-61283 Enclosure 4, 013a1 Appendix 2.5-1, Document No. FF/DC/00817 E0, Safety/Criticality Study of of FCC3 and FCC4 Containers 15x15 and 17x17 Assemblies 17x17 Xl, 17x17 EPR, 16x16 and 18x18 Assemblies (Non-Proprietary) Project stage: Other ML22271A6782022-08-0303 August 2022 E-61283 Enclosure 4, 013b Appendix 2.5-2, Document No. DOS-19-021165-016, Version 1.0, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes Project stage: Other ML22271A8102022-08-0303 August 2022 E-61283 Enclosure 4, 009n Appendix 2.1-14 DOS-19-021165-012-NPV, Version 1.0, Variation in the Mechanical Properties of Shell and Screw Steels Between 40°C …(Public) Project stage: Other ML22271A7922022-08-0303 August 2022 E-61283 Enclosure 4, 012 Appendix 2.4, Document No. DOS-13-00081778-400, Revision 1, Analysis of External Dose Rates (Public) Project stage: Other ML22271A8062022-08-0303 August 2022 E-61283 Enclosure 4, 013f, Appendix 2.5-6, Document No. FFDC00561EN, Criticality Safety Study-Fresh UO2 Fuel Transportation casks-Determining the Uncertainties Using Cristal, Revision 4 (Public) Project stage: Other ML22271A8082022-08-0303 August 2022 E-61283 Enclosure 4, 009l Appendix 2.1-12 DOS-13-00081778-112-NPV, Rev. 1, Appendix 2.1-12 FCC Packaging Rod Boxes - Proof of the Mechanical Strength of Box Equipment (Public) Project stage: Other ML22271A7982022-08-0303 August 2022 E-61283 Enclosure 4, 013b1 Appendix 2.5-2, Document No. FFDC01046E E0, Non-Proprietary, Safety/Criticality Study of Fcc3 and Fcc4 Containers Transport of Fuel Rods in Boxes (Public) Project stage: Other 2013-04-30
[Table View] |
|
---|
Category:Quality Assurance Program
MONTHYEARML22271A4652022-08-18018 August 2022 E-61283 Enclosure 4, 008 Chapter 1.9, Document No. DOS-19-021165-008-NPV, Version 1.0, Chapter 1.9 - Quality Assurance 2022-08-18
[Table view] Category:Report
MONTHYEARML22271A4582022-08-18018 August 2022 E-61283 Enclosure 4, 004 Chapter 1.5, Document No. DOS-19-021165-003-NPV, Version 2.0, Chapter 1.5 - Package Performance Characteristics (Public) ML22271A4862022-08-18018 August 2022 E-61283 Enclosure 4, 003 Chapter 1.4, Document No. DOS-19-021165-005-NPV, Version 1.0, Chapter 1.4 - Specifications Relating to the Packaging (Public) ML22271A4602022-08-18018 August 2022 E-61283 Enclosure 4, 005 Chapter 1.6, Document No. DOS-19-021165-004-NPV, Version 2.0, Chapter 1.6 - Compliance with Regulatory Requirements ML22271A4612022-08-18018 August 2022 E-61283 Enclosure 4, 006 Chapter 1.7, Document No. DOS-19-021165-006-NPV, Version 1.0, Chapter 1.7 - Instruction for Use of Packaging (Public) ML22271A4632022-08-18018 August 2022 E-61283 Enclosure 4, 007 Chapter 1.8, Document No. DOS-19-021165-007-NPV, Version 1.0, Chapter 1.8 - Maintenance Programme (Public) ML22271A4652022-08-18018 August 2022 E-61283 Enclosure 4, 008 Chapter 1.9, Document No. DOS-19-021165-008-NPV, Version 1.0, Chapter 1.9 - Quality Assurance ML22271A4812022-08-18018 August 2022 E-61283 Enclosure 4, 002c Ap 1.3-3 DOS-19-021165-021-NPV, Version 1.0, Appendix 1.3-3 - Impact Strength of Zr Alloys ML22271A4662022-08-18018 August 2022 E-61283 Enclosure 4, 009, Document No. DOS-19-021165-010-NPV, Version 1.0, Chapter - 2.1 Structural Analysis ML22271A8132022-08-0303 August 2022 E-61283, Enclosure 4, 010a1 Ap 2.2.1 FFP_D02-ARV-01-198-455, Revision a, Justification by CFO Simulation of the Thermal Behavior of the