EPID:L-2022-DOT-0007, E-61283 Enclosure 5, Orano NPS Statement of Proprietary Information for the Application for the Validation Request for the FCC-3 Package (Approved, Closed) | |
Administration Results Other: ML22271A186, ML22271A189, ML22271A190, ML22271A450, ML22271A452, ML22271A454, ML22271A455, ML22271A458, ML22271A460, ML22271A461, ML22271A463, ML22271A465, ML22271A466, ML22271A468, ML22271A470, ML22271A471, ML22271A472, ML22271A474, ML22271A476, ML22271A477, ML22271A479, ML22271A481, ML22271A482, ML22271A484, ML22271A486, ML22271A487, ML22271A636, ML22271A637, ML22271A638, ML22271A639, ML22271A640, ML22271A641, ML22271A642, ML22271A643, ML22271A644, ML22271A645, ML22271A646, ML22271A647, ML22271A648, ML22271A649, ML22271A650, ML22271A675, ML22271A677, ML22271A678, ML22271A686, ML22271A688, ML22271A790, ML22271A791, ML22271A792, ML22271A793... further results | |
MONTHYEARML22271A6411998-08-19019 August 1998
[Table View]E-61283 Enclosure 4, 009h1 Ap 2.1-8 TFXDC2108EN Npv, Revision B, Modified RCC Container - Proto 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A6392004-05-0404 May 2004 E-61283 Enclosure 4, 009G1 AP 2.1-7 TFXEDC2104-NPV, Rev. E, Modification of FCC Containers Choice of Prototype 2 Drop Configurations for Regulatory Tests (Public) Project stage: Other ML22271A8002004-10-29029 October 2004 E61283, Enclosure 4, 013c1 Appendix 2.5-3, Document No. FF/DC/01106 Revision a, E0, Safety/Criticality Study of FCC3v2 Containers 14 X 14 8 Foot and 14 X 14 10 Foot Assemblies (Public) Project stage: Other ML22271A8022007-12-19019 December 2007 E61283, Enclosure 4, 013d1 Appendix 2.5-4, FF DC 04191, Revision B, Safety/Criticality Study for FCC4 Packages & 17x17XL Assemblies Justification for an Increased Cavity Cross Section (Public) Project stage: Other ML22271A6462009-01-0101 January 2009 E-61283 Enclosure 4, 009c1 Ap 2.1-3 Document No. NTC-08-00135891E-NPV, Revision No. 01E, Analysis of the Fatigue Strength of the FCC3/FCC4 Containers (Public) Project stage: Other ML22271A4702009-05-0101 May 2009 E-61283 Enclosure 4, 009a1 Appendix 2.1-1, FFDC05090-A EN Npv, FCC3 Containers - Lashing Diagrams (Public) Project stage: Other ML22271A8162009-06-27027 June 2009 E-61283 Enclosure 4, 010d1 Appendix 2.2-4, NTC-08-00118662E-NPV, Rev. 1E, Note on the Characterization of Resin Fs 69 Project stage: Other ML22271A6442010-07-0101 July 2010 E-61283 Enclosure 4, 009b1 Ap 2.1-2 F2, Document No. NEEL-F 2008 DC 117EN, Revision B, FCC3 Containers for Fresh Fuel Assemblies Data for the Fatigue Strength Analysis of the Lifting Boxes and Upper Shell (Public) Project stage: Other ML22271A8152012-04-0202 April 2012 E-61283 Enclosure 4, 010d Appendix 2.2-4 DOS-13-00081778-204-NPV, Rev. 00, Reference to 10373-B-1, Revision 3, Summary Note on the Characterization of Fs 69 Resin Project stage: Other ML22271A4712012-04-30030 April 2012 E-61283 Enclosure 4, 009b Appendix 2.1-2, Document No. DOS-13-00081779-102-NPV, Revision 00, FCC3 Containers for Fresh Fuel Assemblies – Data for Fatigue Resistance Analysis of Lifting Boxes and Upper Shell (Public) Project stage: Other