EPID:L-2022-DOT-0007, E-61283 Enclosure 5, Orano NPS Statement of Proprietary Information for the Application for the Validation Request for the FCC-3 Package (Approved, Closed) | |
Administration Results Other: ML22271A186, ML22271A189, ML22271A190, ML22271A450, ML22271A452, ML22271A454, ML22271A455, ML22271A458, ML22271A460, ML22271A461, ML22271A463, ML22271A465, ML22271A466, ML22271A468, ML22271A470, ML22271A471, ML22271A472, ML22271A474, ML22271A476, ML22271A477, ML22271A479, ML22271A481, ML22271A482, ML22271A484, ML22271A486, ML22271A487, ML22271A636, ML22271A637, ML22271A638, ML22271A639, ML22271A640, ML22271A641, ML22271A642, ML22271A643, ML22271A644, ML22271A645, ML22271A646, ML22271A647, ML22271A648, ML22271A649, ML22271A650, ML22271A675, ML22271A677, ML22271A678, ML22271A686, ML22271A688, ML22271A790, ML22271A791, ML22271A792, ML22271A793... further results | |
MONTHYEARML22271A6411998-08-19019 August 1998
[Table View]E-61283 Enclosure 4, 009h1 Ap 2.1-8 TFXDC2108EN Npv, Revision B, Modified RCC Container - Proto 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A6392004-05-0404 May 2004 E-61283 Enclosure 4, 009G1 AP 2.1-7 TFXEDC2104-NPV, Rev. E, Modification of FCC Containers Choice of Prototype 2 Drop Configurations for Regulatory Tests (Public) Project stage: Other ML22271A8002004-10-29029 October 2004 E61283, Enclosure 4, 013c1 Appendix 2.5-3, Document No. FF/DC/01106 Revision a, E0, Safety/Criticality Study of FCC3v2 Containers 14 X 14 8 Foot and 14 X 14 10 Foot Assemblies (Public) Project stage: Other ML22271A8022007-12-19019 December 2007 E61283, Enclosure 4, 013d1 Appendix 2.5-4, FF DC 04191, Revision B, Safety/Criticality Study for FCC4 Packages & 17x17XL Assemblies Justification for an Increased Cavity Cross Section (Public) Project stage: Other ML22271A6462009-01-0101 January 2009 E-61283 Enclosure 4, 009c1 Ap 2.1-3 Document No. NTC-08-00135891E-NPV, Revision No. 01E, Analysis of the Fatigue Strength of the FCC3/FCC4 Containers (Public) Project stage: Other ML22271A4702009-05-0101 May 2009 E-61283 Enclosure 4, 009a1 Appendix 2.1-1, FFDC05090-A EN Npv, FCC3 Containers - Lashing Diagrams (Public) Project stage: Other ML22271A8162009-06-27027 June 2009 E-61283 Enclosure 4, 010d1 Appendix 2.2-4, NTC-08-00118662E-NPV, Rev. 1E, Note on the Characterization of Resin Fs 69 Project stage: Other ML22271A6442010-07-0101 July 2010 E-61283 Enclosure 4, 009b1 Ap 2.1-2 F2, Document No. NEEL-F 2008 DC 117EN, Revision B, FCC3 Containers for Fresh Fuel Assemblies Data for the Fatigue Strength Analysis of the Lifting Boxes and Upper Shell (Public) Project stage: Other ML22271A8152012-04-0202 April 2012 E-61283 Enclosure 4, 010d Appendix 2.2-4 DOS-13-00081778-204-NPV, Rev. 00, Reference to 10373-B-1, Revision 3, Summary Note on the Characterization of Fs 69 Resin Project stage: Other ML22271A4712012-04-30030 April 2012 E-61283 Enclosure 4, 009b Appendix 2.1-2, Document No. DOS-13-00081779-102-NPV, Revision 00, FCC3 Containers for Fresh Fuel Assemblies – Data for Fatigue Resistance Analysis of Lifting Boxes and Upper Shell (Public) Project stage: Other ML22271A4682012-04-30030 April 2012 E-61283 Enclosure 4, 009a Appendix 2.1-1, Document No. DOS-13-00081779-101-NPV, Revision 00, Table of Contents, FCC3 Containers - Tie-down Diagrams, Areva (Public) Project stage: Other ML22271A4542012-04-30030 April 2012 E-61283 Enclosure 4, 003d Appendix 1.4-4, Document No. DOS-13-00081779-044-NPV, Revision 00, Table of Contents, Photographs of the FCC3 Package (Public) Project stage: Other ML22271A4522012-04-30030 April 2012 E-61283 