FCC Container; Replacing Former Chapters 2.2-1 (Pved DC 04 055) and 2.2-2 (NEPL-F 2018 DC 152) (Public) ML22271A8102022-08-0303 August 2022 E-61283 Enclosure 4, 009n Appendix 2.1-14 DOS-19-021165-012-NPV, Version 1.0, Variation in the Mechanical Properties of Shell and Screw Steels Between 40°C …(Public) ML22271A8082022-08-0303 August 2022 E-61283 Enclosure 4, 009l Appendix 2.1-12 DOS-13-00081778-112-NPV, Rev. 1, Appendix 2.1-12 FCC Packaging Rod Boxes - Proof of the Mechanical Strength of Box Equipment (Public) ML22271A4552022-08-0202 August 2022 E-61283 Enclosure 4, 003e Appendix 1.4-5, Document No. DOS-19-021166-010-NPV, Revision 0, Analysis of the Ageing Mechanisms of the Fcc3 and FCC4 Package Models (Public) ML22271A1862022-07-21021 July 2022 E-61283 Enclosure 6, Document No. DOS-18-016471-000, Versions 1.0 and 5.0, Summary of Changes Between Version 1.0 to Version 2.0 for Safety Analysis Report for FCC-3 (File: Nte 22-005637-000-2.0-FCC3) (Public) ML22271A4822022-06-0303 June 2022 E-61283 Enclosure 3, 002c1 Ap 1.3-3 Dwg FFDC05098-EN Npv, Revision 3.0, STR - Study Report (Public) ML20211L6882019-08-14014 August 2019 Redacted-French Approval Certificate of a Package Design, Number F/347/AF-96 (Revision Fs) in French ML22271A8092017-09-0101 September 2017 E-61283 Enclosure 4, 009m Ap 2.1-13 DOS-13-00081778-113-NPV, Revision 2, Appendix 2.1-13 Complimentary Analysis of FCC Package Behaviour in Accidental Drop Conditions (Public) ML22271A4502012-09-30030 September 2012 E-61283 Enclosure 4, 003b Appendix 1.4-2. Document No. DOS-13-00081779-042-NPV, Revision 1, Drawings of the FCC3 Package, Version 2 (Public) ML22271A4842012-04-30030 April 2012 E-61283 Enclosure 4, 002d Appendix 1.3-4, Document No. DOS-13-00081778-034-NPV, Revision 00, Appendix 1.3-4 - Test Report Leaching of Enriched Reprocessed Uranium (Eru) Pellets (Public) ML22271A4712012-04-30030 April 2012 E-61283 Enclosure 4, 009b Appendix 2.1-2, Document No. DOS-13-00081779-102-NPV, Revision 00, FCC3 Containers for Fresh Fuel Assemblies – Data for Fatigue Resistance Analysis of Lifting Boxes and Upper Shell (Public) ML22271A4682012-04-30030 April 2012 E-61283 Enclosure 4, 009a Appendix 2.1-1, Document No. DOS-13-00081779-101-NPV, Revision 00, Table of Contents, FCC3 Containers - Tie-down Diagrams, Areva (Public) ML22271A4542012-04-30030 April 2012 E-61283 Enclosure 4, 003d Appendix 1.4-4, Document No. DOS-13-00081779-044-NPV, Revision 00, Table of Contents, Photographs of the FCC3 Package (Public) ML22271A4522012-04-30030 April 2012 E-61283 Enclosure 4, 003c Appendix 1.4-3, Document No. DOS-13-00081778-043-NPV, Revision 00, Table of Contents, Summary of Toughness Tests ML22271A4772012-04-30030 April 2012 E-61283 Enclosure 4, 002a Appendix 1.3-1,Document No. DOS-13-00081779-031-NPV, Revision 00, Appendix 1.3-1 - Description of Fuel Rod Boxes for FCC3 Containers (Public) ML22271A6442010-07-0101 July 2010 E-61283 Enclosure 4, 009b1 Ap 2.1-2 F2, Document No. NEEL-F 2008 DC 117EN, Revision B, FCC3 Containers for Fresh Fuel Assemblies Data for the Fatigue Strength Analysis of the Lifting Boxes and Upper Shell (Public) ML22271A4702009-05-0101 May 2009 E-61283 Enclosure 4, 009a1 Appendix 2.1-1, FFDC05090-A EN Npv, FCC3 Containers - Lashing Diagrams (Public) ML22271A8022007-12-19019 December 2007 E61283, Enclosure 4, 013d1 Appendix 2.5-4, FF DC 04191, Revision B, Safety/Criticality Study for FCC4 Packages & 17x17XL Assemblies Justification for an Increased Cavity Cross Section (Public) ML22271A6392004-05-0404 May 2004 E-61283 Enclosure 4, 009G1 AP 2.1-7 TFXEDC2104-NPV, Rev. E, Modification of FCC Containers Choice of Prototype 2 Drop Configurations for Regulatory Tests (Public) 2022-08-03