ML22271A4682012-04-30030 April 2012 E-61283 Enclosure 4, 009a Appendix 2.1-1, Document No. DOS-13-00081779-101-NPV, Revision 00, Table of Contents, FCC3 Containers - Tie-down Diagrams, Areva (Public) Project stage: Other ML22271A4542012-04-30030 April 2012 E-61283 Enclosure 4, 003d Appendix 1.4-4, Document No. DOS-13-00081779-044-NPV, Revision 00, Table of Contents, Photographs of the FCC3 Package (Public) Project stage: Other ML22271A4522012-04-30030 April 2012 E-61283 Enclosure 4, 003c Appendix 1.4-3, Document No. DOS-13-00081778-043-NPV, Revision 00, Table of Contents, Summary of Toughness Tests Project stage: Other ML22271A4772012-04-30030 April 2012 E-61283 Enclosure 4, 002a Appendix 1.3-1,Document No. DOS-13-00081779-031-NPV, Revision 00, Appendix 1.3-1 - Description of Fuel Rod Boxes for FCC3 Containers (Public) Project stage: Other ML22271A4792012-04-30030 April 2012 E-61283 Enclosure 4, 002b Ap 1.3-2 DOS-13-00081779-032-NPV, Revision 00, Appendix 1.3-2 - Drawing of Fuel Rod Boxes for FCC3 Containers (Public) Project stage: Other ML22271A6432012-04-30030 April 2012 E-61283 Enclosure 4, 009j Ap 2.1-10 DOS-13-00081778-110-NPV, Revision 00, Container Prototype No. 2, Drop Test Report (Public) Project stage: Other ML22271A6422012-04-30030 April 2012 E-61283 Enclosure 4, 009i Ap 2.1-9 DOS-13-00081778-109-NPV, Revision 00, Container Prototype No. 1, Drop Test Report (Public) Project stage: Other ML22271A6402012-04-30030 April 2012 E-61283 Enclosure 4, 009h Ap 2.1-8 DOS-13-00081778-108-NPV, Revision 00, Modified RCC Container - Prototype 2 - Regulatory Test Programme (Public) Project stage: Other ML22271A4842012-04-30030 April 2012 E-61283 Enclosure 4, 002d Appendix 1.3-4, Document No. DOS-13-00081778-034-NPV, Revision 00, Appendix 1.3-4 - Test Report Leaching of Enriched Reprocessed Uranium (Eru) Pellets (Public) Project stage: Other ML22271A6382012-04-30030 April 2012 E-61283 Enclosure 4, 009g Ap 2.1-7 DOS-13-00081778-107-NPV, Modification of RCC Containers - Selection of Drop Configurations for Prototype 2 in the Context of Regulatory Tests (Public) Project stage: Other ML22271A8012012-09-0303 September 2012 E61283, Enclosure 4, 013d Appendix 2.5-4 (FCC3-FCC4), DOS-13-00081778-504-00-NPV, Rev. 00, Reference to Ffdc 04191, Rev. B, Safety/Criticality Study for FCC4 Packages and 17x17 Xl Assemblies Justification for an Increased Cavity Cross Secti Project stage: Other ML22271A4502012-09-30030 September 2012 E-61283 Enclosure 4, 003b Appendix 1.4-2. Document No. DOS-13-00081779-042-NPV, Revision 1, Drawings of the FCC3 Package, Version 2 (Public) Project stage: Other ML22271A6452013-04-30030 April 2013 E-61283 Enclosure 4, 009c Ap 2.1-3, Document No. DOS-13-00081778-103-NPV, Revision 00, Analysis of the Fatigue Behaviour of FCC3/FCC4 Containers, Tn International Document (Public) Project stage: Other ML22271A7902016-03-31031 March 2016 E-61283 Enclosure 4, 010e Appendix 2.2-5, Document No. DOS-13-00081778-205-NPV, Revision 00, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes (Public) Project stage: Other ML22271A8092017-09-0101 September 2017 E-61283 Enclosure 4, 009m