Enclosure 4, 003c Appendix 1.4-3, Document No. DOS-13-00081778-043-NPV, Revision 00, Table of Contents, Summary of Toughness Tests Project stage: Other ML22271A4772012-04-30030 April 2012 E-61283 Enclosure 4, 002a Appendix 1.3-1,Document No. DOS-13-00081779-031-NPV, Revision 00, Appendix 1.3-1 - Description of Fuel Rod Boxes for FCC3 Containers (Public) Project stage: Other ML22271A4792012-04-30030 April 2012 E-61283 Enclosure 4, 002b Ap 1.3-2 DOS-13-00081779-032-NPV, Revision 00, Appendix 1.3-2 - Drawing of Fuel Rod Boxes for FCC3 Containers (Public) Project stage: Other ML22271A6432012-04-30030 April 2012 E-61283 Enclosure 4, 009j Ap 2.1-10 DOS-13-00081778-110-NPV, Revision 00, Container Prototype No. 2, Drop Test Report (Public) Project stage: Other ML22271A6422012-04-30030 April 2012 E-61283 Enclosure 4, 009i Ap 2.1-9 DOS-13-00081778-109-NPV, Revision 00, Container Prototype No. 1, Drop Test Report (Public) Project stage: Other ML22271A6402012-04-30030 April 2012 E-61283 Enclosure 4, 009h Ap 2.1-8 DOS-13-00081778-108-NPV, Revision 00, Modified RCC Container - Prototype 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A4842012-04-30030 April 2012 E-61283 Enclosure 4, 002d Appendix 1.3-4, Document No. DOS-13-00081778-034-NPV, Revision 00, Appendix 1.3-4 - Test Report Leaching of Enriched Reprocessed Uranium (Eru) Pellets (Public) Project stage: Other ML22271A6382012-04-30030 April 2012 E-61283 Enclosure 4, 009g Ap 2.1-7 DOS-13-00081778-107-NPV, Modification of RCC Containers - Selection of Drop Configurations for Prototype 2 in the Context of Regulatory Tests (Public) Project stage: Other ML22271A8012012-09-0303 September 2012 E61283, Enclosure 4, 013d Appendix 2.5-4 (FCC3-FCC4), DOS-13-00081778-504-00-NPV, Rev. 00, Reference to Ffdc 04191, Rev. B, Safety/Criticality Study for FCC4 Packages and 17x17 Xl Assemblies Justification for an Increased Cavity Cross Secti Project stage: Other ML22271A4502012-09-30030 September 2012 E-61283 Enclosure 4, 003b Appendix 1.4-2. Document No. DOS-13-00081779-042-NPV, Revision 1, Drawings of the FCC3 Package, Version 2 (Public) Project stage: Other ML22271A6452013-04-30030 April 2013 E-61283 Enclosure 4, 009c Ap 2.1-3, Document No. DOS-13-00081778-103-NPV, Revision 00, Analysis of the Fatigue Behaviour of FCC3/FCC4 Containers, Tn International Document (Public) Project stage: Other ML22271A7902016-03-31031 March 2016 E-61283 Enclosure 4, 010e Appendix 2.2-5, Document No. DOS-13-00081778-205-NPV, Revision 00, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes (Public) Project stage: Other ML22271A8092017-09-0101 September 2017 E-61283 Enclosure 4, 009m Ap 2.1-13 DOS-13-00081778-113-NPV, Revision 2, Appendix 2.1-13 Complimentary Analysis of FCC Package Behaviour in Accidental Drop Conditions (Public) Project stage: Other ML22271A6372021-10-0808 October 2021 E-61283 Enclosure 4, 009f1 Ap 2.1-6 FFDC04223-EN Npv Revision 4.0, Transportation in FCC Container Mechanical Aspects Related to a Change in the Fuel Assembly Materias (Public) Project stage: Other ML22271A7992022-04-29029 April 2022 E-61283, Enclosure 4, 013c Appendix 2.5-3, Document No. DOS-13-00081778-503-NPV, Revision 00, Reference Document No. Ffdc 01106, Rev. a, Criticality-safety Analysis of FCC3 Containers Version 2 – Assembly Types 14x14 8-foot and 14x14 10-foo Project stage: Other ML22271A1892022-05-10010 May 2022 E-61283 Enclosure 1, Certificate of the French Competent Authority F/347/AF-96 (Gy), FCC-3 Transport Package (English Version) Project stage: Other ML22271A1902022-05-10010 May 2022 E-61283 Enclosure 2, Certificate