[Table view] Category:Technical
MONTHYEARML22271A4582022-08-18018 August 2022 E-61283 Enclosure 4, 004 Chapter 1.5, Document No. DOS-19-021165-003-NPV, Version 2.0, Chapter 1.5 - Package Performance Characteristics (Public) ML22271A4862022-08-18018 August 2022 E-61283 Enclosure 4, 003 Chapter 1.4, Document No. DOS-19-021165-005-NPV, Version 1.0, Chapter 1.4 - Specifications Relating to the Packaging (Public) ML22271A4602022-08-18018 August 2022 E-61283 Enclosure 4, 005 Chapter 1.6, Document No. DOS-19-021165-004-NPV, Version 2.0, Chapter 1.6 - Compliance with Regulatory Requirements ML22271A4612022-08-18018 August 2022 E-61283 Enclosure 4, 006 Chapter 1.7, Document No. DOS-19-021165-006-NPV, Version 1.0, Chapter 1.7 - Instruction for Use of Packaging (Public) ML22271A4632022-08-18018 August 2022 E-61283 Enclosure 4, 007 Chapter 1.8, Document No. DOS-19-021165-007-NPV, Version 1.0, Chapter 1.8 - Maintenance Programme (Public) ML22271A4652022-08-18018 August 2022 E-61283 Enclosure 4, 008 Chapter 1.9, Document No. DOS-19-021165-008-NPV, Version 1.0, Chapter 1.9 - Quality Assurance ML22271A4812022-08-18018 August 2022 E-61283 Enclosure 4, 002c Ap 1.3-3 DOS-19-021165-021-NPV, Version 1.0, Appendix 1.3-3 - Impact Strength of Zr Alloys ML22271A4662022-08-18018 August 2022 E-61283 Enclosure 4, 009, Document No. DOS-19-021165-010-NPV, Version 1.0, Chapter - 2.1 Structural Analysis ML22271A8132022-08-0303 August 2022 E-61283, Enclosure 4, 010a1 Ap 2.2.1 FFP_D02-ARV-01-198-455, Revision a, Justification by CFO Simulation of the Thermal Behavior of the FCC Container; Replacing Former Chapters 2.2-1 (Pved DC 04 055) and 2.2-2 (NEPL-F 2018 DC 152) (Public) ML22271A8102022-08-0303 August 2022 E-61283 Enclosure 4, 009n Appendix 2.1-14 DOS-19-021165-012-NPV, Version 1.0, Variation in the Mechanical Properties of Shell and Screw Steels Between 40°C …(Public) ML22271A8082022-08-0303 August 2022 E-61283 Enclosure 4, 009l Appendix 2.1-12 DOS-13-00081778-112-NPV, Rev. 1, Appendix 2.1-12 FCC Packaging Rod Boxes - Proof of the Mechanical Strength of Box Equipment (Public) ML22271A4552022-08-0202 August 2022 E-61283 Enclosure 4, 003e Appendix 1.4-5, Document No. DOS-19-021166-010-NPV, Revision 0, Analysis of the Ageing Mechanisms of the Fcc3 and FCC4 Package Models (Public) ML22271A1862022-07-21021 July 2022 E-61283 Enclosure 6, Document No. DOS-18-016471-000, Versions 1.0 and 5.0, Summary of Changes Between Version 1.0 to Version 2.0 for Safety Analysis Report for FCC-3 (File: Nte 22-005637-000-2.0-FCC3) (Public) ML22271A4822022-06-0303 June 2022 E-61283 Enclosure 3, 002c1 Ap 1.3-3 Dwg FFDC05098-EN Npv, Revision 3.0, STR - Study Report (Public) ML20211L6882019-08-14014 August 2019 Redacted-French Approval Certificate of a Package Design, Number F/347/AF-96 (Revision Fs) in French ML22271A8092017-09-0101 September 2017 E-61283 Enclosure 4, 009m Ap 2.1-13 DOS-13-00081778-113-NPV, Revision 2, Appendix 2.1-13 Complimentary Analysis of FCC Package Behaviour in Accidental Drop Conditions (Public) ML22271A4502012-09-30030 