Ap 2.1-13 DOS-13-00081778-113-NPV, Revision 2, Appendix 2.1-13 Complimentary Analysis of FCC Package Behaviour in Accidental Drop Conditions (Public) Project stage: Other ML22271A6372021-10-0808 October 2021 E-61283 Enclosure 4, 009f1 Ap 2.1-6 FFDC04223-EN Npv Revision 4.0, Transportation in FCC Container Mechanical Aspects Related to a Change in the Fuel Assembly Materias (Public) Project stage: Other ML22271A7992022-04-29029 April 2022 E-61283, Enclosure 4, 013c Appendix 2.5-3, Document No. DOS-13-00081778-503-NPV, Revision 00, Reference Document No. Ffdc 01106, Rev. a, Criticality-safety Analysis of FCC3 Containers Version 2 – Assembly Types 14x14 8-foot and 14x14 10-foo Project stage: Other ML22271A1892022-05-10010 May 2022 E-61283 Enclosure 1, Certificate of the French Competent Authority F/347/AF-96 (Gy), FCC-3 Transport Package (English Version) Project stage: Other ML22271A1902022-05-10010 May 2022 E-61283 Enclosure 2, Certificate of the French Competent Authority F/347/AF-96 (Gy), FCC-3 Transport Package (French Version) (Public) Project stage: Other ML22271A6502022-05-13013 May 2022 E-61283 Enclosure 4, 009e1 Ap 2.1-5, Framatome, Document No. D02-ARV-01-186-616, Revision a, FCC 3 - Containers for Fresh Fuel Assemblies - Stacking Behaviour (Non-proprietary) Project stage: Other ML22271A4742022-05-16016 May 2022 E-61283 Enclosure 4, DOS-19-021165-001-NPV, Version 2.0, Chapter 1.2, Administrative Information (Public) Project stage: Other ML22271A4762022-05-18018 May 2022 E-61283 Enclosure 4, 002 DOS-19-021165-002-NPV, Chapter 1.3, Specifications Relating to Radioactive Content (Public) Project stage: Other ML22271A8072022-05-18018 May 2022 E-61283 Enclosure 4, 009k Appendix 2.1-11, Document No. DOS-19-021165-011-NPV, Version 1.o, Justification of the Performance of the FCC3 Shell Fasteners During a 9m Vertical Drop (Public) Project stage: Other ML22271A4822022-06-0303 June 2022 E-61283 Enclosure 3, 002c1 Ap 1.3-3 Dwg FFDC05098-EN Npv, Revision 3.0, STR - Study Report (Public) Project stage: Other ML22271A1862022-07-21021 July 2022 E-61283 Enclosure 6, Document No. DOS-18-016471-000, Versions 1.0 and 5.0, Summary of Changes Between Version 1.0 to Version 2.0 for Safety Analysis Report for FCC-3 (File: Nte 22-005637-000-2.0-FCC3) (Public) Project stage: Other ML22271A4552022-08-0202 August 2022 E-61283 Enclosure 4, 003e Appendix 1.4-5, Document No. DOS-19-021166-010-NPV, Revision 0, Analysis of the Ageing Mechanisms of the Fcc3 and FCC4 Package Models (Public) Project stage: Other ML22271A1842022-08-0202 August 2022 E-61283 Enclosure 5, Orano NPS Statement of Proprietary Information for the Application for the Validation Request for the FCC-3 Package Project stage: Request ML22271A8142022-08-0303 August 2022 E-61283 Enclosure 4, 010c Appendix 2.2-3, FS1-0062270, Rev. 1 (DOS-18-016472-017 (En), Rev. 1), Behavior of Rod Made of M5 Framatome or Zircaloy-4 Alloy Subjected to the IAEA Thermal Test in FCC Packaging (Public) Project stage: Other ML22271A1882022-08-0303 August 2022 E-61283, Transmittal Letter from Orano to DOT, Application for Validation of French