of the French Competent Authority F/347/AF-96 (Gy), FCC-3 Transport Package (French Version) (Public) Project stage: Other ML22271A6502022-05-13013 May 2022 E-61283 Enclosure 4, 009e1 Ap 2.1-5, Framatome, Document No. D02-ARV-01-186-616, Revision a, FCC 3 - Containers for Fresh Fuel Assemblies - Stacking Behaviour (Non-proprietary) Project stage: Other ML22271A4742022-05-16016 May 2022 E-61283 Enclosure 4, DOS-19-021165-001-NPV, Version 2.0, Chapter 1.2, Administrative Information (Public) Project stage: Other ML22271A4762022-05-18018 May 2022 E-61283 Enclosure 4, 002 DOS-19-021165-002-NPV, Chapter 1.3, Specifications Relating to Radioactive Content (Public) Project stage: Other ML22271A8072022-05-18018 May 2022 E-61283 Enclosure 4, 009k Appendix 2.1-11, Document No. DOS-19-021165-011-NPV, Version 1.o, Justification of the Performance of the FCC3 Shell Fasteners During a 9m Vertical Drop (Public) Project stage: Other ML22271A4822022-06-0303 June 2022 E-61283 Enclosure 3, 002c1 Ap 1.3-3 Dwg FFDC05098-EN Npv, Revision 3.0, STR - Study Report (Public) Project stage: Other ML22271A1862022-07-21021 July 2022 E-61283 Enclosure 6, Document No. DOS-18-016471-000, Versions 1.0 and 5.0, Summary of Changes Between Version 1.0 to Version 2.0 for Safety Analysis Report for FCC-3 (File: Nte 22-005637-000-2.0-FCC3) (Public) Project stage: Other ML22271A4552022-08-0202 August 2022 E-61283 Enclosure 4, 003e Appendix 1.4-5, Document No. DOS-19-021166-010-NPV, Revision 0, Analysis of the Ageing Mechanisms of the Fcc3 and FCC4 Package Models (Public) Project stage: Other ML22271A1842022-08-0202 August 2022 E-61283 Enclosure 5, Orano NPS Statement of Proprietary Information for the Application for the Validation Request for the FCC-3 Package Project stage: Request ML22271A8142022-08-0303 August 2022 E-61283 Enclosure 4, 010c Appendix 2.2-3, FS1-0062270, Rev. 1 (DOS-18-016472-017 (En), Rev. 1), Behavior of Rod Made of M5 Framatome or Zircaloy-4 Alloy Subjected to the IAEA Thermal Test in FCC Packaging (Public) Project stage: Other ML22271A1882022-08-0303 August 2022 E-61283, Transmittal Letter from Orano to DOT, Application for Validation of French Competent Authority Certificate F/347/AF-96 for Model No. FCC-3 Transport Package Project stage: Request ML22271A8112022-08-0303 August 2022 E-61283 Enclosure 4, 010 Chapter 2.2, Document No. DOS-19-021165-013-NPV, Version 1.0, Thermal Analysis (New Reference DOS-19-021165-013, Revision 1.0) (Public) Project stage: Other ML22271A7912022-08-0303 August 2022 E-61283 Enclosure 4, 010f Appendix 2.2-6 Document No. DOS-13-00081778-206-NPV, Revision 0, Thermal Behaviour of the FCC Packaging Under Normal Conditions of Transport (Public) Project stage: Other ML22271A8132022-08-0303 August 2022 E-61283, Enclosure 4, 010a1 Ap 2.2.1 FFP_D02-ARV-01-198-455, Revision a, Justification by CFO Simulation of the Thermal Behavior of the FCC Container; Replacing Former Chapters 2.2-1 (Pved DC 04 055) and 2.2-2 (NEPL-F 2018 DC 152) (Public) Project stage: Other ML22271A8122022-08-0303 August 2022 E-61283, Enclosure 4, 010a Appendix 2.2-1, DOS-19-021165-018-NPV, Version 1.0, Reference to D02-ARV-01-198-455 (Translation of D02-ARV-01- 167-814), Justification by Cfd Simulation of the Thermal Behavior of the FCC Container Project stage: Other ML22271A6772022-08-0303 August 2022 E-61283 Enclosure 4, 013a1 Appendix 2.5-1, Document No. FF/DC/00817 E0, Safety/Criticality Study of of FCC3 and FCC4 Containers 15x15 and 17x17 Assemblies 17x17 Xl, 17x17 EPR, 16x16 and 18x18 Assemblies (Non-Proprietary) Project stage: Other