September 2012 E-61283 Enclosure 4, 003b Appendix 1.4-2. Document No. DOS-13-00081779-042-NPV, Revision 1, Drawings of the FCC3 Package, Version 2 (Public) ML22271A4842012-04-30030 April 2012 E-61283 Enclosure 4, 002d Appendix 1.3-4, Document No. DOS-13-00081778-034-NPV, Revision 00, Appendix 1.3-4 - Test Report Leaching of Enriched Reprocessed Uranium (Eru) Pellets (Public) ML22271A4712012-04-30030 April 2012 E-61283 Enclosure 4, 009b Appendix 2.1-2, Document No. DOS-13-00081779-102-NPV, Revision 00, FCC3 Containers for Fresh Fuel Assemblies – Data for Fatigue Resistance Analysis of Lifting Boxes and Upper Shell (Public) ML22271A4682012-04-30030 April 2012 E-61283 Enclosure 4, 009a Appendix 2.1-1, Document No. DOS-13-00081779-101-NPV, Revision 00, Table of Contents, FCC3 Containers - Tie-down Diagrams, Areva (Public) ML22271A4542012-04-30030 April 2012 E-61283 Enclosure 4, 003d Appendix 1.4-4, Document No. DOS-13-00081779-044-NPV, Revision 00, Table of Contents, Photographs of the FCC3 Package (Public) ML22271A4522012-04-30030 April 2012 E-61283 Enclosure 4, 003c Appendix 1.4-3, Document No. DOS-13-00081778-043-NPV, Revision 00, Table of Contents, Summary of Toughness Tests ML22271A4772012-04-30030 April 2012 E-61283 Enclosure 4, 002a Appendix 1.3-1,Document No. DOS-13-00081779-031-NPV, Revision 00, Appendix 1.3-1 - Description of Fuel Rod Boxes for FCC3 Containers (Public) ML22271A6442010-07-0101 July 2010 E-61283 Enclosure 4, 009b1 Ap 2.1-2 F2, Document No. NEEL-F 2008 DC 117EN, Revision B, FCC3 Containers for Fresh Fuel Assemblies Data for the Fatigue Strength Analysis of the Lifting Boxes and Upper Shell (Public) ML22271A4702009-05-0101 May 2009 E-61283 Enclosure 4, 009a1 Appendix 2.1-1, FFDC05090-A EN Npv, FCC3 Containers - Lashing Diagrams (Public) ML22271A8022007-12-19019 December 2007 E61283, Enclosure 4, 013d1 Appendix 2.5-4, FF DC 04191, Revision B, Safety/Criticality Study for FCC4 Packages & 17x17XL Assemblies Justification for an Increased Cavity Cross Section (Public) ML22271A6392004-05-0404 May 2004 E-61283 Enclosure 4, 009G1 AP 2.1-7 TFXEDC2104-NPV, Rev. E, Modification of FCC Containers Choice of Prototype 2 Drop Configurations for Regulatory Tests (Public) 2022-08-03
[Table view] |
Text
Orano NPS Unrestricted Orano
SAFETY ANALYSIS CHAPTER 1.9 REPORT QUALITY ASSURANCE
Prepared by 0 orano FCC3 Verified by
Identification : DOS-19-021165-008-NPV Version : 1.0 Page 1 / 8
Tableofcontents Statusofrevision 2
- 1. PRINCIPLES 3
- 2. QUALITYASSURANCECLASSESAPPLICABLETOFCC3PACKAGEMODELS 4
- 3. COMMONQUALITYASSURANCEPROVISIONS 5
- 4. DESIGNANDSTUDIESQUALITYASSURANCE 8
Non-proprietary version Formulaire : PM04-4-MO-6 rev. 03 Unrestricted Orano Orano NPS Identification : DOS-19-021165-008-NPV Vers. 1.0 Page 2 of 8
Status of revision
Version I I I Date Purpose and record of revisions Prepared by / Verified by
Old reference: DOS-13-00081779-090
00 04/2012 Initial issue I I I
New reference: DOS-19-021165-008
1.0 See 1st page Update of the applicable versions Precision concerning the quality assurance provisions I I I
Non-proprietary version Formulaire : PM04-4-MO-6 rev. 03 Unrestricted Orano Orano NPS Identification : DOS-19-021165-008-NPV Vers. 1.0 Page 3 of 8
The rules and classification of activities relating to the FCC3 package models defined below are applicable to all activities starting after 30 April 2022.