Competent Authority Certificate F/347/AF-96 for Model No. FCC-3 Transport Package Project stage: Request ML22271A8112022-08-0303 August 2022 E-61283 Enclosure 4, 010 Chapter 2.2, Document No. DOS-19-021165-013-NPV, Version 1.0, Thermal Analysis (New Reference DOS-19-021165-013, Revision 1.0) (Public) Project stage: Other ML22271A7912022-08-0303 August 2022 E-61283 Enclosure 4, 010f Appendix 2.2-6 Document No. DOS-13-00081778-206-NPV, Revision 0, Thermal Behaviour of the FCC Packaging Under Normal Conditions of Transport (Public) Project stage: Other ML22271A8132022-08-0303 August 2022 E-61283, Enclosure 4, 010a1 Ap 2.2.1 FFP_D02-ARV-01-198-455, Revision a, Justification by CFO Simulation of the Thermal Behavior of the FCC Container; Replacing Former Chapters 2.2-1 (Pved DC 04 055) and 2.2-2 (NEPL-F 2018 DC 152) (Public) Project stage: Other ML22271A8122022-08-0303 August 2022 E-61283, Enclosure 4, 010a Appendix 2.2-1, DOS-19-021165-018-NPV, Version 1.0, Reference to D02-ARV-01-198-455 (Translation of D02-ARV-01- 167-814), Justification by Cfd Simulation of the Thermal Behavior of the FCC Container Project stage: Other ML22271A6772022-08-0303 August 2022 E-61283 Enclosure 4, 013a1 Appendix 2.5-1, Document No. FF/DC/00817 E0, Safety/Criticality Study of of FCC3 and FCC4 Containers 15x15 and 17x17 Assemblies 17x17 Xl, 17x17 EPR, 16x16 and 18x18 Assemblies (Non-Proprietary) Project stage: Other ML22271A6782022-08-0303 August 2022 E-61283 Enclosure 4, 013b Appendix 2.5-2, Document No. DOS-19-021165-016, Version 1.0, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes Project stage: Other ML22271A8102022-08-0303 August 2022 E-61283 Enclosure 4, 009n Appendix 2.1-14 DOS-19-021165-012-NPV, Version 1.0, Variation in the Mechanical Properties of Shell and Screw Steels Between 40°C …(Public) Project stage: Other ML22271A7922022-08-0303 August 2022 E-61283 Enclosure 4, 012 Appendix 2.4, Document No. DOS-13-00081778-400, Revision 1, Analysis of External Dose Rates (Public) Project stage: Other ML22271A8062022-08-0303 August 2022 E-61283 Enclosure 4, 013f, Appendix 2.5-6, Document No. FFDC00561EN, Criticality Safety Study-Fresh UO2 Fuel Transportation casks-Determining the Uncertainties Using Cristal, Revision 4 (Public) Project stage: Other ML22271A8082022-08-0303 August 2022 E-61283 Enclosure 4, 009l Appendix 2.1-12 DOS-13-00081778-112-NPV, Rev. 1, Appendix 2.1-12 FCC Packaging Rod Boxes - Proof of the Mechanical Strength of Box Equipment (Public) Project stage: Other ML22271A7982022-08-0303 August 2022 E-61283 Enclosure 4, 013b1 Appendix 2.5-2, Document No. FFDC01046E E0, Non-Proprietary, Safety/Criticality Study of Fcc3 and Fcc4 Containers Transport of Fuel Rods in Boxes (Public) Project stage: Other 2013-04-30 |
Similar Documents at Orano USA | |
---|---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARML22271A8032023-08-0303 August 2023