ML22271A6782022-08-0303 August 2022 E-61283 Enclosure 4, 013b Appendix 2.5-2, Document No. DOS-19-021165-016, Version 1.0, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes Project stage: Other ML22271A8102022-08-0303 August 2022 E-61283 Enclosure 4, 009n Appendix 2.1-14 DOS-19-021165-012-NPV, Version 1.0, Variation in the Mechanical Properties of Shell and Screw Steels Between 40°C …(Public) Project stage: Other ML22271A7922022-08-0303 August 2022 E-61283 Enclosure 4, 012 Appendix 2.4, Document No. DOS-13-00081778-400, Revision 1, Analysis of External Dose Rates (Public) Project stage: Other ML22271A8062022-08-0303 August 2022 E-61283 Enclosure 4, 013f, Appendix 2.5-6, Document No. FFDC00561EN, Criticality Safety Study-Fresh UO2 Fuel Transportation casks-Determining the Uncertainties Using Cristal, Revision 4 (Public) Project stage: Other ML22271A8082022-08-0303 August 2022 E-61283 Enclosure 4, 009l Appendix 2.1-12 DOS-13-00081778-112-NPV, Rev. 1, Appendix 2.1-12 FCC Packaging Rod Boxes - Proof of the Mechanical Strength of Box Equipment (Public) Project stage: Other ML22271A7982022-08-0303 August 2022 E-61283 Enclosure 4, 013b1 Appendix 2.5-2, Document No. FFDC01046E E0, Non-Proprietary, Safety/Criticality Study of Fcc3 and Fcc4 Containers Transport of Fuel Rods in Boxes (Public) Project stage: Other 2013-04-30 |
ML22271A354 | |
Person / Time | |
---|---|
Site: | Orano USA |
Issue date: | 08/18/2022 |
From: | Boyle R US Dept of Transportation, Pipeline & Hazardous Materials Safety Admin |
To: | Garcia-Santos N Division of Fuel Management |
Garcia-Santos N | |
Shared Package | |
ML22271A128 | List:
|
References | |
A33010, L-2022-DOT-0007 | |
Download: ML22271A354 (1) | |
Similar Documents at Orano USA | |
---|---|
Category:E-Mail
MONTHYEARML23174A0222023-06-22022 June 2023
[Table view]Email Dated June 22, 2023 from P. Vescovi (Orano) to N. Garcia Santos (Cc: R. Boyle, Dot), Confirmation of the Need Date for the Revalidation Recommendation Requests of the French Packages FCC-3 and FCC-4 (Docket Nos. 71-3083 and 71-3097, R ML23118A1062023-04-25025 April 2023 Email Dated April 25, 2023 from N. Garcia Santos (NRC) to R. Boyle (DOT) - Subject: Staggered RAIs for the Model No. FCC-3 (Material Properties, Structural Evaluation ML22343A1242022-12-0909 December 2022 Email from P. Vescovi (Tn Americas LLC) to N.Garcia Santos (Nrc), Subject: FCC-3 and FCC-4 - Rsi Letter, Tn Americas LLC Request of Additional Time to Address Rsis ML22285A0822022-10-12012 October 2022 Email from N. Garcia Santos (NRC) to R. Boyle (DOT) FCC-3 and FCC-4 Applications Deficiencies ML22271A3542022-08-18018 August 2022 Email from R. Boyle (DOT) to N. Garcia Santos (Nrc), - FCC3 Request for Review and Recommendation (Public) ML20118C1452020-04-14014 April 2020 Email Dated 4/14/20 from Pvescovi (Orano Tn) to Ngarcia Santos (NRC) Estimated FCC-3 and FCC-4 Shipping Schedule (Docket Nos. 71-3083 and 71-3097) 2023-06-22 |
Text
From: Boyle, Rick (PHMSA)
To: Garcia Santos, Norma Cc: Sumrall, Matthew (PHMSA); White, Bernie
Subject:
[External_Sender] FCC3: Request for Review and Recommendation Date: Thursday, August 18, 2022 3:26:44 PM Attachments: image002.png French Certificate.F347AF96.Revision Gy.pdf NRC Request for Review and Comment.Signed.pdf
Good afternoon Norma,
Thanks for reminding me to formally request NRC review and recommendation. One day I will be as good as the distinguished Bernie White. Please let me know if you need any additional information or support.
Formal request and French Certificate are attached.
Rick Boyle Chief, Radioactive Materials Transport