For activities starting before 30 September 2013, the rules and classification defined in paragraph 7 of the safety analysis report TFX DC 2159 Rev. G are applicable.
This chapter describes general qualit y assurance provisions applicable to the various activities (design, manufacturing and testing, operation, maintenance and transportation). Quality assurance arrangements specific to manufacturing, operation and transport activi ties are defined in Chapter 1.7 of this Report, while the provisions specific to maintenance activities are defined in Chapter 1.8.
- 1. PRINCIPLES
The transport regulations in force as of the date of this Chapter require the application of quality assurance programmes covering:
Design,
Manufacturing and testing,
Use,
Maintenance,
Transport
for packages designed to hold radioactive materials.
These activities are the responsibility of various parties (applicant, owner, prime contractor, constructors, users, transporters, shippers, maint enance companies, etc.) who are all required to draw up their own appropriate quality assurance programmes and to issue and retain supporting documentation (records) relating to their activities.
It should be noted that the owner must have in its possession at all times all relevant records relating to the package, and the shipper must be in possession of all documents relating to shipping of the package.
As of the date of this document, the quality assurance programmes (or management systems depending on the text) may be based on the requirements set forth in one or more of the following documents referenced by way of example and to the extent applicable:
Code GS-R-Part 2: "Leadership and Management for Safety",
Safety Series TS-G-1.4 "Quality Assurance for the Safe transport of Radioactive Material" published by the IAEA,
Code 10 CFR 71 Subpart H published by USNRC,
ISO 9001 - 2015 version "Quality Management Systems".
A management system is a set of interlinked or interacting elements defining a policy and the objectives used to achieve objec tives in an efficient manner.
The document versions given in this chapter are thos e in force at the date of the operations (design, manufacture and testing, operation, maintenance and transport).
This safety analysis report, which contains safety analysis studies validating the design of the FCC3 package model, has been drawn up as part of Orano NPS and Framatome's Quality Management Systems which meet the requirements of the GS-R-Part 2 Code and ISO 9001-2015 standard.
Non-proprietary version Formulaire : PM04-4-MO-6 rev. 03 Unrestricted Orano Orano NPS Identification : DOS-19-021165-008-NPV Vers. 1.0 Page 4 of 8
The distribution of the responsibilities and the in terfaces between the two entities are defined by an organizing document of actions shared between Orano NPS and Framatome concerning the FCC3 product.
These Management Systems also cover the maint enance and manufacturing activities for which Orano NPS and Framatome are responsible.
The Quality Safety & Environment Management System (QSE-MS) applied by Orano NPS is described in a Manual supplemented by the set of documents referenced therein. This set of documents is referred to as the Methodological Re ference. It covers all Orano NPS processes and provides a basis for continual impr ovement of the QSE-MS system.
The Integrated Management System applied by Framatome is described in a specific document Manuel du Systme de Management Intégré de Framatome. It is then divided up by directives, processes, fuel procedures and completed of proc edures and fuel functioning notes. It manages the whole processes of Framatome Fuel and organises the continuous improvement of Framatome.
The management system defines and delimits the scope of authority and the responsibilities of the organisation and departments carrying out activities having an impact on safety, quality, health, security and the environment.
The Management System is supported by Quality Assurance arrangements designed to ensure that the activities, products or services conform to client requirements and/or objectives as well as internal, statutory and regulatory requirements. These arrangements include checks and inspections of the activities, products and services concerned.
- 2. QUALITY ASSURANCE CLASSES APPLICABLE TO FCC3 PACKAGE MODELS
2.1. Rules
A modulation of the quality assurance requirements is applied due to the unequal safety-related importance of the activities and components relating to the FCC3 package models.
The activities relating to the FCC3 packages are subject to Quality Assurance requirements depending on their safety-related importance. Various classes are defined. The component parts of the package are classified with reference to their importance to safety, reliability and maintainability.
The QA (Quality Assured) class corresponds to the application of a quality assurance programme compliant with the requirements of Code GS-R-Part 2 and ISO 9001-2015 standard.