[Table view]E-61283, Enclosure 4, 013e Appendix 2.5-5, DOS-13-00081778-505-NPV, Revision 00, Reference to FS1-0012857, Rev. 1.0, Criticality-Safety Study FCC4 Containers Justification of the Increase in the Cross Section of the Cavity (Public) ML22271A4722022-10-0606 October 2022 E-61283 Enclosure 4, 000 DOS-19-021165-000-NPV, Version 2.0, Table of Contents, FCC-3 Package (Public) ML22271A6752022-10-0303 October 2022 E-61283 Enclosure 4, 013a Appendix 2.5-1 DOS-19-021165-015-NPV, Version 1.0, Safety Criticality Study of FCC-3 and FCC-4 Containers-15x15 and 17x17 Assemblies-17x17 Xl, 17x17 EPR, 16x16 and 18x18 Assemblies (Public) ML22271A6482022-09-28028 September 2022 E-61283 Enclosure 4, 009d1 Ap 2.1-4, Document No. D02-ARV-01-186-614, Revision a, FCC 3 - Containers for Fresh Fuel Assemblies - Lifting Points Mechanical Verification (Public) ML22271A6862022-09-28028 September 2022 E-61283 Enclosure 4, 013e1 Appendix 2.5-5, Document No. FS1-0012857 E0, Revision 1.0, Safety Criticality Analysis FCC4 Fuel Shipping Casks Justification of the Enlarged Neutronic Cavity Section (Public) ML22271A6882022-09-28028 September 2022 E-61283 Enclosure 4, 013f1 Appendix 2.5-6, Document No. FFDC00561 E2 (Np), Revision 4.0, Safety-Criticality Study Fresh UO2 Fuel Fuel Transportation Casks Determining the Uncertainties to Apply to the Criticality Studies Performed Using Cri ML22271A6492022-09-28028 September 2022 E-61283 Enclosure 4, 009e Ap 2.1-5, Document No. DOS-19-021165-020-NPV, Revision 1.0, Update of the Calculation Note on the Stacking Strength (Public) ML22271A6472022-09-28028 September 2022 E-61283 Enclosure 4, 009d Ap 2.1-4, Document No. DOS-19-021165-019-NPV, Revision 1.0, Update of the Calculation Note on the Lifting Points Sizing (Public) ML22271A8052022-09-28028 September 2022 E-61283 Enclosure 4, 013f Appendix 2.5-6, Document No. DOS-13-00081778-506-NPV, Rev. 00, Criticality Safety Study, Transport Package for Fresh UO2 Fuel Determination of Uncertainties to Be Applied to Criticality Studies Performed with Crist ML22271A6362022-08-18018 August 2022 E-61283 Enclosure 4, 009f Appendix 2.1-6, Document No. DOS-19-021165-017-NPV, Version 1.0, Appendix 2.1-6 - Transportation in FCC Container Mechanical Aspects Related to a Change in the Fuel Assembly Materials (Public) ML22271A4872022-08-18018 August 2022 E-61283 Enclosure 4, 003a Appendix 1.4-1, Document No. DOS-19-021165-009-NPV, Version 1.0, Appendix 1.4-1 - Drawings of the FCC3 Packaging (Public) ML22271A7942022-08-0303 August 2022 E-61283 Enclosure 4, 013a Appendix 2.5-1, Document No. DOS-19-021165-015-NPV, Version 1.0, Safety Analysis Report (Public) ML22271A6772022-08-0303 August 2022 E-61283 Enclosure 4, 013a1 Appendix 2.5-1, Document No. FF/DC/00817 E0, Safety/Criticality Study of of FCC3 and FCC4 Containers 15x15 and 17x17 Assemblies 17x17 Xl, 17x17 EPR, 16x16 and 18x18 Assemblies (Non-Proprietary) ML22271A6782022-08-0303 August 2022 E-61283 Enclosure 4, 013b Appendix 2.5-2, Document No. DOS-19-021165-016, Version 1.0, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes ML22271A8112022-08-0303 August 2022 E-61283 Enclosure 4, 010 Chapter 2.2, Document No. DOS-19-021165-013-NPV, Version 1.0, Thermal Analysis (New Reference DOS-19-021165-013, Revision 1.0) (Public) ML22271A7912022-08-0303 August 2022 E-61283 Enclosure 4, 010f Appendix 2.2-6 