The NQC (Non Quality Classified) class applies to standard or catalogue equipment, or simple services for which a certificate of conformity is the only requirement.
The classification is initially determined by the entity requesting package approval, whose activities, particularly those involving des ign and safety studies, are QA classified.
The other parties involved define, cascade-wise and with the agreement of their respective clients, the applicable classes of Quality Assu rance programmes relevant to their various activities, and, where necessa ry, apply specific monitoring and inspection requirements.
The requirements transmitted may be derived either directly from GS-R-Part 2 or equivalent standards, for example ISO 9001-2015 standard supplemented as appropriate.
Non-proprietary version Formulaire : PM04-4-MO-6 rev. 03 Unrestricted Orano Orano NPS Identification : DOS-19-021165-008-NPV Vers. 1.0 Page 5 of 8
2.2. Classification of activities relating to FCC3 package models.
Activity Applicable QA Class Packaging and components Design & Modification QA Manufacture QA Maintenance QA Packages Preparation of packages QA Loading, unloading and shipping QA Transport commissioning QA Transport QAP*
- Quality Assurance Programme adapted to the acti vity, for example as defined in IAEA Safety Series TS-G-1.4.
2.3. Classification of components of the FCC3 package model The following table lists the quality assuranc e classes applicable to the manufacture of the various components.
Components Applicable QA Class Resin pouring QA Shock absorbing covers QA Other components and services NQC
Unless otherwise stated, this classification is applicable to finished equipment, ready for use or integration.
The manufacture of this equipment may be broken down into sub-assemblies, components and/or elementary services, which in turn may be classified according to their individual contributions to the quality of the equipment. The level of inspection to carry out on the components is detailed in Chapter 1.4 of this Report.
- 3. COMMON QUALITY ASSURANCE PROVISIONS
This section describes general quality assurance arrangements to be applied across all activities (design, manufacture, maintenance, transport, etc.) fo r the various types of operations associated with compliance with a safety requirement (technical in spection, handling of non-conformities, archiving, etc.).
3.1. Arrangements relating to technical insp ections associated with compliance with a safety requirement
All non-documentary inspections are referred to as technical inspections. Technical inspections must be carried out by competent operators on the basis of documents specifying the tests involved and, where appropriate, verification of these tests. The verifications must be carried out by competent operators other than the persons who carried out the tests. The scope of these tests and verifications is adapted according to t he safety impact of the products and services concerned.
The tests and verifications must be documented (i nspection or test reports issued and signed by the operators carrying out the tests and verifications, etc.).
Before carrying out a technical inspection asso ciated with a safety requirement, the operator must:
Non-proprietary version Formulaire : PM04-4-MO-6 rev. 03 Unrestricted Orano Orano NPS Identification : DOS-19-021165-008-NPV Vers. 1.0 Page 6 of 8
Note the identification of the equipment used and check the validity of the calibration date.
Make sure that the equipment is capable of achieving the required ac curacy and reliability and that the ambient conditions are suitable.
3.2. Handling of non-conformities
All non-conformities found must be described and an appropriate resolution process defined through the necessary channels. The implementation and proper application of the decisions taken must be verified before the issue is signed off.
The impact of the non-conformity on safety must be assessed and taken into account in the decision-making process. Any variances between the package model as described in the drawings and requirements of this Report an d the actual equipment will only be accepted following an additional analysis demonstrating that the variances do not call into question the conclusions of this Safety Analysis Report.
If the competent authorities of the countries th rough which or to which the package is to be transported have defined declaration criteria, these authorities must be informed of any non-conformities with respect to their requirements.
3.3. Document control
3.3.1. Production of documents
Documents must be drawn up, checked, and if necessary approved, then distributed appropriately. The author(s) and checker(s) of the documents must be chosen having regard to the skills and competence required.
All documents containing safety-related requirements must be checked.
The person checking the document must be a person other than the author.
The approval signature signifies that a document is fit for use and confirms that the author and checker have the necessary competence to undertake these tasks.
In the case of manufacturing activities, maintenance and operation of the package (depending on the type of documentation not issued by the designer), the entity responsible for these operations (manufacturer, maintenance contractor, operator, etc.)
is responsible for ensuring the conformity of the documentation issued (operating procedures, etc.) with the requirements of t he safety analysis report received either directly or through a third party. This thir d party will then be required to guarantee the conformity of the documents transmitt ed with the safety analysis report.
3.3.2. Document archiving
All documents must be archived according to their importance for safety:
Documents meeting one of the following criteria must be permanently archived (the archiving period must be at least equal to the service life of the equipment concerned):
Proof of capability of the equipment to operate safely,
Periodic inspections, maintenance and, where necessary, repairs and modifications of the equipment,
Determination of the cause of an accident or equipment failure,
Regulatory, legal or c ontractual requirement,
Non-proprietary version Formulaire : PM04-4-MO-6 rev. 03 Unrestricted Orano Orano NPS Identification : DOS-19-021165-008-NPV Vers. 1.0 Page 7 of 8
Other documents must be archived, as the case may be, in accordance with legal, regulatory or contractual requirements.
3.3.3. Traceability
Current document versions must be recorded. These records must be used as a reference by all document users.
3.4. Management of subcontracting
3.4.1. Evaluation
The monitoring of subcontracted services must be carried out by means of inspections and/or audits. Inspections and audits must be carried out by qualified personnel authorised to perform these tasks. Ins pections and audits must be formalised and documented in reports.
3.4.2. Subcontracting of manufacturing activities
In the case of manufacturing, the applicat ion of Quality Assurance arrangements in relation to the type of subcontracted manufacturing services (pr oduction processes and inspection/test procedures) is obligatory.
The requirements must be defined in a set of manufacturing specifications containing general quality-related requirements, construction drawings, production and procurement specifications.
This document set must be checked to ensure conformity with the applicable requirements defined in the Safety Analysis Report and those relating specifically to Quality Assurance.
3.4.3. Design, studies and tests
Where part of the study, calculations or te sts are subcontracted, a study specification must be issued for use by the service provider. The specification must properly cover the applicable requirements, in particular t hose relating to Quality Assurance.
3.4.4. Transport activities
For transportation and its related services, the application of Quality Assurance arrangements is required depending on the mode of transport and/or type of content transported.
The requirements must be defined by a set of documentation containing general quality-related requirements, technical requirements relating to the operations to be carried out (tie-down, handling, etc.) and to the modes of transport (road, sea, etc.).
This document set must be checked to ensure conformity with the applicable requirements defined in the Safety Analysis Report and those relating specifically to Quality Assurance.
3.4.5. Maintenance
For maintenance services, the application of Quality Assurance arrangements is required depending on the type of equipment and activities concerned (processes and inspections).
The requirements must be defined in a se t of documentation containing general quality-related requirements and the technical requi rements relating to the operations to be carried out.
Non-proprietary version Formulaire : PM04-4-MO-6 rev. 03 Unrestricted Orano Orano NPS Identification : DOS-19-021165-008-NPV Vers. 1.0 Page 8 of 8
This document set must be checked to ensure conformity with the applicable requirements defined in the Safety Analysis Report and those relating specifically to Quality Assurance.
- 4. DESIGN AND STUDIES QUALITY ASSURANCE
4.1. Engineering
Before starting design work, the basic design data must be validated and all regulatory requirements listed.
4.1.1. Design drawings
These drawings must define the essential parameters as well as the functional dimensions of the package used in the calcul ations supporting this Safety Analysis Report.
The drawings must be verified in accordance with § 3.3.1.
4.1.2. Design output data
The output data from the design work comprises design definition documentation (design drawings, calculations, specifications, operating instructions, etc.) together with documents demonstrating compliance with safe ty-related requirements (safety analysis report, calculations, etc.).
All of these documents must be checked in accordance with § 3.3.1 prior to use.
4.2. Calculations
This section relates to the performance of calculations requiring the use of computer codes.
The verification of the calculations must be documented indicating the scope of the checks carried out. The verification of the results must be formalised by a signature. The checker must be a person other than the preparer or the author.
The use of computer codes is subject to the is suance or preparation of a qualification/validation document defining the scope and validity of the code.
4.3. Qualification tests
Qualification tests are carried out on models or systems (possibly at reduced scale). The representative nature of the model must be form ally studied. The applicable requirements and criteria must be defined in a test programme.
The models must be constructed in compliance with the procedures applicable to the manufacturing activity as defined in Chapter 1.7 of this Report.
A list of inspections and checks to be carried out during the test must be drawn up. These inspections and checks must be carried out in accordance with § 3.1.
The "measured" results obtained during the tests (dimensional measurements, leakage measurements, acceleration curves, etc.) must be documented in test reports.
Non-proprietary version