Document No. DOS-13-00081778-206-NPV, Revision 0, Thermal Behaviour of the FCC Packaging Under Normal Conditions of Transport (Public) ML22271A7922022-08-0303 August 2022 E-61283 Enclosure 4, 012 Appendix 2.4, Document No. DOS-13-00081778-400, Revision 1, Analysis of External Dose Rates (Public) ML22271A7932022-08-0303 August 2022 E-61283 Enclosure 4, 013 Chapter 2.5, Version 1, Document No. DOS-19-021165-014-NPV, Safety Analysis Report-Criticality-Safety Analysis (Public) ML22271A8062022-08-0303 August 2022 E-61283 Enclosure 4, 013f, Appendix 2.5-6, Document No. FFDC00561EN, Criticality Safety Study-Fresh UO2 Fuel Transportation casks-Determining the Uncertainties Using Cristal, Revision 4 (Public) ML22271A7962022-08-0303 August 2022 E-61283 Enclosure 4, 013a1 Appendix 2.5-1, FF/DC/00817 E0, Revision 4, Safety/Criticality Study of FCC3 and FCC4 Containers 15x15 and 17x17 Assemblies 17x17 Xl, 17x17 EPR, 16x16 and 18x18 Assemblies (Public) ML22271A7972022-08-0303 August 2022 E-61283 Enclosure 4, 013b Appendix 2.5-2, Document No. DOS-19-021165-016-NPV, Version 1.0, Safety Analysis Report-Reference Ffdc 01046 E0, Version 3.0, Safety/Criticality Study of FCC3 and FCC4 Containers –Transport of Fuel Rods in Boxes (P ML22271A7982022-08-0303 August 2022 E-61283 Enclosure 4, 013b1 Appendix 2.5-2, Document No. FFDC01046E E0, Non-Proprietary, Safety/Criticality Study of Fcc3 and Fcc4 Containers Transport of Fuel Rods in Boxes (Public) ML22271A8142022-08-0303 August 2022 E-61283 Enclosure 4, 010c Appendix 2.2-3, FS1-0062270, Rev. 1 (DOS-18-016472-017 (En), Rev. 1), Behavior of Rod Made of M5 Framatome or Zircaloy-4 Alloy Subjected to the IAEA Thermal Test in FCC Packaging (Public) ML22271A8122022-08-0303 August 2022 E-61283, Enclosure 4, 010a Appendix 2.2-1, DOS-19-021165-018-NPV, Version 1.0, Reference to D02-ARV-01-198-455 (Translation of D02-ARV-01- 167-814), Justification by Cfd Simulation of the Thermal Behavior of the FCC Container ML22271A4762022-05-18018 May 2022 E-61283 Enclosure 4, 002 DOS-19-021165-002-NPV, Chapter 1.3, Specifications Relating to Radioactive Content (Public) ML22271A8072022-05-18018 May 2022 E-61283 Enclosure 4, 009k Appendix 2.1-11, Document No. DOS-19-021165-011-NPV, Version 1.o, Justification of the Performance of the FCC3 Shell Fasteners During a 9m Vertical Drop (Public) ML22271A4742022-05-16016 May 2022 E-61283 Enclosure 4, DOS-19-021165-001-NPV, Version 2.0, Chapter 1.2, Administrative Information (Public) ML22271A6502022-05-13013 May 2022 E-61283 Enclosure 4, 009e1 Ap 2.1-5, Framatome, Document No. D02-ARV-01-186-616, Revision a, FCC 3 - Containers for Fresh Fuel Assemblies - Stacking Behaviour (Non-proprietary) ML22271A1892022-05-10010 May 2022 E-61283 Enclosure 1, Certificate of the French Competent Authority F/347/AF-96 (Gy), FCC-3 Transport Package (English Version) ML22271A7992022-04-29029 April 2022 E-61283, Enclosure 4, 013c Appendix 2.5-3, Document No. DOS-13-00081778-503-NPV, Revision 00, Reference Document No. Ffdc 01106, Rev. a, Criticality-safety Analysis of FCC3 Containers Version 2 – Assembly Types 14x14 8-foot and 14x14 10-foo ML22271A6372021-10-0808 October 2021 E-61283 Enclosure 4, 009f1 Ap 2.1-6 FFDC04223-EN Npv Revision 4.0, Transportation in FCC Container Mechanical Aspects Related to a Change in the Fuel Assembly Materias (Public) ML22271A7902016-03-31031 March 2016 E-61283 Enclosure 4, 010e Appendix 2.2-5, Document No. DOS-13-00081778-205-NPV, Revision 00, Safety / Criticality Study of FCC3 and FCC4 Containers – Transport of Fuel Rods in Boxes (Public) ML22271A6452013-04-30030 April 2013 E-61283 Enclosure 4, 009c Ap 2.1-3, Document No. DOS-13-00081778-103-NPV, Revision 00, Analysis of the Fatigue Behaviour of FCC3/FCC4 Containers, Tn International Document (Public) ML22271A8012012-09-0303 September 2012 E61283, Enclosure 4, 013d Appendix 2.5-4 (FCC3-FCC4), DOS-13-00081778-504-00-NPV, Rev. 00, Reference to Ffdc 04191, Rev. B, Safety/Criticality Study for FCC4 Packages and 17x17 Xl Assemblies Justification for an Increased Cavity Cross Secti ML22271A6432012-04-30030 April 2012 E-61283 Enclosure 4, 009j Ap 2.1-10 DOS-13-00081778-110-NPV, Revision 00, Container Prototype No. 2, Drop Test Report (Public) ML22271A6422012-04-30030 April 2012 E-61283 Enclosure 4, 009i Ap 2.1-9 DOS-13-00081778-109-NPV, Revision 00, Container Prototype No. 1, Drop Test Report (Public) ML22271A6402012-04-30030 April 2012 E-61283 Enclosure 4, 009h Ap 2.1-8 DOS-13-00081778-108-NPV, Revision 00, Modified RCC Container - Prototype 2 - Regulatory Test Programme (Public) ML22271A6382012-04-30030 April 2012 E-61283 Enclosure 4, 009g Ap 2.1-7 DOS-13-00081778-107-NPV, Modification of RCC Containers - Selection of Drop Configurations for Prototype 2 in the Context of Regulatory Tests (Public) ML22271A4792012-04-30030 April 2012 E-61283 Enclosure 4, 002b Ap 1.3-2 DOS-13-00081779-032-NPV, Revision 00, Appendix 1.3-2 - Drawing of Fuel Rod Boxes for FCC3 Containers (Public) ML22271A8162009-06-27027 June 2009 E-61283 Enclosure 4, 010d1 Appendix 2.2-4, NTC-08-00118662E-NPV, Rev. 1E, Note on the Characterization of Resin Fs 69 ML22271A6462009-01-0101 January 2009 E-61283 Enclosure 4, 009c1 Ap 2.1-3 Document No. NTC-08-00135891E-NPV, Revision No. 01E, Analysis of the Fatigue Strength of the FCC3/FCC4 Containers (Public) ML22271A8002004-10-29029 October 2004 E61283, Enclosure 4, 013c1 Appendix 2.5-3, Document No. FF/DC/01106 Revision a, E0, Safety/Criticality Study of FCC3v2 Containers 14 X 14 8 Foot and 14 X 14 10 Foot Assemblies (Public) ML22271A6411998-08-19019 August 1998 E-61283 Enclosure 4, 009h1 Ap 2.1-8 TFXDC2108EN Npv, Revision B, Modified RCC Container - Proto 2 - Regulatory Test Programme (Public) 2023-08-03 |
Text
TN International APPENDIX 2.5-4 A AREVA Names Signatures Date
FCC3-FCC4 Prepared by
Ref. DOS-13-00081778-I I I 504-NPV Rev 00 Checked by
Form : PM04-3-MO-3 rev. 2 Page 1/2
TABLE OF CONTENTS
REFERENCE REV. TITLE
Safety/criticality study for fcc4 packages &
FFDC 04191 B 17x17 XL assemblies justification for an increased cavity cross section
Non-proprietary version TN International Ref. DOS-13-00081778-504-NPV Rev. 0 Page 2 / 2
REVISION STATUS
Revision Date Modifications Written /
Checked
0 09/2012 First issue